Shopping Cart

No products in the cart.

BS EN 16454:2015

$215.11

Intelligent transport systems. ESafety. ECall end to end conformance testing

Published By Publication Date Number of Pages
BSI 2015 272
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This European Standard defines the key actors in the eCall chain of service provision as: 1) In-Vehicle System (IVS)/vehicle, 2) Mobile network Operator (MNO), 3) Public safety assistance point [provider](PSAP), in some circumstances may also involve: 4) Third Party Service Provider (TPSP), and to provide conformance tests for actor groups 1) – 4). NOTE Conformance tests are not appropriate nor required for vehicle occupants, although they are the recipient of the service. The Scope covers conformance testing (and approval) of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

PDF Catalog

PDF Pages PDF Title
4 Contents Page
11 European foreword
12 Introduction
13 1 Scope
2 Normative references
14 3 Terms and definitions
19 4 Symbols and abbreviations
21 5 Conformance
5.1 General
5.2 General conditions
22 6 General overview of the eCall transaction for pan-European eCall
26 7 How to use this Standard
7.1 Layout and procedures
27 7.2 System under test
28 7.3 Accelerated test procedures
7.4 Accelerated test procedures for IVSs
7.4.1 Accelerated test procedures for all types of PE eCall IVS
30 7.4.2 Additional accelerated test procedures for PE eCall only IVS
7.5 Accelerated test procedures for MNOs
31 7.6 Accelerated test procedures for PSAPs – PE eCall
32 7.7 Accelerated test procedures for PSAPs – TPS-eCall
7.8 Accelerated test procedures for TPSPs
33 8 Requirements
8.1 Requirements – General objectives
8.1.1 State transitions
43 8.1.2 Classification of testing
45 8.1.3 CTP naming conventions
46 8.1.4 CTP naming convention for IVS conformance tests
8.2 CTP structure
48 9 Conformance test requirements for in-vehicle user equipment and systems (IVS)
9.1 Conformance test requirements for in-vehicle user equipment and systems for Pan European eCall
9.2 Test objectives and purposes
9.3 Classification of testing and referenced tests for in-vehicle user equipment for Pan European eCall IVS
9.3.1 Taxonomy of testing
9.3.2 Referenced tests
9.3.2.1 Pre eCall including conformance to ETSI In-vehicle network access device tests
49 9.3.2.2 In-vehicle eCall system conformance tests
9.4 State transition conformance tests for in-vehicle equipment and system to comply to Standards for pan European eCall
9.4.1 Conformance requirement
9.4.2 Use case test objectives by stage
9.4.2.1 NAD Conformance tests in accordance with ETSI TS 102 936-1 ETSI TS 102 936-2 (NAD)
9.4.2.2 Ignition OFF I-OFF
9.4.2.3 Ignition ON (no eCall) including power-up I-ON
9.4.2.4 Trigger TRG
50 9.4.2.5 eCall initiation ECI
9.4.2.6 eCall in progress ECP
9.4.2.7 eCall Cleardown CLR
9.4.2.8 Post eCall and Call-back CLB
52 9.4.3 CTP 1.1.0.1 Conformance to ETSI TS 102 936-1 and ETSI TS 102 936-2 – PE eCall IVS
53 9.4.4 CTP 1.1.0.2 Test for conformance to valid SIM/USIM – PE eCall
54 9.4.5 CTP 1.1.0.3 Automatic eCall triggering does not occur when ignition OFF – PE eCall IVS
55 9.4.6 CTP 1.1.1.1 Power on and self test – PE eCall IVS
56 9.4.7 CTP 1.1.2.1 eCall automatically activated – PE eCall IVS
