2007 ASHRAE Handbook HVAC Applications Chapter17
$10.40
HVAC Applications Handbook – Chapter 17. Data Processing and Electronic Office Areas
Published By | Publication Date | Number of Pages |
ASHRAE | 2007 | 16 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Design Criteria Design Criteria Overview Overview Environmental Specifications Environmental Specifications |
3 | Temperature Temperature Temperature Rate of Change Temperature Rate of Change Humidity Humidity Filtration and Contamination Filtration and Contamination |
4 | Ventilation Ventilation Envelope Considerations Envelope Considerations Human Comfort Human Comfort Flexibility Flexibility Acoustics Acoustics Vibration Isolation and Seismic Restraint Vibration Isolation and Seismic Restraint HVAC Load Considerations HVAC Load Considerations |
5 | Datacom Equipment Datacom Equipment Load Considerations and Challenges Load Considerations and Challenges Ventilation and Infiltration Ventilation and Infiltration Electrical Equipment Electrical Equipment |
6 | Lights Lights People People Building Envelope Building Envelope Heating and Reheat Heating and Reheat Humidification Humidification High-Density Loads High-Density Loads HVAC Systems and Components HVAC Systems and Components Computer Room Air-Conditioning (CRAC) Units Computer Room Air-Conditioning (CRAC) Units |
7 | Central-Station Air-Handling Units Central-Station Air-Handling Units Chilled-Water Distribution Systems Chilled-Water Distribution Systems |
8 | Condenser Systems Condenser Systems Air-Conditioning Systems Air-Conditioning Systems Chillers Chillers Pumps Pumps Piping Piping Humidifiers Humidifiers Controls and Monitoring Controls and Monitoring |
9 | Air Distribution Air Distribution Equipment Placement and Airflow Patterns Equipment Placement and Airflow Patterns |
11 | Underfloor Plenum Supply Underfloor Plenum Supply |
12 | Overhead and Ceiling Plenum Supply Overhead and Ceiling Plenum Supply Return Air Return Air Computational Fluid Dynamics Simulation Computational Fluid Dynamics Simulation |
13 | Ancillary Spaces Ancillary Spaces Electrical Power Distribution and Conditioning Rooms Electrical Power Distribution and Conditioning Rooms Battery Rooms Battery Rooms Engine/Generator Rooms Engine/Generator Rooms Burn-In Rooms and Test Labs Burn-In Rooms and Test Labs Datacom Equipment Spare Parts Datacom Equipment Spare Parts Storage Spaces Storage Spaces |
14 | Other Systems and Considerations Other Systems and Considerations Fire Suppression Fire Suppression Commissioning Commissioning Serviceability Serviceability Availability and Redundancy Availability and Redundancy |
15 | Energy Conservation Energy Conservation References References Codes, Standards, and Guidelines Codes, Standards, and Guidelines |
16 | Other Publications Other Publications Bibliography Bibliography |