{"id":422823,"date":"2024-10-20T06:43:06","date_gmt":"2024-10-20T06:43:06","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-244122023\/"},"modified":"2024-10-26T12:35:52","modified_gmt":"2024-10-26T12:35:52","slug":"bs-iso-244122023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-244122023\/","title":{"rendered":"BS ISO 24412:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Symbols and abbreviated terms 5 Test purpose 5.1 Thermal balance test <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.2 Thermal vacuum test 5.2.1 General purpose 5.2.2 Qualification test 5.2.3 Proto-flight test 5.2.4 Acceptance test 6 Test methods 6.1 Thermal balance test 6.1.1 Test description <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.1.2 Test conditions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.1.3 Basic requirements of test facilities 6.1.4 Monitoring during TBT 6.2 Thermal vacuum test 6.2.1 Test description <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.2.2 Test conditions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2.3 Basic requirements for test facilities 6.2.4 Monitoring during TVT 7 Test facility 7.1 Laboratory environment <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.2 Laboratory infrastructure 7.3 Test system 7.3.1 Overview 7.3.2 Chamber system <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.3.3 Vacuum system 7.3.4 Thermal system <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.3.5 Data acquisition system 7.3.6 MGSE 7.3.7 Contamination measurement and control system <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8 Test requirements 8.1 Test tolerance and accuracy <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.2 Test configuration 8.3 Temperature and heat flux measurement 8.3.1 General 8.3.2 Location of temperature monitoring point for test article 8.3.3 Location of temperature monitoring point for test equipment <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.4 Heating device selection 8.5 Safety requirements and recommendations 9 Test procedure 9.1 Test flow <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.2 Test procedure 9.2.1 General 9.2.2 Before test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.2.3 Test implementation 9.2.4 After test <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 10 Test interruption and handling 10.1 Interruption 10.1.1 Test facility malfunction 10.1.2 Test article malfunction 10.2 Interruption handling <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 11 Test documentation <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex A (informative) Main characteristic of a solar simulator <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex B (informative) An example of IR heater design flow for absorbed flux simulation method in TBT <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Space systems. Thermal vacuum environmental testing<\/b><\/p>\n |