ACI 132.2 2022
$48.21
ACI PRC-132.2-22: Responsibility in Concrete Rehabilitation Construction – Guide
Published By | Publication Date | Number of Pages |
ACI | 2022 |
This guide identifies and suggests allocation of responsibilities to various parties involved in concrete rehabilitation in the United States; however, the guidance presented may apply to contractual relationships addressing concrete construction in other parts of the world. This guide can be useful in evaluating existing contract documents for adequacy and balance with respect to responsibilities in concrete rehabilitation projects. In some cases, the responsibilities outlined carry the force of law. In others, there are options that could be incorporated into a particular contract. Keywords: concrete rehabilitation; contracts; responsibility.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | TITLE PAGE |
4 | CHAPTER 1—INTRODUCTION AND SCOPE 1.1—Introduction 1.2—Scope 1.3—Process |
5 | CHAPTER 2—DEFINITIONS CHAPTER 3—CONTRACTS |
7 | CHAPTER 4—DOCUMENT DEVELOPMENT 4.1—Process leading to contract document development 4.2—Codes 4.3—Contract documents |
8 | CHAPTER 5—OWNER 5.1—Project responsibility and authority 5.2—Definition of project 5.3—Contractual obligations 5.4—Quality assurance program and special inspections CHAPTER 6—LICENSED DESIGN PROFESSIONAL 6.1—Professional services 6.2—Standard of care |
9 | 6.3—Codes and regulations 6.4—Coordination 6.5—Condition assessment report and basis of design 6.6—Contract documents |
10 | 6.7—Delegated design 6.8—Submittal review 6.9—Construction phase site observations 6.10—Quality assurance CHAPTER 7—GENERAL CONTRACTOR 7.1—Construction |
11 | 7.2—Qualifications 7.3—Subcontractors 7.4—Prescriptive and performance specifications 7.5—Standard specifications 7.6—Project site control and safety 7.7—Quality control |
12 | CHAPTER 8—SPECIALTY SUBCONTRACTOR CHAPTER 9—SPECIALTY ENGINEER 9.1—Role and retention of specialty engineer 9.2—Specialty engineer 9.3—Design and submittal requirements CHAPTER 10—MATERIAL SUPPLIERS 10.1—Reinforcement systems |
13 | 10.2—Conventional concrete 10.3—Proprietary materials 10.4—Contract compliance CHAPTER 11—TESTING AND INSPECTION AGENCY 11.1—Contract requirements 11.2—Qualifications 11.3—Preconstruction meeting |
14 | CHAPTER 12—ALTERNATE PROJECT DELIVERY METHODS 12.1—Design-bid-build delivery 12.2—Construction management 12.3—Design/builder 12.4—Multiple prime contractors |
15 | CHAPTER 13—REFERENCES Authored documents |