ASME BPVC VII 2010
$377.00
ASME BPVC – VII -2010 BPVC Section VII, Recommended Guidelines for the Care of Power Boilers
Published By | Publication Date | Number of Pages |
ASME | 2010 | 158 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | CONTENTS |
9 | LIST OF SECTIONS |
11 | FOREWORD |
13 | STATEMENT OF POLICY |
14 | PERSONNEL |
26 | INTRODUCTION |
27 | SUMMARY OF CHANGES |
29 | SUBSECTION C1 FUNDAMENTALS C1.100 STEAM GENERATION C1.200 BOILER TYPES |
30 | C1.300 PACKAGE BOILERS C1.400 FIELD- ASSEMBLED BOILERS C1.500 COMBUSTION FIGURES FIG. C1.2-1 SIMPLE STEAM DRUM FIG. C1.2-2 STEAM DRUM WITH TUBES |
31 | FIG. C1.2-3a STEAM DRUM INTERNALS — BAFFLE TYPE FIG. C1.2-3b STEAM DRUM INTERNALS DOUBLE-ROW ARRANGEMENT,CYCLONE SEPARATOR TYPE |
32 | C1.600 BOILER EFFICIENCY |
33 | SUBSECTION C2 BOILER OPERATION C2.100 GENERAL GUIDELINES |
34 | C2.200 PREPARING FOR OPERATION |
37 | C2.300 STARTING UP |
39 | C2.400 ON- LINE OPERATION |
43 | C2.500 OUT- OF- SERVICE OPERATION |
46 | SUBSECTION C3 BOILER AUXILIARIES C3.100 PREPARATION OF AUXILIARIES FOR SERVICE C3.200 FUEL- BURNING EQUIPMENT FIGURES FIG. C3.2-1 TYPICAL PILOT AND GAS PIPING ARRANGEMENT |
47 | FIG. C3.2-2 TYPICAL FUEL OIL TRAIN |
49 | FIG. C3.2-3 TYPICAL UNDERFEED STOKER FIG. C3.2-4 FEEDER–DISTRIBUTOR FOR FIRING OF COAL ON A SPREADER STOKER |
52 | FIG. C3.2-5 SPREADER STOKER, CONTINUOUS ASH DISCHARGE GRATE |
53 | FIG. C3.2-6 TYPICAL BOWL MILL |
56 | FIG. C3.2-7 TYPICAL IMPACT MILL |
57 | FIG. C3.2-8 ARRANGEMENT OF BALL-TUBE MILL FIG. C3.2-9 BURNER FOR HORIZONTAL FIRING OF COAL |
59 | C3.300 AIR HEATERS |
60 | FIG. C3.3-1 TYPICAL TUBULAR AIR HEATER |
61 | FIG. C3.3-2 TYPICAL REGENERATIVE AIR HEATER |
62 | C3.400 ECONOMIZERS FIG. C3.3-3 DETAILS OF REGENERATIVE AIR PREHEATER, BISECTOR TYPE |
63 | FIG. C3.4-1 TYPICAL ECONOMIZER |
64 | C3.500 BOILER FEED PUMPS C3.600 AUXILIARY DRIVES |
65 | FIG. C3.5-1 TYPICAL CENTRIFUGAL BOILER FEED PUMP, WATER CONNECTIONS |
66 | FIG. C3.6-1 TYPICAL MOTOR DRIVE FIG. C3.6-2 TYPICAL SINGLE STAGE TURBINE DRIVE |
67 | FIG. C3.6-3 TYPICAL TURBINE DRIVE ARRANGEMENT |
68 | C3.700 DRAFT FANS C3.800 DAMPERS |
69 | FIG. C3.7-1 AIRFOIL BLADE CENTRIFUGAL FAN WITH INLET VANE CONTROL FIG. C3.8-1 TYPICAL OUTLET FAN DAMPERS (MULTILOUVER) |
71 | SUBSECTION C4 APPURTENANCES C4.100 SAFETY VALVES |
72 | FIGURES FIG. C4.1-1 SAFETY VALVE NAMEPLATE |
73 | FIG. C4.1-2 TYPICAL SAFETY VALVE |
74 | FIG. C4.1-3 RECOMMENDED SAFETY VALVE INSTALLATION |
76 | FIG. C4.1-4 APPLICATION OF TEST GAG |
77 | FIG. C4.1-5 HYDRAULIC LIFT ASSIST DEVICE |
78 | C4.200 SAFETY RELIEF VALVES OR RELIEF VALVES |
79 | FIG. C4.2-1 TEST APPARATUS FOR SEAT TIGHTNESS TABLE TABLE C4.2-1 LEAKAGE RATES FOR SAFETY RELIEF VALVES FOR SET PROCEDURES |
80 | C4.300 PRESSURE GAGES |
81 | C4.400 FUSIBLE PLUGS C4.500 FEEDWATER REGULATOR VALVE C4.600 BLOWDOWN C4.700 SOOT BLOWERS |
