{"id":258073,"date":"2024-10-19T17:04:45","date_gmt":"2024-10-19T17:04:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16590-42014\/"},"modified":"2024-10-25T12:40:37","modified_gmt":"2024-10-25T12:40:37","slug":"bs-en-16590-42014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16590-42014\/","title":{"rendered":"BS EN 16590-4:2014"},"content":{"rendered":"
This part of EN 16590 provides general principles for the production, operation, modification and supporting processes of safety-related parts of control systems (SRP\/CS) on tractors used in agriculture and forestry, and on self-propelled ride-on machines and mounted, semi-mounted and trailed machines used in agriculture. It can also be applied to municipal equipment (e.g. street-sweeping machines). It specifies the characteristics and categories required of SRP\/CS for carrying out their safety functions.<\/p>\n
This part of EN 16590 is applicable to the safety-related parts of electrical\/electronic\/programmable electronic systems (E\/E\/PES), as these relate to mechatronic systems. It does not specify which safety functions, categories or performance levels are to be used for particular machines.<\/p>\n
Machine specific standards (type-C standards) can identify performance levels and\/or categories or they should be determined by the manufacturer of the machine based on risk assessment.<\/p>\n
It is not applicable to non-E\/E\/PES systems (e.g. hydraulic, mechanic or pneumatic).<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions 4 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5 Configuration management 5.1 Objectives 5.2 General 5.3 Prerequisites 5.4 Requirements <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.5 Work products 6 Verification and validation 6.1 Objectives 6.2 General 6.3 Prerequisites 6.4 Requirements 6.4.1 SRP design validation\/verification 6.4.2 Scope of safety validation\/verification <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6.4.3 Activities 6.4.4 Validation\/verification plan 6.4.5 Validation\/verification, test specification of hardware and software 6.4.6 Validation\/verification test specification of the complete system 6.4.7 Validation\/verification test specification <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.5 Work products 7 Product release 7.1 Objectives 7.2 General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Figure 1 \u2014 Approval hierarchy 7.3 Prerequisites 7.4 Requirements 7.4.1 Conditions for product release <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7.4.2 Documentation of product release 7.5 Work products 8 Production, production testing 8.1 Objectives 8.2 General 8.3 Prerequisites <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 8.4 Requirements 8.4.1 Production plan 8.4.2 Production test plan 8.4.3 Personnel 8.4.4 Process capability 8.4.5 Documentation 8.4.6 Non-compliance 8.4.7 Storage and transport conditions 8.5 Work products <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 9 Operation planning and maintenance (instructions for operating, servicing, repair, and decommissioning) 9.1 Objectives 9.2 General 9.3 Prerequisites 9.4 Requirements 9.4.1 General 9.4.2 Servicing schedule 9.4.3 Repair instructions <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 9.4.4 Service technician instructions 9.4.5 User information 9.4.6 Field observation 9.4.7 Storage and transport information 9.4.8 Decommissioning and disassembling 9.5 Work products <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 10 Modifications (change management) 10.1 General 10.2 Objectives 10.3 General 10.4 Prerequisites 10.5 Requirements 10.5.1 Product modification and improvement procedures <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Figure 2 \u2014 Example modification procedure model <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Figure 3 \u2014 Example operation and maintenance management model 10.5.2 Change request <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 10.5.3 Assessing impact of modification 10.5.4 Modification authorisation 10.6 Work products <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 11 Procedure for suppliers of SRS, subsystems and components 11.1 Objectives 11.2 General 11.3 Prerequisites 11.4 Requirements 11.4.1 General 11.4.2 Scope of requirements <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 11.4.3 Supplier selection 11.4.4 Project initiation 11.4.5 Project planning 11.4.6 Project execution <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 11.4.7 Confirmation measures for the development partners’ functional safety 11.4.8 System validation 11.5 Work products 12 Technical documentation 12.1 Objectives 12.2 Requirements 12.2.1 Document retention 12.2.2 Document structure <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex A (informative) Technical documentation checklist <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex ZA (informative) Relationship between this European Standard and the Essential Requirements of EU Machinery Directive 2006\/42\/EC <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tractors and machinery for agriculture and forestry. Safety-related parts of control systems – Production, operation, modification and supporting processes<\/b><\/p>\n |