ASME BPVC III 1 NH 2015
$377.00
ASME BPVC – III – 1 – NH -2015 BPVC Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NH, Class 1 Components in Elevated Temperature Service
Published By | Publication Date | Number of Pages |
ASME | 2015 | 230 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
45 | NH-3133-1 Size Restrictions on Connections |
52 | NH-3217-1 Classification of Stress Intensity in Vessels for Some Typical Cases |
54 | NH-3217-2 Classification of Stress Intensity in Piping, Typical Cases |
59 | NH-3225-1 Tensile Strength Values, Su |
60 | NH-3225-2 Tensile and Yield Strength Reduction Factor Due to Long Time Prior Elevated Temperature Service NH-3225-3A Yield Strength Reduction Factors for 21/4Cr‐1Mo |
61 | NH-3225-3B Tensile Strength Reduction Factors for 21/4Cr‐1Mo |
62 | NH-3225-4 Tensile Strength Reduction Factors for 9Cr‐1Mo‐V |
67 | NH-3352-1 Typical Butt Joints |
69 | NH-3410.2-1 Typical Single Volute Casing |
70 | NH-3410.2-2 Typical Double Volute Casing |
71 | NH-3421.11-1 Minimum Tangential Inlet and Outlet Wall Thickness |
73 | NH-3642.1-1 Bend Radius Versus Thickness |
77 | NH-4212-1 Permissible Time/Temperature Conditions for Material Which Has Been Cold Worked > 5% and < 20% and Subjected to Short‐Time High Temperature Transients |
227 | NH-U-1 Recommended Restrictions |