E2620-08 Standard Classification for Program and Project Estimate Summaries
Published By | Publication Date | Number of Pages |
ASTM | 2008 | 18 |
1.1 This classification establishes a classification of cost summaries for use when estimating program and project costs.
1.2 This classification can be applied to construction programs and projects that include one or more construction work projects.
1.3 This classification is not based on permanent physical elements of construction (as defined and classified in Classification E 1557 for example); rather, the classification items are cost components common to most program and project estimates.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Referenced Documents Terminology Significance and Use |
2 | Basis of Classification Description of Program, Project, and Construction Layers Program Layer |
3 | FIG. 1 |
4 | FIG. 2 |
5 | Project Layer |
6 | FIG. 3 |
7 | Construction Layer FIG. 4 |
8 | Alternate Project Delivery/Contract Arrangements Keywords X1. COST SUMMARIES X1.1 Program Summary and Cash Flow (Apportioned) X1.2 Construction Project Summary and Cash FlowāWidget Factory #1 X1.3 Construction Project Summary and Cash FlowāWidget Distribution Center X1.4 Client Apportioned Program Cost Summary and Cash Flow |
9 | FIG. X1.1 |
10 | FIG. X1.2 |
11 | FIG. X1.3 |
12 | FIG. X1.4 |
13 | X2. COMMON CONTRACTUAL/PROCUREMENT ARRANGEMENTS X2.1 Design Bid Build X2.2 Design Build X2.3 Construction Manager as Agent/Advisor X2.4 Construction Manager at Risk X2.5 Project Management Procurement |
14 | FIG. X2.1 |
15 | FIG. X2.2 |
16 | FIG. X2.3 |
17 | FIG. X2.4 |
18 | FIG. X2.5 |