Shopping Cart

No products in the cart.

BS EN 60255-22-5:2011

$142.49

Measuring relays and protection equipment – Electrical disturbance tests. Surge immunity test

Published By Publication Date Number of Pages
BSI 2011 24
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 60255 is based on IEC 61000-4-5, referring to that publication where applicable, and specifies the general requirements for surge immunity tests for measuring relays and protection equipment for power system protection, including the control, monitoring and process interface equipment used with those systems.

The objective of the tests is to confirm that the equipment under test will operate correctly when energized and subjected to high-energy disturbances on the power and interconnection lines, caused by surge voltages from switching and lightning effects.

This standard does not intend to test the capability of the insulation to withstand high-voltage stress. The insulation test is covered by IEC 60255-27.

The requirements specified in this standard are applicable to measuring relays and protection equipment in a new condition and all tests specified are type tests only.

The object of this standard is to define:

  • terms used;

  • test severity levels;

  • test equipment;

  • test set-up;

  • test procedures;

  • criteria for acceptance;

  • test report requirements.

PDF Catalog

PDF Pages PDF Title
6 English
CONTENTS
7 1 Scope and object
2 Normative references
8 3 Terms and definitions
9 4 Test severity level
Figures
Figure 1 – Ports tested in this standard for measuring relays and protection equipment
Table 1 – Test voltages and source impedances for the EUT ports
10 5 Test equipment
6 Test set-up
6.1 General
6.2 Tests applied to auxiliary power supply port
6.3 Tests applied to current/voltage transformer inputs
6.4 Tests applied to status inputs/output contacts
11 6.5 Tests applied to communications port and other ports using shielded lines
7 Test procedure
8 Criteria for acceptance
12 9 Test report
Table 2 – Criteria for acceptance
13 Figure 2 – Line to earth tests applied to the auxiliary power supply port
14 Figure 3 – Line to line tests applied to the auxiliary power supply port
15 Figure 4 – Line to earth tests applied to current/voltage transformer inputs
16 Figure 5 – Line to line tests applied to current/voltage transformer inputs
17 Figure 6 – Line to earth tests applied to status input/output contacts
18 Figure 7 – Line to line tests applied to status input/output contacts
19 Figure 8 – Line to earth tests applied to communications port and other ports using shielded cables with the shields grounded at both ends
20 Figure 9 – Line to earth tests applied to communications port and other ports using shielded cables with the shield connected at one end only
21 Figure 10 – Line to earth tests applied to single and bundled cables in a multi-shield configuration
22 Bibliography
BS EN 60255-22-5:2011
$142.49