83 | SUBSECTION C5 INSTRUMENTATION, CONTROLS, AND INTERLOCKS C5.100 GENERAL C5.200 INDICATORS AND RECORDERS |
84 | C5.300 CONTROLS AND INTERLOCKS |
86 | SUBSECTION C6 INSPECTION C6.100 SCOPE C6.200 INSPECTION FREQUENCY FIGURES FIG. C6.1-1 TYPICAL BOILER WATER LEVEL GAGE INSTALLATION |
87 | C6.300 PREPARATION FOR INSPECTION C6.400 INSPECTION OF INTERNAL SURFACES AND PARTS |
88 | FIG. C6.3-1 TYPICAL VALVE LINEUP PRIOR TO INSPECTION |
90 | FIG. C6.4-1 TYPICAL STAYS |
91 | FIG. C6.4-2 TYPICAL FORMS OF FUSIBLE PLUGS |
92 | C6.500 INSPECTION OF EXTERNAL SURFACES AND PARTS |
93 | C6.600 CARE AND MAINTENANCE |
94 | C6.700 REPAIRS C6.800 HYDROSTATIC TEST C6.900 BOILERS — GENERAL |
95 | C6.1000 AUTHORIZED INSPECTOR |
96 | SUBSECTION C7 REPAIRS, ALTERATIONS, AND MAINTENANCE C7.100 REPAIRS AND ALTERATIONS C7.200 MAINTENANCE |
97 | C7.300 BOILER MAINTENANCE PROGRAMS |
98 | C7.400 STEAM BOILERS |
104 | SUBSECTION C8 CONTROL OF INTERNAL CHEMICAL CONDITIONS C8.100 GENERAL C8.200 INTERNAL CLEANING OF BOILERS |
105 | C8.300 LAYING UP OF BOILERS |
106 | C8.400 DEPOSITS |
107 | FIGURE FIG. C8.4-1 SCALE CAUSING OVERHEATING AND TUBE FAILURE FIG. C8.4-2 DEPOSIT EFFECT ON BOILER TUBE VERSUS TUBE TEMPERATURE |
108 | C8.500 INTERNAL CORROSION |
109 | FIG. C8.5-1 OXYGEN CORROSION IN AN ECONOMIZER TUBE FIG. C8.5-2 CAUSTIC GOUGE-TYPE ATTACK ON BOILER TUBE |
110 | FIG. C8.5-3 CHELATE ATTACK CAUSED BY EXCESSIVE FEED OF CHEMICAL |
111 | FIG. C8.5-4 CO2 CARBONIC ACID ATTACK ON CONDENSATE PIPE FIG. C8.5-5 OXYGEN ATTACK ON CONDENSATE PIPE |
112 | C8.600 CORROSION CRACKING OF BOILER STEEL |
113 | C8.700 STEAM CONTAMINATION |
114 | FIG. C8.6-1 H+ DAMAGE ON BOILER TUBE |
115 | C8.800 SAMPLING, TESTING, CONTROLLING, AND REPORTING OF ANALYSES OF WATER C8.900 FIRE- SIDE CONDITIONS TABLE TABLE C8.8-1METHODS FOR SAMPLING OF WATER AND STEAM |
116 | TABLE C8.8-2 METHODS OF ANALYSIS FOR THE CONTROL OF WATER FOR BOILERS |
117 | TABLE C8.8-3 USEFUL TESTS FOR THE CONTROL OF WATER FOR BOILERS |
119 | SUBSECTION C9 PREVENTING BOILER FAILURES C9.100 GENERAL C9.200 OVERPRESSURE |
121 | C9.300 WEAKENING OF STRUCTURE |
124 | C9.400 OPERATION OF COMBUSTION EQUIPMENT |
125 | C9.500 FURNACE EXPLOSIONS C9.600 FURNACE IMPLOSIONS |
127 | MANDATORY APPENDICES I SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER AND PRESSURE VESSEL COMMITTEE |
129 | II STANDARD UNITS FOR USE IN EQUATIONS |
130 | NONMANDATORY APPENDICES A PROCEDURES FOR CARE AND MAINTENANCE OF PACKAGE BOILERS |
131 | B WATERTUBE BOILERS — MAINTENANCE CHECKS |
138 | C WATERTUBE BOILERS — OPERATING CHECKS RELATING TO MAINTENANCE |
140 | D FIRETUBE BOILERS — MAINTENANCE CHECKS |
141 | E FIRETUBE BOILERS — OPERATING CHECKS RELATING TO MAINTENANCE |
142 | F GUIDANCE FOR THE USE OF U. S. CUSTOMARY AND SI UNITS IN THE ASME BOILER AND PRESSURE VESSEL CODE |
145 | GLOSSARY |