{"id":287307,"date":"2024-10-19T19:28:21","date_gmt":"2024-10-19T19:28:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-tr-16732-32013\/"},"modified":"2024-10-25T16:22:06","modified_gmt":"2024-10-25T16:22:06","slug":"bsi-pd-iso-tr-16732-32013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-tr-16732-32013\/","title":{"rendered":"BSI PD ISO\/TR 16732-3:2013"},"content":{"rendered":"

This part of ISO\/TR 16732 deals with a fictitious propane storage facility dedicated to the reception of propane transported by tank wagons, the storage of propane in a pressurized vessel and the bulk shipment of propane by tank trucks. The fire risk assessment developed in this part of ISO\/TR 16732 is not intended to be exhaustive, but is given as an example to illustrate the application of ISO 16732-1 to an industrial facility.<\/p>\n

The scope of this part of ISO\/TR 16732 is further limited to design-phase strategies, including changes to the layout of the facility and selection of relevant fire safety strategies (implementation of risk reduction measures). Not included are strategies that operate during the operation phase, including process modifications.<\/p>\n

This part of ISO\/TR 16732 illustrates the value of fire risk assessment because multiple scenarios are analysed, and several design options are available, which may perform well or not depending on the considered scenario. Risk estimation is needed to determine the result of these different combinations, and overall measures of performance that can be compared between design options. If there were only one scenario of interest, or if the options all tended to perform the same way on all the scenarios, then a simpler type of engineering analysis would suffice.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\nSection sec_1
Section sec_2
Section sec_3
1\tScope
2\tNormative references
3\tTerms and definitions <\/td>\n<\/tr>\n
10<\/td>\nSection sec_4
Section sec_5
Section sec_5.1
Section sec_5.2
4\tApplicability of fire risk assessment
5\tOverview of fire risk management
5.1\tGeneral
5.2\tOverall description of the industrial facility <\/td>\n<\/tr>\n
11<\/td>\nSection sec_5.3
Figure fig_1
Figure fig_2
5.3\tPhenomenology of a BLEVE <\/td>\n<\/tr>\n
12<\/td>\nFigure fig_3
Table tab_1 <\/td>\n<\/tr>\n
13<\/td>\nFigure fig_4
Section sec_5.4
Table tab_2
Section sec_5.5
5.4\tRisk reduction measures
5.5\tPresentation of design options <\/td>\n<\/tr>\n
14<\/td>\nTable tab_3
Figure fig_5 <\/td>\n<\/tr>\n
15<\/td>\nFigure fig_6 <\/td>\n<\/tr>\n
16<\/td>\nSection sec_6
Section sec_6.1
Section sec_6.2
Section sec_6.2.1
Section sec_6.2.2
6\tSteps in fire risk estimation
6.1\tOverview of fire risk estimation
6.2\tUse of scenarios in fire risk assessment <\/td>\n<\/tr>\n
17<\/td>\nFigure fig_7 <\/td>\n<\/tr>\n
18<\/td>\nSection sec_6.2.3 <\/td>\n<\/tr>\n
19<\/td>\nSection sec_6.2.4
Section sec_6.2.5
Section sec_6.2.6
Section sec_6.2.7
Section sec_6.2.8
Section sec_6.3
Section sec_6.3.1
Section sec_6.3.2
6.3\tEstimation of frequency and probability <\/td>\n<\/tr>\n
20<\/td>\nFigure fig_8
Section sec_6.3.3 <\/td>\n<\/tr>\n
21<\/td>\nSection sec_6.3.4
Section sec_6.4
Section sec_6.4.1
Section sec_6.4.2
Section sec_6.4.3
Section sec_6.5
6.4\tEstimation of consequence
6.5\tCalculation of scenario fire risk and combined fire risk <\/td>\n<\/tr>\n
22<\/td>\nTable tab_4
Table tab_5 <\/td>\n<\/tr>\n
23<\/td>\nFigure fig_9 <\/td>\n<\/tr>\n
24<\/td>\nFigure fig_10
Figure fig_11 <\/td>\n<\/tr>\n
25<\/td>\nFigure fig_12
Figure fig_13 <\/td>\n<\/tr>\n
26<\/td>\nFigure fig_14
Table tab_6
Section sec_7
7\tUncertainty, sensitivity, precision, and bias <\/td>\n<\/tr>\n
27<\/td>\nSection sec_8
Section sec_8.1
Section sec_8.2
Figure fig_15
Section sec_8.2.1
Section sec_8.2.2
Section sec_8.2.3
8\tFire risk evaluation
8.1\tIndividual and societal risk
8.2\tRisk acceptance criteria <\/td>\n<\/tr>\n
28<\/td>\nSection sec_8.2.4
Section sec_8.3
8.3\tSafety factors and safety margins <\/td>\n<\/tr>\n
29<\/td>\nReference ref_1
Reference ref_2
Reference ref_3
Reference ref_4
Reference ref_5
Reference ref_6
Reference ref_7
Reference ref_8
Reference ref_9
Reference ref_10
Reference ref_11
Reference ref_12
Reference ref_13
Reference ref_14
Reference ref_15
Reference ref_16
Reference ref_17
Reference ref_18
Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Fire safety engineering. Fire risk assessment – Example of an industrial property<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2013<\/td>\n32<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":287312,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[236,2641],"product_tag":[],"class_list":{"0":"post-287307","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-13-220-01","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/287307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/287312"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=287307"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=287307"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=287307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}