{"id":407286,"date":"2024-10-20T05:25:32","date_gmt":"2024-10-20T05:25:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aisc-acceleratedsteel-2022\/"},"modified":"2024-10-26T09:52:05","modified_gmt":"2024-10-26T09:52:05","slug":"aisc-acceleratedsteel-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aisc\/aisc-acceleratedsteel-2022\/","title":{"rendered":"AISC AcceleratedSteel 2022"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Accelerated Steel – Achieving Speed in Steel Bridge Fabrication <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1.0 INTRODUCTION <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2.0 FABRICATION <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 2.1 Estimating <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2.2 Bidding and Contracting <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.3 Scheduling 2.4 Planning <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2.5 Shop Drawing Production <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 2.6 Shop Drawing Approval <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 2.7 Material Procurement <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 2.8 Welding and Welding Procedures <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 2.9 Equipment Programming 2.10 Fabrication <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 2.11 Shop Assembly <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 2.12 Cleaning and Coating <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 2.13 Quality Control <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 2.14 Shipping <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 3.0 BEST PRACTICES ON BEHALF OF THE OWNER 3.1 Overview 3.2 Choosing an Engineer <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 3.3 The Engineer\u2019s Scope <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 3.4 Communications 3.5 Quality Verification <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 4.0 BEST PRACTICES ON BEHALF OF THE DESIGNER 4.1 Bridge Design <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 4.2 Construction Support <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 5.0 BEST PRACTICES ON BEHALF OF THE GENERAL CONTRACTOR 5.1 Communication <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 5.2 Field Information Needed from the General Contractor 5.3 Erection Practices and the Fabrication Schedule <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 5.4 Shop Instructions Reflecting the General Contractor\u2019s Preferences <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 5.5 Facilitating Approval of Routine Fabrication Practices <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 6.0 BEST PRACTICES ON DESIGN\/BUILD PROJECTS <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 6.1 Design\/Build Project Workflow and Roles <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 6.2 Working with the Fabricator\u2014Prebid <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 6.3 Working with the Fabricator\u2014After Award <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 6.4 Contract Cost Terms <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 6.5 Design Considerations <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 7.0 REFERENCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Accelerated Steel Achieving Speed in Steel Bridge Fabrication<\/b><\/p>\n |