BS 5607:2017 – TC:2020 Edition
$280.87
Tracked Changes. Code of practice for the safe use of explosives in the construction industry
Published By | Publication Date | Number of Pages |
BSI | 2020 | 206 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
124 | Foreword |
127 | Section 1: Preliminary processes 1 Scope 2 Normative references |
128 | 3 Terms and definitions |
133 | 4 Preliminary procedures 4.1 General 4.2 Legal framework 5 Role of the client |
134 | 5.1 General 5.2 Demolition works |
136 | 6 Risk assessment and site survey 6.1 Risk assessment |
137 | 6.2 Site survey |
138 | 6.3 Hazards from electrical sources 6.4 Exclusion zone and warning procedures 6.5 Sources of ignition and fire 6.6 Advance notices and consultation |
139 | 7 Method statement 7.1 General 7.2 Preparation |
140 | 7.3 Implementation of the method statement |
141 | 7.4 Exclusion zone and warning procedures/systems |
142 | 8 Supervision and responsibility |
144 | 9 Safety and security of explosives during acquisition, transport and storage on site 9.1 General 9.2 Planning |
145 | 9.3 Storage |
148 | 9.4 Transport of explosives on site |
149 | 9.5 Transport of explosives by air 9.6 Disposal of unwanted explosives or explosives which have deteriorated during storage |
150 | 10 Safety when using explosives 10.1 General 10.2 Handling and charging of explosives |
151 | 10.3 Types of explosives |
153 | 10.4 Initiation systems |
156 | 10.5 Misfires |
157 | Figure 1 — Procedure to remedy misfires |
162 | Section 2: Blasting operations 11 Tunnelling and shaft sinking 11.1 General 11.2 Method statement 11.3 Site survey |
163 | 11.4 Containment measures 11.5 Explosives |
164 | Figure 2 — Exclusion zones for shaft sinking and tunnelling |
166 | 11.6 Safety and operations |
172 | 12 Demolition |
173 | 12.1 General 12.2 Quality assurance and auditing of the works 12.3 Pre-weakening 12.4 Site survey/risk assessment |
174 | 12.5 Blast design |
175 | 12.6 Independent audit of the blasting method statement and its implementation 12.7 Method statement |
179 | 12.8 Explosives |
180 | 12.9 Safety and operations |
181 | 12.10 Misfires 12.11 Debris and site clearance 13 Underwater blasting |
182 | 13.1 General 13.2 Method statement 13.3 Site survey |
183 | 13.4 Exclusion zones and blast warning procedures Figure 3 — Relationship of blast area and exclusion zones in underwater blasting Table 1 — Recommended minimum distances from underwater blasting operations |
184 | 13.5 Explosives |
186 | 13.6 Safety and operations |
188 | 13.7 Misfires 13.8 Seismic impulse generation 14 Land excavation 14.1 General |
189 | 14.2 Documentation 14.3 Risk assessment and site survey |
190 | 14.4 Method statements |
191 | 14.5 Drilling 14.6 Exclusion zones and blast protection |
192 | Figure 4 — Exclusion zone for land excavation |
193 | 14.7 Transport and storage 14.8 Explosives and initiation systems Table 2 — Selection and use of explosives |
194 | Table 3 — Selection and use of initiation systems 14.9 Safety and operations |
195 | 15 Other forms of blasting 15.1 Mini-blasting |
196 | 15.2 Deflagrating compounds (low-velocity explosives) 15.3 Cardox 15.4 Expanding grouts |
197 | Annex A (normative) Competence for blasting operations |
198 | Annex B (informative) Qualifications for blasting |
199 | Table B.1 — Blasting operations competency units Annex C (informative) Explosives engineering training |
200 | Annex D (informative) General properties of explosives |
201 | Bibliography |