57 9.4.8 CTP 1.1.2.2 Automatically triggered eCall in progress was not disconnected upon a new eCall trigger – PE eCall IVS
58 9.4.9 CTP 1.1.2.3 Post-side-crash performance of automatic trigger – IVS
59 9.4.10 CTP 1.1.2.4 Post-frontal-crash performance of automatic trigger – IVS
60 9.4.11 CTP 1.1.2.5 Performance of automatic trigger – different crash types – IVS
61 9.4.12 CTP 1.1.3.1 eCall manually activated – PE eCall IVS
62 9.4.13 CTP 1.1.3.2 Manually triggered eCall in progress was not disconnected upon a new eCall trigger – PE eCall IVS
63 9.4.14 CTP 1.1.4.1 Test eCall activated – PE eCall IVS
64 9.4.15 CTP 1.1.5.1 Network registration – PE eCall IVS
65 9.4.16 CTP 1.1.5.2 Manual termination of eCall by vehicle occupants not allowed (automatically triggered eCall) – PE eCall IVS
66 9.4.17 CTP 1.1.5.3 Manual termination of eCall by vehicle occupants not allowed (manually triggered eCall) – PE eCall IVS
67 9.4.18 CTP 1.1.5.4 Automatically triggered eCall in progress was not disconnected when ignition is switched to OFF – PE eCall IVS
68 9.4.19 CTP 1.1.5.5 Manually triggered eCall in progress was not disconnected when ignition is switched to OFF – PE eCall IVS
69 9.4.20 CTP 1.1.5.6 Priority over conflicting communication – PE eCall IVS
70 9.4.21 CTP 1.1.5.7 Network registration is re-tried when network registration attempt was not successful – PE eCall IVS
9.4.22 CTP 1.1.6.1 Mute IVS and vehicle audio – PE eCall IVS
71 9.4.23 CTP 1.1.7.1 Set-up TS12 call with eCall identifier (flag) set to ‘automatic’ – PE eCall IVS
72 9.4.24 CTP 1.1.8.1 Set-up TS12 call with eCall identifier (flag) set to ‘manual’ – PE eCall IVS
73 9.4.25 CTP 1.1.9.1 Set-up TS11 call to test number – PE eCall IVS
74 9.4.26 CTP 1.1.10.1 eCall is attempted when no networks are available (limited service condition) – PE eCall IVS
75 9.4.27 CTP 1.1.10.2 Re-dial attempt completed within 2 minutes after eCall is dropped – PE eCall IVS
76 9.4.28 CTP 1.1.10.3 Duration of eCall Initiation signal – PE eCall IVS
77 9.4.29 CTP 1.1.11.1 Send MSD with indicator set to ‘Automatically Initiated eCall’ (AleC) – PE eCall IVS
78 9.4.30 CTP 1.1.12.1 Send MSD with indicator set to ‘Manually Initiated eCall’ (MleC) – PE eCall IVS
79 9.4.31 CTP 1.1.13.1 Send MSD with indicator set to ‘Test Call’ – PE eCall IVS
80 9.4.32 CTP 1.1.14.1 Verify MSD transfer – PE eCall IVS
81 9.4.33 CTP 1.1.14.2 Un-mute IVS audio when AL-ACK received – PE eCall IVS
82 9.4.34 CTP 1.1.15.1 Establish voice link to PSAP – PE eCall IVS
83 9.4.35 CTP 1.1.15.2 MSD transfer request while eCall conversation in progress – PE eCall IVS
85 9.4.36 CTP 1.1.15.3 eCall continuation when SEND MSD request not received (T5 expired) – PE eCall IVS
86 9.4.37 CTP 1.1.15.4 Call continuation when AL-ACK not received (T6 expired) – PE eCall IVS
87 9.4.38 CTP 1.1.15.5 MSD is transferred continuously until T7 expires and IVS reconnects loudspeaker and microphone on its expiry – PE eCall IVS
88 9.4.39 CTP 1.1.16.1 Clear down call automatically – PE eCall IVS
90 9.4.40 CTP 1.1.16.2 IVS clears down the eCall upon T2 expiry – PE eCall IVS
91 9.4.41 CTP 1.1.16.3 IVS registers recent eCalls – PE eCall IVS
92 9.4.42 CTP 1.1.17.1 Call-back allowed and able to be answered by IVS – PE eCall IVS
93 9.4.43 CTP 1.1.17.2 Call-back answered by IVS in the event of abnormal termination – PE eCall IVS
