ASHRAE Guideline 1.3 2018
$47.13
ASHRAE Guideline 1.3-2018 – Building Operations and Maintenance Training for the HVAC&R Commissioning Process
Published By | Publication Date | Number of Pages |
ASHRAE | 2018 | 56 |
Guideline 1.3 provides methodologiesand formats for developing training plans, conducting training programs, anddocumenting training results for the operation and maintenance of buildingHVAC&R systems during the Commissioning (Cx) Process. In addition to offering immediate access to the content, the PDF download of this standard presents selected graphics in color for enhanced readability.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ASHRAE Guideline 1.3-2018 |
3 | CONTENTS |
4 | 1. PURPOSE 2. SCOPE 3. UTILIZATION 4. DEFINITIONS |
5 | 5. INTENT OF COMMISSIONING (CX) PROCESS TRAINING 6. PREDESIGN PHASE |
6 | 7. DESIGN PHASE |
8 | 8. CONSTRUCTION PHASE |
9 | 9. OCCUPANCY AND OPERATIONS PHASE |
10 | 10. ONGOING COMMISSIONING (OCX) PROCESS 11. EXISTING BUILDINGS—OTHER THAN ONGOING COMMISSIONING 12. REFERENCES |
12 | INFORMATIVE ANNEX A—TRAINING FLOWCHART |
13 | INFORMATIVE ANNEX B—TRAINING DOCUMENTATION AND VERIFICATION MATRIX |
15 | INFORMATIVE ANNEX C—GENERAL TRAINING RESOURCES |
16 | INFORMATIVE ANNEX D—NEEDS ASSESSMENT STRUCTURE |
17 | Table D-1 Predesign Phase Training Expectations Matrix |
18 | Table D-2 Design Phase Training Expectations Matrix |
19 | INFORMATIVE ANNEX E—TRAINING IN THE OWNER’S PROJECT REQUIREMENTS (OPR) |
20 | INFORMATIVE ANNEX F—TRAINING PLAN |
22 | INFORMATIVE ANNEX G—BUDGETING FOR TRAINING |
23 | INFORMATIVE ANNEX H—TRAINING INSTRUCTOR QUALIFICATIONS |
24 | INFORMATIVE ANNEX I—GENERAL TRAINING SPECIFICATIONS |
28 | INFORMATIVE ANNEX J—TRAINING CHECKLISTS |
29 | Table J-1 Training Types Checklist |
30 | Table J-2 Logistics Checklist |
33 | Table J-3 Verification Checklist |
34 | INFORMATIVE ANNEX K—TRAINING EFFECTIVENESS QUESTIONNAIRE |
35 | INFORMATIVE ANNEX L—TRAINING BEST PRACTICES |
38 | INFORMATIVE ANNEX M—TRAINING AGENDA |
41 | INFORMATIVE ANNEX N—CROSS REFERENCES TO TRAINING REQUIREMENTS IN ASHRAE COMMISSIONING DOCUMENTS N1. Summary of References to Training In ASHRAE Guideline 0, The Commissioning Process |
44 | N2. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 0.2, THE COMMISSIONING PROCESS FOR EXISTING BUILDING SYSTEMS AND ASSEMBLIES |
47 | N3. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.1, HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS |
49 | N4. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.4, PROCEDURES FOR PREPARING FACILITY SYSTEMS MANUALS |
51 | N5. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.5, THE COMMISSIONING PROCESS FOR SMOKE CONTROL SYSTEMS |
53 | N6. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE STANDARD 202, COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS |