Published By | Publication Date | Number of Pages |
ASME | 2013 | 48 |
B30.25 includes provisions that apply to the construction, installation, operation, inspection and maintenance of scrap and material handlers consisting of a base, a revolving upper structure with operator’s station(s), and a front for lifting scrap or materials using attachments such as magnets and grapples, and any variations thereof in which the equipment retains the same fundamental characteristics.
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | CONTENTS |
6 | FOREWORD |
8 | ASME B30 COMMITTEE ROSTER |
10 | B30 STANDARD INTRODUCTION SECTION I: SCOPE SECTION II: SCOPE EXCLUSIONS SECTION III: PURPOSE SECTION IV: USE BY REGULATORY AGENCIES SECTION V: EFFECTIVE DATE |
11 | SECTION VI: REQUIREMENTS AND RECOMMENDATIONS SECTION VII: USE OF MEASUREMENT UNITS SECTION VIII: REQUESTS FOR REVISION SECTION IX: REQUESTS FOR INTERPRETATION SECTION X: ADDITIONAL GUIDANCE |
13 | SUMMARY OF CHANGES |
15 | Chapter 25-0 Scope, Definitions, Personnel Competence, and References SECTION 25-0.1: SCOPE OF B30.25 SECTION 25-0.2: DEFINITIONS 25-0.2.1 Types of Scrap and Material Handlers 25-0.2.2 General |
16 | Figures Fig. 25-0.2.1-1 Crawler-Mounted Handler |
17 | Fig. 25-0.2.1-2 Pedestal-Mounted Handler |
18 | Fig. 25-0.2.1-3 Rail-Mounted Handler |
19 | Fig. 25-0.2.1-4 Wheel-Mounted Handler (Multiple Control Stations) |
20 | Fig. 25-0.2.1-5 Wheel-Mounted Handler (Single Control Station) |
21 | SECTION 25-0.3: PERSONNEL COMPETENCE |
22 | Fig. 25-0.2.2-1 Two-Piece Front |
23 | Fig. 25-0.2.2-2 Three-Piece Front |
24 | SECTION 25-0.4: REFERENCES |
25 | Chapter 25-1 Construction and Characteristics SECTION 25-1.1: LIFT CAPACITY 25-1.1.1 Lift Capacity — Calculation and Verification 25-1.1.2 Lift Capacity Chart 25-1.1.3 Rated Lift Capacity SECTION 25-1.2: BACKWARD STABILITY 25-1.2.1 Backward Stability 25-1.2.2 Backward Stability Conditions With Front Installed |
26 | 25-1.2.3 Backward Stability Conditions With Front Removed SECTION 25-1.3: SWING MECHANISM 25-1.3.1 Swing Control 25-1.3.2 Swing Braking Means and Locking Device SECTION 25-1.4: HANDLER TRAVEL 25-1.4.1 Travel Mechanism 25-1.4.2 Travel Brakes SECTION 25-1.5: CONTROLS 25-1.5.1 General |
27 | 25-1.5.2 Travel Controls 25-1.5.3 Front Controls 25-1.5.4 Auxiliary Controls SECTION 25-1.6: CABS 25-1.6.1 Construction |
28 | Fig. 25-1.5.2(b)-1 Wheel-Mounted Handler — Primary Travel Control Diagram Fig. 25-1.5.2(b)-2 Track-Mounted Handler — Primary Travel Control Diagram |
29 | Fig. 25-1.5.3(c)-1 Primary Front Controls — Three-Piece Fronts Fig. 25-1.5.3(c)-2 Primary Front Controls — Two-Piece Fronts |
30 | 25-1.6.2 Construction of Elevating Cabs 25-1.6.3 Platforms 25-1.6.4 Access to Cab SECTION 25-1.7: GENERAL REQUIREMENTS 25-1.7.1 Identification 25-1.7.2 Exhaust Gases |
31 | 25-1.7.3 Fronts 25-1.7.4 Outriggers/Stabilizers 25-1.7.5 Rail-Mounted Handlers 25-1.7.6 Welded Construction 25-1.7.7 Guards for Moving Parts 25-1.7.8 Hydraulic and Pneumatic Line Protection 25-1.7.9 Lubricating Points 25-1.7.10 Handler Modifications 25-1.7.11 Miscellaneous SECTION 25-1.8: ELECTRICAL EQUIPMENT 25-1.8.1 Lifting Magnets |
32 | SECTION 25-1.9: INSTRUCTION MANUALS |
33 | Chapter 25-2 Inspection, Testing, and Maintenance SECTION 25-2.1: INSPECTION — GENERAL 25-2.1.1 Inspection Classification 25-2.1.2 Frequent Inspection 25-2.1.3 Periodic Inspection |
34 | 25-2.1.4 Handlers Not in Regular Use 25-2.1.5 Inspection Records SECTION 25-2.2: TESTING 25-2.2.1 Operational Tests SECTION 25-2.3: MAINTENANCE 25-2.3.1 Preventive Maintenance 25-2.3.2 Maintenance Procedure |
35 | 25-2.3.3 Adjustments and Repairs 25-2.3.4 Lubrication |
36 | Chapter 25-3 Operation SECTION 25-3.1: QUALIFICATIONS AND RESPONSIBILITIES 25-3.1.1 Qualified Operators 25-3.1.2 Requirements for Qualified Operators 25-3.1.3 Responsibilities 25-3.1.3.1 Responsibilities of the Owner and User 25-3.1.3.1.1 |
37 | 25-3.1.3.1.2 25-3.1.3.2 Responsibilities of the Operator. 25-3.1.3.2.1 SECTION 25-3.2: HANDLING THE LOAD 25-3.2.1 Size of Load |
38 | 25-3.2.2 Holding the Load 25-3.2.3 Moving the Load 25-3.2.4 Personnel SECTION 25-3.3: SIGNALS 25-3.3.1 Standard Signals 25-3.3.2 Hand Signals 25-3.3.3 Special Signals 25-3.3.4 Instructions SECTION 25-3.4: MISCELLANEOUS 25-3.4.1 Cab Protection 25-3.4.2 Rail Clamps 25-3.4.3 Ballast or Counterweight 25-3.4.4 Rerailing Rail-Mounted Handlers |
39 | Fig. 25-3.3.2-1 Material Handler Hand Signals |
42 | 25-3.4.5 Swinging Rail-Mounted Locomotive Handlers 25-3.4.6 Footing 25-3.4.7 Storage 25-3.4.8 Refueling 25-3.4.9 Fire Extinguishers 25-3.4.10 Working Near Power Lines Table Table 25-3.4.10-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines |
43 | ASME B30.25 INTERPRETATIONS |
44 | Interpretation: 25-02 |