94 9.4.44 CTP 1.1.17.3 MSD transfer occurs upon PSAP request during call-back – PE eCall IVS
95 9.4.45 CTP 1.1.17.4 Remain registered for ≥1 hr – PE eCall IVS
96 9.5 State transition test scripts for in-vehicle equipment and system to comply to Standards for pan European eCall – additional tests for eCall only systems
9.5.1 General
97 9.5.2 CTP 1.1.1.2 IVS does not perform registration after power-up – PE eCall only IVS
9.5.3 CTP 1.1.1.3 IVS periodically scans and maintains a list of available PLMNs – PE eCall only
98 9.5.4 CTP1.1.10.4 Verify that PLMN registration procedure is executed upon initiating an eCall – PE eCall only IVS
99 9.5.5 CTP 1.1.17.5 Remain registered for ≥1 hr ≤12 hr – PE eCall only IVS
100 9.6 State transition conformance test requirements for in-vehicle user equipment for eCall TPS-IVS via a third party service provider
9.6.1 General
9.6.2 Test objectives and purposes
9.6.3 Taxonomy of testing and referenced tests
9.6.4 Taxonomy of testing
9.7 Use case conformance tests for in-vehicle equipment and system to comply to Standards for third party service provider eCall
9.7.1 Conformance requirement
101 9.7.2 Use case test objectives by stage
9.7.2.1 Pre eCall PRE
9.7.2.2 Ignition OFF I-OFF
9.7.2.3 Ignition ON (no eCall) including power-up I-ON
9.7.2.4 Trigger TRG
9.7.2.5 eCall initiation ECI
9.7.2.6 eCall in progress ECP
102 9.7.2.7 eCall Cleardown CLR
9.7.2.8 Post eCall and Call-back CLB
103 9.8 State transition test scripts for TPS in-vehicle equipment and system to comply to Standards for third party services supported eCall
9.8.1 General
104 9.8.2 CTP 1.2.0 Pre operation – TPS-IVS
9.8.2.1 CTP 1.2.0.1 TPS-IVS includes necessary hardware – TPS-IVS
105 9.8.2.2 CTP 1.2.0.2 Protection of privacy – TPS-IVS
106 9.8.3 CTP 1.2.1 Power on self test – TPS-IVS
9.8.3.1 CTP 1.2.1.1 Test conformance for indication that TPS-IVS was not functioning properly – TPS-IVS
107 9.8.3.2 CTP 1.2.1.2 Test conformance for TPS-IVS is functioning properly – TPS-IVS
9.8.4 CTP 1.2.2 Automatically activate eCall – TPS-IVS
9.8.4.1 CTP 1.2.2.1 Test conformance for automatically triggered TPS-eCall sequence – TPS-IVS
109 9.8.4.2 CTP 1.2.2.2 Post-side-crash performance of automatic trigger – TPS-IVS
111 9.8.4.3 CTP 1.2.2.3 Post-frontal-crash performance of automatic trigger – TPS-IVS
113 9.8.4.4 CTP 1.2.2.4 Performance of automatic trigger – different crash types – TPS-IVS
114 9.8.4.5 CTP 1.2.2.5 Disarmed automatic TPS-eCall – TPS-IVS
115 9.8.5 CTP 1.2.3 Manually activate eCall – TPS-IVS
9.8.5.1 CTP 1.2.3.1 Manually triggered TPS-eCall sequence – TPS-IVS
117 9.8.5.2 CTP 1.2.3.2 Manual trigger marking and performance – TPS-IVS
119 9.8.6 CTP 1.2.4 Stop conflicting communication – TPS-IVS
9.8.6.1 CTP 1.2.4.1 Priority over conflicting communication – TPS-IVS
120 9.8.7 CTP 1.2.5 Establish voice link to TPSP – TPS-IVS
9.8.7.1 General
9.8.7.2 CTP 1.2.5.1 Voice call reliability – TPS-IVS
121 9.8.7.3 CTP 1.2.5.2 Test conformance that a TS12 voice connection is made in the event of a failure – TPS-IVS
122 9.8.7.4 CTP 1.2.5.3 Test conformance that a TS12 PE eCall is made in the event of a failure – TPS-IVS
123 9.8.7.5 CTP 1.2.5.4 Running eCall sequence cannot be interrupted or terminated by – TPS-IVS
124 9.8.7.6 CTP 1.2.5.5 Test conformance for limited redial attempts – TPS-IVS
125 9.8.8 CTP 1.2.6 Send IVS dataset to TPSP – TPS-IVS
9.8.8.1 General
9.8.8.2 CTP 1.2.6.1 Dataset content – TPS-IVS
127 9.8.8.3 CTP 1.2.6.2 Data re-transmission – TPS-IVS
129 9.8.8.4 CTP 1.2.6.3 Data transmission reliability – TPS-IVS
131 9.8.9 CTP 1.2.7 Establish voice link between PSAP and occupants – TPS-IVS
9.8.9.1 CTP 1.2.7.1 Establish direct bidirectional audio link between occupants and PSAP – TPS-IVS
132 9.8.10 CTP 1.2.8 Cleardown call – TPS-IVS
9.8.10.1 CTP 1.2.8.1 No reconnect after termination – TPS-IVS
133 9.8.11 CTP 1.2.9 Allow call-cack into vehicle – TPS-IVS
9.8.11.1 CTP 1.2.9.1 Call-back in case of disconnection – TPS-IVS
135 9.8.11.2 CTP 1.2.9.2 Call-back after termination – TPS-IVS
136 9.8.11.3 CTP 1.2.9.3 Automatic call-back acceptance – TPS-IVS
138 10 Conformance tests for mobile network operators
10.1 Test objectives and purposes
10.1.1 General
10.1.2 Default assumptions
10.2 Taxonomy of testing and referenced tests
10.3 Use case conformance tests for mobile network operator systems to comply to Standards for pan European eCall
10.3.1 Conformance requirement
10.3.2 Use case test objectives by stage
10.3.2.1 Pre eCall including conformance to ETSI Standards deliverables
139 10.3.2.2 Ignition OFF I-OFF
10.3.2.3 Ignition ON (no eCall) including power-up I-ON
10.3.2.4 Trigger TRG
10.3.2.5 eCall initiation ECI
10.3.2.6 eCall in progress ECP
10.3.2.7 eCall Cleardown CLR
10.3.2.8 Post eCall and Call-back CLB
140 10.4 State transition test scripts for mobile network operators to demonstrate compliance with Pan European eCall Standards
10.4.1 General
141 10.4.2 CTP 2.0.1 Keep SIMs/USIMs alive even though not in regular operation – MNO
142 10.4.3 CTP 2.0.2 MNO supports general eCall relevant requirements
143 10.4.4 CTP 2.0.3 Decommission SIM/USIM – MNO
144 10.4.5 CTP 2.0.4 Support eCall Flag – MNO
10.4.6 CTP 2.1.1 Accept registration – Home network – MNO
145 10.4.7 CTP 2.1.2 Accept registration – Roaming –MNO
146 10.4.8 CTP 2.2.1.1 Receive TS12 voice call (automatically initiated) – MNO
147 10.4.9 CTP 2.2.1.2 Route call to ‘most appropriate’ PSAP – MNO
148 10.4.10 CTP 2.2.1.3 Provide TS12 data/caller ID – MNO
149 10.4.11 CTP 2.2.2.1 Receive TS12 voice call (manual initiated) – MNO
10.4.12 CTP 2.2.3.1 Test for receiving test eCall (TS11)
10.4.13 CTP 2.2.3.2 Route call to non-emergency number – MNO
150 10.4.14 CTP 2.2.3.3 Provide TS11 data – MNO
10.4.15 CTP 2.3.1 Call in progress–MNO
151 10.4.16 CTP 2.4.1 Call cleardown – MNO
152 10.4.17 CTP 2.5.1 Support call-back – MNO
10.4.18 CTP 2.6.1 Maintain registration for 1-12 hours – MNO
10.4.19 CTP 2.7.1 Maintain call records – MNO
153 10.5 Use case conformance tests for mobile network operator systems to comply to Standards for TPS-eCall
10.5.1 Conformance requirement
10.5.2 Use case test objectives by stage
10.6 State transition test scripts for mobile network operators to demonstrate compliance with TPS-eCall Standards
10.6.1 CTP 2.11.1 MNO supports general TPS-eCall relevant requirements
10.6.2 CTP 2.11.2 Support call-back – MNO
154 11 Conformance tests for PSAP systems
11.1 Test objectives and purposes
11.2 Taxonomy of testing and referenced tests
11.2.1 Taxonomy of testing
11.2.2 Referenced tests
11.3 Use case conformance tests for PSAP systems to comply to Standards for pan European eCall
11.3.1 Conformance requirement
11.3.2 Use case test objectives by stage
11.3.2.1 Pre eCall including conformance to ETSI Standards deliverables
11.3.2.2 Ignition OFF (I-OFF)
11.3.2.3 Ignition ON (no eCall) including power-up (I-ON)
11.3.2.4 Trigger (TRG)
155 11.3.2.5 eCall initiation (ECI)
11.3.2.6 eCall in progress (ECP)
11.3.2.7 eCall Cleardown (CLR)
11.3.2.8 Post eCall and Call-back (CLB)
11.4 State transition conformance tests for PSAPs – PE eCall
11.4.1 General
157 11.4.2 CTP 3.1.0.1 Provide MNOs with appropriate routing data – Member State/ PSAP PE eCall
158 11.4.3 CTP 3.1.0.2 Maintain map geo-information – PSAP PE eCall
159 11.4.4 CTP 3.1.1.1 Receive automatically initiated eCall – PSAP PE eCall
160 11.4.5 CTP 3.1.1.2 Receive manually initiated eCall – PSAP PE eCall
161 11.4.6 CTP 3.1.2 Receive TS12 data- Caller ID & location – PSAP PE eCall
162 11.4.7 CTP 3.1.3.1 Recognise eCall and route to in-band modem – PSAP PE eCall
163 11.4.8 CTP 3.1.3.2 PSAP equipment failure – PSAP PE eCall
164 11.4.9 CTP 3.1.3.3 PSAP modem failure before link layer ACK is sent – PSAP PE eCall
165 11.4.10 CTP 3.1.4 eCall received at in-band modem – PSAP PE eCall
166 11.4.11 CTP 3.1.5.1 Validate initiation signal – PSAP PE eCall
167 11.4.12 CTP 3.1.5.2 Route to operator after T4 expiration – PSAP PE eCall
168 11.4.13 CTP 3.1.6 Request MSD – PSAP PE eCall
169 11.4.14 CTP 3.1.7.1 Receive MSD – PSAP PE eCall
170 11.4.15 CTP 3.1.7.2 Verify status bit in AL-ACK upon positive ACK– PSAP PE eCall
171 11.4.16 CTP 3.1.7.3 Verify MSD transfer upon T8 expiration – PSAP PE eCall
172 11.4.17 CTP 3.1.7.4 Verify transfer of corrupted MSD – PSAP PE eCall
173 11.4.18 CTP 3.1.7.5 Verify PSAP behaviour when MSD format check fails– PSAP PE eCall
11.4.19 CTP 3.1.8 ACK – PSAP PE eCall
174 11.4.20 CTP 3.1.9 Route voice and MSD to operator – PSAP PE eCall
175 11.4.21 CTP 3.1.10 Display TS12 data and MSD to operator – PSAP PE eCall
176 11.4.22 CTP 3.1.11 Decode VIN – PSAP PE eCall
177 11.4.23 CTP 3.1.12 Talk to vehicle occupants – PSAP PE eCall
178 11.4.24 CTP 3.1.13 Request new MSD before call cleardown – PSAP PE eCall
179 11.4.25 CTP 3.1.14.1 Call cleardown – PSAP PE eCall
180 11.4.26 CTP 3.1.14.2 Verify status bit in AL-ACK upon cleardown – PSAP –PE eCall
181 11.4.27 CTP 3.1.15 Call-back to vehicle – PSAP PE eCall
182 11.4.28 CTP 3.1.16 Request new MSD after call cleardown – PSAP PE eCall
183 11.5 State transition conformance tests for PSAPs – TPS-eCall
11.5.1 General
184 11.5.2 CTP 3.2.0.1 TPSP – PSAP agreement – PSAP TPS eCall
185 11.5.3 CTP 3.2.0.2 Provide areas of responsibility and contact numbers to approved TPSPs –PSAP TPS-eCall
11.5.3.1 CTP 3.2.0.2.1 Provide PSAP areas of responsibility to approved TPSPs
186 11.5.3.2 CTP 3.2.0.2.2 Provide PSAP contact numbers to approved TPSPs –PSAP TPS-eCall
187 11.5.4 CTP 3.2.0.3 Agreement on necessary language support – PSAP TPS eCall
188 11.5.5 CTP 3.2.0.4 Agree electronic data connection and provide details to approved TPSPs – PSAP TPS eCall
11.5.5.1 CTP 3.2.0.4.1 Agree method to pass emergency details to the relevant PSAP – PSAP TPS eCall
189 11.5.5.2 CTP 3.2.0.4.2 PSAP provides an indicator whether they accept or not electronic data – PSAP TPS eCall
190 11.5.6 CTP 3.2.0.5 Provide PSAP data addresses and security access to approved TPSPs – PSAP TPS eCall
191 11.5.7 CTP 3.2.1 Receive eCall notification from TPSP (not TS12) –PSAP TPS eCall
192 11.5.8 CTP 3.2.2 Route call to operator – PSAP TPS eCall
193 11.5.9 CTP 3.2.3 Connection, TSD transmission, display relevant information to PSAP operator –PSAP TPS-eCall
195 11.5.10 CTP 3.2.4 PSAP Operator: Talk with TPSP operator and receive relevant information – PSAP TPS eCall
196 11.5.11 CTP 3.2.5 Talk to vehicle occupants – PSAP TPS-eCall
197 11.5.12 CTP 3.2.6 Request new TSD before call cleardown –PSAP TPS-eCall
198 11.5.13 CTP 3.2.7 Inform TPSP that call can be ended – PSAP TPS eCall
199 11.5.14 CTP 3.2.8 Call cleardown with TPSP –PSAP TPS-eCall
200 11.5.15 CTP 3.2.9 Call-back to TPSP – PSAP TPS-eCall
201 11.5.16 CTP 3.2.10 Call-back to vehicle – PSAP TPS eCall
202 11.5.17 CTP 3.2.11 Call cleardown with vehicle – PSAP TPS eCall
203 12 State transition conformance tests for TPS-eCall
12.1 Related specifications and conformance requirements
12.2 TPSP general tests (applicable to both TPS-eCall responder and TPS-eCall notifier)
12.2.1 General
205 12.2.2 CTP 4.0.1 Agree service level agreement and/or Standard ways of working with PSAPs – TPSP
206 12.2.3 CTP 4.0.2 Receive PSAP areas of responsibility and contact numbers – TPSP
207 12.2.4 CTP 4.0.3 Agree necessary language support – TPSP
12.2.4.1 CTP 4.0.3.1 Agree necessary language support for PSAP – TPSP
208 12.2.4.2 CTP 4.0.3.2 Communicate language support to customers – TPSP
209 12.2.5 CTP 4.0.4 Agree electronic data connection details with PSAPs – TPSP
210 12.2.6 CTP 4.0.5 Evidence quality procedures – TPSP
12.2.6.1 CTP 4.0.5.1 Quality policy – TPSP
211 12.2.6.2 CTP 4.0.5.2 Infrastructure availability – TPSP
212 12.2.6.3 CTP 4.0.5.3 Verify appropriate training – TPSP
12.2.7 CTP 4.0.6 Verify automatic call distribution (ACD) system – TPSP
213 12.2.8 CTP 4.0.7 Check link from MNO – TPSP
12.2.9 CTP 4.0.8 Deal with transmission failures – TPSP
214 12.2.10 CTP 4.0.9 Update GIS – TPSP
215 12.2.11 CTP 4.0.10 Protection of privacy – TPSP
216 12.3 TPS-eCall responder tests – TPS-R
12.3.1 General
217 12.3.2 CTP 4.1.1 Receive TPS-eCall from vehicle – TPS-R
12.3.2.1 CTP 4.1.1.1 Respond to a TPS-eCall transaction – TPS-R
219 12.3.2.2 CTP 4.1.1.2 Answer call in a timely manner – TPS-R
220 12.3.3 CTP 4.1.2 Process incoming call – TPS-R
12.3.3.1 CTP 4.1.2.1 Receive and route call – TPS-R
221 12.3.3.2 CTP 4.1.2.2 Receive and check IVS dataset from vehicle – TPS-R
222 12.3.4 CTP 4.1.3 Talk with vehicle occupants and receive relevant information – TPS-R
12.3.4.1 CTP 4.1.3.1 Determine emergency – TPS-R
223 12.3.4.2 CTP 4.1.3.2 Call to vehicle if receiving data-only – TPS-R
224 12.3.4.3 CTP 4.1.3.3 Call-back to vehicle if call drops – TPS-R
225 12.3.5 CTP 4.1.4 Trigger PSAP notification – TPS-R
12.3.6 CTP 4.1.5 Make voice connection between vehicle and PSAP if required – TPS-R
226 12.3.7 CTP 4.1.6 Confirmation received from PSAP that call with vehicle can be ended – TPS-R
227 12.3.8 CTP 4.1.7 Call cleardown with vehicle – TPS-R
228 12.3.9 CTP 4.1.8 Call-back to vehicle – TPS-R
229 12.4 TPS-eCall notifier tests – TPS-N
12.4.1 General
230 12.4.2 CTP 4.2.1 Emergency situation likely to require assistance – TPS-N
12.4.3 CTP 4.2.2 Establish contact with PSAP – TPS-N
12.4.3.1 CTP 4.2.2.1 Establish voice call to most relevant PSAP – TPS-N
