ICC International Plumbing Code (IPC) 2000
$29.39
International Plumbing Code
Published By | Publication Date | Number of Pages |
ICC | 2000 | 139 |
Provides consistent requirements that can be used across the country to provide comprehensive regulation of plumbing systems. Setting minimum regulations for plumbing facilities in terms of both performance and prescriptive objectives, the IPC provides for the acceptance of new and innovative products, materials and systems. Features 14 chapters and appendices covering all major topics including water sizing, vent sizing and drain waste.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | INTERNATIONAL PLUMBING CODE |
2 | COPYRIGHT INFORMATION |
3 | PREFACE |
5 | SAMPLE ORDINANCE FOR ADOPTION |
7 | TABLE OF CONTENTS |
9 | CHAPTER 1: ADMINISTRATION Section 101 — GENERAL Section 102 — APPLICABILITY Section 103 — DEPARTMENT OF PLUMBING INSPECTION |
10 | Section 104 — DUTIES AND POWERS OF THE CODE OFFICIAL Section 105 — APPROVAL |
11 | Section 106 — PERMITS |
13 | Section 107 — INSPECTIONS AND TESTING |
14 | Section 108 — VIOLATIONS |
15 | Section 109 — MEANS OF APPEAL |
17 | CHAPTER 2: DEFINITIONS Section 201 — GENERAL Section 202 — GENERAL DEFINITIONS |
25 | CHAPTER 3: GENERAL REGULATIONS Section 301 — GENERAL Section 302 — EXCLUSION OF MATERIALS DETRIMENTAL TO THE SEWER SYSTEM Section 303 — MATERIALS |
26 | Section 304 — RODENTPROOFING Section 305 — PROTECTION OF PIPES AND PLUMBING SYSTEM COMPONENTS |
27 | Section 306 — TRENCHING, EXCAVATION AND BACKFILL Section 307 — STRUCTURAL SAFETY Section 308 — PIPING SUPPORT |
28 | Section 309 — FLOODPROOFING Section 310 — WASHROOM AND TOILET ROOM REQUIREMENTS |
29 | Section 311 — TOILET FACILITIES FOR WORKERS Section 312 — TESTS AND INSPECTIONS |
30 | Section 313 — EQUIPMENT EFFICIENCIES Section 314 — CONDENSATE DISPOSAL |
31 | CHAPTER 4: FIXTURES, FAUCETS AND FIXTURE FITTINGS Section 401 — GENERAL Section 402 — FIXTURE MATERIALS Section 403 — MINIMUM PLUMBING FACILITIES |
33 | Section 404 — ACCESSIBLE PLUMBING FACILITIES |
34 | Section 405 — INSTALLATION OF FIXTURES |
35 | Section 406 — AUTOMATIC CLOTHES WASHERS Section 407 — BATHTUBS Section 408 — BIDETS Section 409 — DISHWASHING MACHINES Section 410 — DRINKING FOUNTAINS |
36 | Section 411 — EMERGENCY SHOWERS AND EYEWASH STATIONS Section 412 — FLOOR DRAINS Section 413 — FOOD WASTE GRINDER UNITS Section 414 — GARBAGE CAN WASHERS Section 415 — LAUNDRY TRAYS Section 416 — LAVATORIES Section 417 — SHOWERS |
37 | Section 418 — SINKS Section 419 — URINALS Section 420 — WATER CLOSETS |
38 | Section 421 — WHIRLPOOL BATHTUBS Section 422 — HEALTH CARE FIXTURES AND EQUIPMENT |
39 | Section 423 — SPECIALTY PLUMBING FIXTURES Section 424 — FAUCETS AND OTHER FIXTURE FITTINGS Section 425 — FLUSHING DEVICES FOR WATER CLOSETS AND URINALS |
40 | Section 426 — MANUAL FOOD AND BEVERAGE DISPENSING EQUIPMENT |
41 | CHAPTER 5: WATER HEATERS Section 501 — GENERAL Section 502 — INSTALLATION Section 503 — CONNECTIONS |
42 | Section 504 — SAFETY DEVICES Section 505 — INSULATION |
43 | CHAPTER 6: WATER SUPPLY AND DISTRIBUTION Section 601 — GENERAL Section 602 — WATER REQUIRED Section 603 — WATER SERVICE Section 604 — DESIGN OF BUILDING WATER DISTRIBUTION SYSTEM |
45 | Section 605 — MATERIALS, JOINTS AND CONNECTIONS |
49 | Section 606 — INSTALLATION OF THE BUILDING WATER DISTRIBUTION SYSTEM |
50 | Section 607 — HOT WATER SUPPLY SYSTEM |
51 | Section 608 — PROTECTION OF POTABLE WATER SUPPLY |
56 | Section 609 — HEALTH CARE PLUMBING Section 610 — DISINFECTION OF POTABLE WATER SYSTEM Section 611 — DRINKING WATER TREATMENT UNITS Section 612 — SOLAR SYSTEMS |
57 | CHAPTER 7: SANITARY DRAINAGE Section 701 — GENERAL Section 702 — MATERIALS |
59 | Section 703 — BUILDING SEWER Section 704 — DRAINAGE PIPING INSTALLATION Section 705 — JOINTS |
62 | Section 706 — CONNECTIONS BETWEEN DRAINAGE PIPING AND FITTINGS Section 707 — PROHIBITED JOINTS AND CONNECTIONS Section 708 — CLEANOUTS |
63 | Section 709 — FIXTURE UNITS Section 710 — DRAINAGE SYSTEM SIZING |
65 | Section 711 — OFFSETS IN DRAINAGE PIPING IN BUILDINGS OF FIVE STORIES OR MORE |
66 | Section 712 — SUMPS AND EJECTORS |
67 | Section 713 — HEALTH CARE PLUMBING |
68 | Section 714 — COMPUTERIZED DRAINAGE DESIGN Section 715 — BACKWATER VALVES |
71 | CHAPTER 8: INDIRECT/SPECIAL WASTE Section 801 — GENERAL Section 802 — INDIRECT WASTES Section 803 — SPECIAL WASTES |
72 | Section 804 — MATERIALS, JOINTS AND CONNECTIONS |
73 | CHAPTER 9: VENTS Section 901 — GENERAL Section 902 — MATERIALS Section 903 — VENT STACKS AND STACK VENTS Section 904 — VENT TERMINALS |
74 | Section 905 — VENT CONNECTIONS AND GRADES Section 906 — FIXTURE VENTS Section 907 — INDIVIDUAL VENT Section 908 — COMMON VENT |
75 | Section 909 — WET VENTING Section 910 — WASTE STACK VENT Section 911 — CIRCUIT VENTING |
76 | Section 912 — COMBINATION DRAIN AND VENT SYSTEM Section 913 — ISLAND FIXTURE VENTING Section 914 — RELIEF VENTS—STACKS OF MORE THAN 10 BRANCH INTERVALS Section 915 — VENTS FOR STACK OFFSETS |
77 | Section 916 — VENT PIPE SIZING |
78 | Section 917 — AIR ADMITTANCE VALVES |
79 | Section 918 — ENGINEERED VENT SYSTEMS Section 919 — COMPUTERIZED VENT DESIGN |
81 | CHAPTER 10: TRAPS, INTERCEPTORS AND SEPARATORS Section 1001 — GENERAL Section 1002 — TRAP REQUIREMENTS Section 1003 — INTERCEPTORS AND SEPARATORS |
83 | Section 1004 — MATERIALS, JOINTS AND CONNECTIONS |
85 | CHAPTER 11: STORM DRAINAGE Section 1101 — GENERAL Section 1102 — MATERIALS |
86 | Section 1103 — TRAPS Section 1104 — CONDUCTORS AND CONNECTIONS Section 1105 — ROOF DRAINS Section 1106 — SIZE OF CONDUCTORS, LEADERS AND STORM DRAINS |
93 | Section 1107 — SECONDARY (EMERGENCY) ROOF DRAINS Section 1108 — COMBINED SANITARY AND STORM SYSTEM |
94 | Section 1109 — VALUES FOR CONTINUOUS FLOW Section 1110 — CONTROLLED FLOW ROOF DRAIN SYSTEMS Section 1111 — SUBSOIL DRAINS Section 1112 — BUILDING SUBDRAINS Section 1113 — SUMPS AND PUMPING SYSTEMS |
95 | CHAPTER 12: SPECIAL PIPING AND STORAGE SYSTEMS Section 1201 — GENERAL Section 1202 — MEDICAL GASES Section 1203 — OXYGEN SYSTEMS |
97 | CHAPTER 13: REFERENCED STANDARDS |
105 | APPENDIX A: PLUMBING PERMIT FEE SCHEDULE |
107 | APPENDIX B: RATES OF RAINFALL FOR VARIOUS CITIES |
109 | APPENDIX C: GRAY WATER RECYCLING SYSTEMS C101 — GRAY WATER RECYCLING SYSTEMS |
111 | APPENDIX D: DEGREE DAY AND DESIGN TEMPERATURES FOR CITIES IN THE UNITED STATES |
117 | APPENDIX E: SIZING OF WATER PIPING SYSTEM E101 — GENERAL E102 — INFORMATION REQUIRED E103 — SELECTION OF PIPE SIZE |
131 | APPENDIX F: STRUCTURAL SAFETY F101 — CUTTING, NOTCHING AND BORING IN WOOD MEMBERS |
133 | APPENDIX G: VACUUM DRAINAGE SYSTEM G101 — VACUUM DRAINAGE SYSTEM |
135 | INDEX A B C |
136 | D E F G H |
137 | I J K L M N O P |
138 | Q R S |
139 | T U V W |