BS EN ISO 29481-1:2017
$167.15
Building information models. Information delivery manual – Methodology and format
Published By | Publication Date | Number of Pages |
BSI | 2017 | 38 |
This part of ISO 29481 specifies
-
a methodology that links the business processes undertaken during the construction of built facilities with the specification of information that is required by these processes, and
-
a way to map and describe the information processes across the life cycle of construction works.
This part of ISO 29481 is intended to facilitate interoperability between software applications used during all stages of the life cycle of construction works, including briefing, design, documentation, construction, operation and maintenance, and demolition. It promotes digital collaboration between actors in the construction process and provides a basis for accurate, reliable, repeatable and high-quality information exchange.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
4 | European foreword Endorsement notice |
6 | Foreword |
7 | Introduction |
8 | 1 Scope 2 Normative references 3 Terms and definitions |
10 | 4 Information delivery manual 4.1 General 4.2 Users of this part of ISO 29481 |
11 | 4.3 Business context |
12 | 4.4 Complete schema 4.5 Breaking a complete schema to support requirements 4.6 Supporting the building information modelling process 4.7 Supporting the business process |
13 | 4.8 Supporting the software solution 4.9 Content in the specific IDM 5 IDM Framework 5.1 General |
15 | 5.2 Basic framework 5.2.1 General 5.2.2 IDM component header information |
16 | 5.2.3 IDM component overview 5.3 Interaction map/transaction map 5.4 Process maps |
17 | 5.5 Exchange requirements 5.5.1 General 5.5.2 Information units 5.5.3 Information constraints |
18 | 5.6 Technical implementation 5.6.1 General 5.6.2 Implementation of metadata 5.6.3 Interaction framework 5.6.4 Model view definition (MVD) |
20 | Annex A (informative) IDM development process |
24 | Annex B (informative) Examples of simplified IDM components |
29 | Annex C (informative) Reference life cycle stages |
31 | Annex D (informative) IDM use of BPMN methods |
36 | Bibliography |