{"id":385004,"date":"2024-10-20T03:28:38","date_gmt":"2024-10-20T03:28:38","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-122-1-2021\/"},"modified":"2024-10-26T06:18:15","modified_gmt":"2024-10-26T06:18:15","slug":"aci-122-1-2021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-122-1-2021\/","title":{"rendered":"ACI 122.1 2021"},"content":{"rendered":"

This code prescribes minimum design and construction requirements for mitigating thermal bridges in the building envelopes of new buildings and additions to existing buildings. It applies to buildings having concrete or masonry walls; masonry veneer, including veneer attached to frame walls; and balconies or components that extend through the building envelope. It also has criteria for metal thermal bridges in these buildings. This code is applicable to commercial and mid- to high-rise residential buildings that use either electricity or fossil fuel (regardless of the generation source). It can be used with applicable energy codes and standards. Keywords: thermal bridge<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nTITLE PAGE
PREFACE <\/td>\n<\/tr>\n
5<\/td>\nCHAPTER 1\u2014GENERAL
1.1\u2014Scope
1.2\u2014General <\/td>\n<\/tr>\n
6<\/td>\n1.3\u2014Purpose <\/td>\n<\/tr>\n
7<\/td>\nCHAPTER 2\u2014DEFINITIONS
2.1\u2014 <\/td>\n<\/tr>\n
8<\/td>\nCHAPTER 3\u2014REFERENCED STANDARDS <\/td>\n<\/tr>\n
9<\/td>\nCHAPTER 4\u2014GENERAL REQUIREMENTS
4.1\u2014Climate zones
4.2\u2014Mitigation of thermal bridges <\/td>\n<\/tr>\n
10<\/td>\n4.3\u2014U-factors for assemblies containing thermal bridges <\/td>\n<\/tr>\n
11<\/td>\nCHAPTER 5\u2014PRESCRIPTIVE METHOD
5.1\u2014Building envelope walls extending above the roof insulation <\/td>\n<\/tr>\n
12<\/td>\n5.2\u2014Balconies and projections <\/td>\n<\/tr>\n
13<\/td>\n5.4\u2014Other thermal bridges
5.3\u2014Shelf angles supporting masonry veneer <\/td>\n<\/tr>\n
15<\/td>\nCHAPTER 6\u2014BUILDING ENVELOPE TRADE-OFF METHOD
6.1\u2014Building envelope trade-off method <\/td>\n<\/tr>\n
16<\/td>\nCHAPTER 7\u2014WHOLE BUILDING SIMULATION METHOD
7.1\u2014Whole building simulation method <\/td>\n<\/tr>\n
17<\/td>\nREFERENCES
Authored documents <\/td>\n<\/tr>\n
18<\/td>\nAPPENDIX\u2014CLIMATE ZONE MAPS FOR USE WITH THE IECC AND ASHRAE\/IES 90.1 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ACI CODE-122.1-21: Thermal Bridge Mitigation for Buildings Having Concrete and Masonry Walls and Masonry Venee – Code Requirements and Commentary<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2021<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":385011,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-385004","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/385004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/385011"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=385004"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=385004"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=385004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}