Shopping Cart

No products in the cart.

ASHRAE Guideline 0 2013

$54.17

ASHRAE Guideline 0-2013 The Commissioning Process

Published By Publication Date Number of Pages
ASHRAE 2013 72
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

ASHRAE Guideline 0 presents best practices for applying whole-building commissioning to facilities. The principles and processes included apply to all phases of new construction and renovation projects and provide a uniform, integrated, and consistent approach to commissioning. ASHRAE Guideline 0 includes the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0. The 2013 edition of the guideline addresses changes to project delivery systems resulting from the evolution of whole-building commissioning in the life cycle and sustainable measurement and verification processes. It emphasizes the role of the owner in clearly documenting the Owner’s Project Requirements so they may be transferred to design criteria and construction documents in a way that provides consistency and continuity throughout the scope of the project. The roles and responsibilities of the owner and Commissioning Authority have been further outlined, and annexes have been updated to assist in further understanding the commissioning process.

PDF Catalog

PDF Pages PDF Title
1 ASHRAE Guideline 0-2013
3 CONTENTS
4 FOREWORD
1. PURPOSE
2. SCOPE
5 3. UTILIZATION
4. DEFINITIONS
6 5. PREDESIGN PHASE
10 6. DESIGN PHASE
14 7. CONSTRUCTION PHASE
18 8. OCCUPANCY/OPERATIONS PHASE
20 9. REFERENCES
21 NORMATIVE ANNEX A—GUID FOR DEVELOPING SUPPLEMENTARY TECHNICAL GUIDELINES FOR THE COMMISSIONING PROCESS
24 INFORMATIVE ANNEX B—COMMISSIONING PROCESS FLOW CHART
26 INFORMATIVE ANNEX C—COST AND BENEFITS OF THE COMMISSIONING PROCESS
27 INFORMATIVE ANNEX D—COMMISSIONING PROCESS DOCUMENTATION MATRIX
30 INFORMATIVE ANNEX E—COMMISSIONING PROCESS REQUEST FOR QUALIFICATIONS
33 INFORMATIVE ANNEX F—ROLES AND RESPONSIBILITIES
35 INFORMATIVE ANNEX G—COMMISSIONING PLAN
36 INFORMATIVE ANNEX H—ACCEPTANCE PLAN
38 INFORMATIVE ANNEX I—OWNER’S PROJECT REQUIREMENTS WORKSHOP GUIDANCE
40 INFORMATIVE ANNEX J—OWNER’S PROJECT REQUIREMENTS
44 INFORMATIVE ANNEX K—BASIS OF DESIGN (BoD)
45 INFORMATIVE ANNEX L—SPECIFICATIONS
51 INFORMATIVE ANNEX M—CONSTRUCTION CHECKLISTS
56 INFORMATIVE ANNEX N—QUALITY-BASED SAMPLING EXAMPLES
59 INFORMATIVE ANNEX O—SYSTEMS MANUAL
61 INFORMATIVE ANNEX P—TRAINING MANUAL AND TRAINING NEEDS
67 INFORMATIVE ANNEX Q—ADDENDA DESCRIPTION INFORMATION
ASHRAE Guideline 0 2013
$54.17