231 12.4.3.2 CTP 4.2.2.2 Send data electronically to PSAP – TPS-N
12.4.3.2.1 CTP 4.2.2.2.1 Send data electronically (includes MSD) to PSAP – TPS-N
233 12.4.3.2.2 CTP 4.2.2.2.2 Support Standardized PSAP data interface – TPS-N
235 12.4.4 CTP 4.2.3 Talk with PSAP operator and notify relevant information – TPS-N
237 12.4.5 CTP 4.2.4 Establish voice link between PSAP and vehicle occupants if required by PSAP – TPS-N
12.4.5.1 CTP 4.2.4.1 Make conference call voice connection between TPSP, vehicle and PSAP if required – TPS-N
238 12.4.5.2 CTP 4.2.4.2 Make voice connection between vehicle and PSAP if required – TPS-N
239 12.4.6 CTP 4.2.5 Respond to electronic data update request – TPS-N
12.4.7 CTP 4.2.6 PSAP informs that call can be ended – TPS-N
12.4.8 CTP 4.2.7 Call cleardown to PSAP – TPS-N
240 12.4.9 CTP 4.2.9 Call-back from PSAP – TPS-N
13 Marking, labelling and packaging
14 Declaration of patents and intellectual property
241 Annex A (normative) Proforma conformance test report for Pan European eCall in-vehicle system (IVS)
A.1 Conformance test report
A.1.1 System under test: ………………………….
A.1.2 System under test identification
242 A.1.3 Testing environment
A.1.4 Limits and reservation
A.1.5 Comments
243 A.2 SUT conformance status
A.3 Static conformance summary
A.4 Dynamic conformance summary
244 A.5 Static conformance review report
245 A.6 Test campaign report
246 A.7 Observations
247 Annex B (normative) ProForma conformance test report for Third Party Service Provider In-Vehicle System (TPS-IVS)
B.1 Conformance test report
B.1.1 System under test: ………………………….
B.1.2 System under test identification
248 B.1.3 Testing environment
B.1.4 Limits and reservation
B.1.5 Comments
249 B.2 SUT conformance status
B.3 Static conformance summary
B.4 Dynamic conformance summary
250 B.5 Static conformance review report
251 B.6 Test campaign report
B.7 Observations
252 Annex C (normative) ProForma conformance test report for mobile network operator (MNO)
C.1 Conformance test report
C.1.1 System under test: ………………………….
C.1.2 System under test identification
253 C.1.3 Testing environment
C.1.4 Limits and reservation
C.1.5 Comments
254 C.2 SUT conformance status
C.3 Static conformance summary
C.4 Dynamic conformance summary
255 C.5 Static conformance review report
256 C.6 Test campaign report
C.7 Observations
257 Annex D (normative) ProForma conformance test report for public service answering point (PSAP)
D.1 Conformance test report
D.1.1 System under test: ………………………….
D.1.2 System under test identification
258 D.1.3 Testing environment
D.1.4 Limits and reservation
D.1.5 Comments
259 D.2 SUT conformance status
D.3 Static conformance summary
D.4 Dynamic conformance summary
260 D.5 Static conformance review report
261 D.6 Test campaign report
262 D.7 Observations
263 Annex E (normative) ProForma conformance test report for third party service provider (TPS-eCall)
E.1 Conformance test report
E.1.1 System under test: ………………………….
E.1.2 System under test identification
264 E.1.3 Testing environment
E.1.4 Limits and reservation
E.1.5 Comments
265 E.2 SUT conformance status
E.3 Static conformance summary
E.4 Dynamic conformance summary
266 E.5 Static conformance review report
267 E.6 Test campaign report
E.7 Observations
269 Bibliography
BS EN 16454:2015
$215.11