Shopping Cart

No products in the cart.

ASTM-E1699:2013 Edition

$40.63

E1699-13 Standard Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and Processes

Published By Publication Date Number of Pages
ASTM 2013 8
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

ASTM E1699-13

Historical Standard: Standard Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and Processes

ASTM E1699

Scope

1.1 This practice covers a procedure for defining and satisfying the functions of a project, product, or process (hereafter referred to as focus of study). Projects include construction of commercial and residential buildings and other engineered systems.2 Products include components, systems and equipment.3 Processes include procurement, materials management, work flow, fabrication and assembly, quality control, and services.

1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of functions and then relates these functions to resources.

1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing/leasing, constructing/manufacturing/installing, operating, maintaining, repairing, replacing and disposing of the particular focus of study (see Terminologies E631 and E833). While not the only criteria, cost is an important basis for comparison in a VE/VA study. Therefore, accurate and comprehensive cost data is an important element of the analysis.

1.4 This is a procedure to develop alternatives that meet the functions of the focus of study. Estimate the costs for each alternative. Provide the owner/user/stakeholder with specific, technically accurate alternatives which can be implemented. The owner/user/stakeholder selects the alternative(s) that best satisfies their constraints, needs and desires.

1.5 Apply this practice to an entire focus of study, or to any subsystem/element thereof. The user/owner/stakeholder can utilize the VE/VA procedure to select the element or scope of the study.

Keywords

building economics; function analysis; life-cycle costing; value analysis; value engineering; value methodology

ICS Code

ICS Number Code 91.040.01 (Buildings in general)