AWWA C515 2009
$75.83
AWWA C515-09: Reduced-Wall, Resilient-Seated Gate Valves For Water Supply Service
Published By | Publication Date | Number of Pages |
AWWA | 2009 | 40 |
This standard describes reduced-wall, resilient?seated gate valves with nonrising stems (NRS) and outside screw?and?yoke (OS&Y) rising stems, including tapping gate valves, for water supply service having a temperature range of 33
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ANSI/AWWA C515-09 |
3 | Committee Personnel |
5 | Contents |
7 | Foreword I. Introduction. |
9 | II. Special Issues. III. Use of This Standard. |
10 | IV. Major Revisions. V. Comments. |
11 | AWWA Standard Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service Section 1: GENERAL Sec. 1.1 Scope |
12 | Sec. 1.2 Purpose Sec. 1.3 Application Section 2: REFERENCES |
15 | Section 3: DEFINITIONS |
16 | Section 4: REQUIREMENTS Sec. 4.1 Data to Be Supplied by the Manufacturer Sec. 4.2 Materials |
19 | Sec. 4.3 General Design Table 1 Design torque |
20 | Sec. 4.4 Detailed Design |
21 | Table 2 Minimum thickness of body and bonnet Table 3 Excess flange thickness Table 4 Minimum thickness for ductile-iron connecting end flanges |
23 | Table 5 Stem, gate, thrust collar, and stem nut copper alloys |
24 | Table 6 Stainless-steel valve stem alloys |
25 | Table 7 Minimum diameter of stem and minimum number of turns to open |
27 | Table 8 Diameter of handwheels* |
28 | Sec. 4.5 Fabrication |
29 | Table 9 Gear ratios Section 5: VERIFICATION Sec. 5.1 Testing |
30 | Table 10 Proof of design torque Sec. 5.2 Plant Inspection and Rejection |
31 | Section 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Preparation for Shipment Sec. 6.3 Affidavit of Compliance |
33 | APPENDIX A Installation, Operation, and Maintenance of Reduced-Wall, Resilient-Seated Gate Valves Section A.1: GENERAL Section A.2: UNLOADING Section A.3: RECEIVING INSPECTION |
34 | Section A.4: STORAGE Section A.5: INSTALLATION Sec. A.5.1 Bolts Sec. A.5.2 Underground Installation |
35 | Sec. A.5.3 Aboveground Installations Sec. A.5.4 Inspection Sec. A.5.5 Testing |
36 | Sec. A.5.6 Records Sec. A.5.7 Application Hazards |
37 | Section A.6: MAINTENANCE Sec. A.6.1 Valve Exercising Sec. A.6.2 Inspection |
38 | Sec. A.6.3 Record Keeping Section A.7: REPAIRS |