ASTM-C12:2006 Edition
$40.63
C12-06 Standard Practice for Installing Vitrified Clay Pipe Lines
Published By | Publication Date | Number of Pages |
ASTM | 2006 | 7 |
1.1 This practice covers the proper methods of installing vitrified clay pipe lines in order to fully utilize the structural properties of such pipe.
1.2 The values stated in inch-pound units are to be regarded as the standard. The values given in parentheses are for information only.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Referenced Documents Terminology Supporting Strength External Loads |
2 | Bedding and Encasement FIG. 1 FIG. 2 |
3 | FIG. 3 FIG. 4 FIG. 5 |
4 | FIG. 6 FIG. 7 |
5 | Trench Excavation FIG. 8 FIG. 9 |
6 | Trench Foundation Pipe Bedding Pipe Handling Pipe Laying Backfilling Trenches TABLE 1 |
7 | Field Performance and Acceptance Keywords X1. INSTALLATION CRITERIA FOR PERFORATED VITRIFIED CLAY PIPE X1.1 X1.2 X1.3 |