Shopping Cart

No products in the cart.

AWWA C517 2009

$75.83

AWWA C517-09: Resilient-Seated Cast-Iron Eccentric Plug Valves

Published By Publication Date Number of Pages
AWWA 2009 36
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This standard describes resilient-seated cast-iron eccentric plug valves, 3 in. (75mm) through 72 in. (1,800 mm) in diameter, with flanged, grooved, or mechanical-joint ends.

PDF Catalog

PDF Pages PDF Title
1 ANSI/AWWA C517-09
3 Committee Personnel
5 Contents
7 Foreword
I. Introduction.
8 II. Special Issues.
10 III. Use of This Standard.
12 IV. Major Revisions.
V. Comments.
13 AWWA Standard Resilient-Seated Cast-Iron
Eccentric Plug Valves

SECTION 1: GENERAL
Sec. 1.1 Scope
Sec. 1.2 Purpose
Sec. 1.3 Application
14 SECTION 2: REFERENCES
SECTION 3: DEFINITIONS
16 SECTION 4: REQUIREMENTS
Sec. 4.1 Permeation
Sec. 4.2 Data to Be Provided by the Manufacturer or Supplier
Sec. 4.3 Materials
17 Sec. 4.4 Design
18 Table 1 End-to-end dimensions for flanged-end valves
21 Table 2 Prototype actuator test cycles required
22 Sec. 4.5 Workmanship and Coating
23 SECTION 5: VERIFICATION
Sec. 5.1 Inspection
Sec. 5.2 Testing
Table 3 Minimum duration of shell and seat tests
24 Table 4 Valve test cycles required
25 Sec. 5.3 Rejection
SECTION 6: DELIVERY
Sec. 6.1 Marking
Sec. 6.2 Shipping
Sec. 6.3 Affidavit of Compliance
27 APPENDIX A Installation, Operation, and Maintenance of
Resilient-Seated Cast-Iron Eccentric Plug Valves

SECTION A.1: GENERAL
SECTION A.2: UNLOADING
SECTION A.3: STORAGE
28 SECTION A.4: INSPECTION PRIOR TO
INSTALLATION
SECTION A.5: INSTALLATION
Sec. A.5.1 Handling
Sec. A.5.2 Service Conditions
Sec. A.5.3 Buried Installations
Sec. A.5.4 Cleaning
29 Sec. A.5.5 Pipe Ends
Sec. A.5.6 Installation
30 Sec. A.5.7 Valve Boxes
Sec. A.5.8 Valves Installed in Vaults
SECTION A.6: TESTING
Sec. A.6.1 Leaks
Sec. A.6.2 Seat Leakage
31 SECTION A.7: RECORDS
SECTION A.8: OPERATION
Sec. A.8.1 Design Pressure
Sec. A.8.2 Input Torque
Sec. A.8.3 Sticking
SECTION A.9: MAINTENANCE
32 Sec. A.9.1 Normal Maintenance
Sec. A.9.2 Valve Exercising
Sec. A.9.3 Field Repairs
Sec. A.9.4 Isolation
Sec. A.9.5 Repair Testing
Sec. A.9.6 Valve Removal
AWWA C517 2009
$75.83