BS ISO 19202-1:2017
$198.66
Summer toboggan runs – Safety requirements and test methods
Published By | Publication Date | Number of Pages |
BSI | 2017 | 56 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
9 | 1 Scope 2 Normative references |
10 | 3 Terms and definitions |
11 | 4 List of significant hazards |
13 | 5 Safety requirements 5.1 Manufacturing 5.1.1 Materials 5.1.2 Safety measures against loosening of connections 5.1.3 Welded joints 5.1.4 Corrosion and surface protection, protection against rot |
14 | 5.2 Toboggan 5.2.1 General 5.2.2 Toboggan for rail-guided summer toboggan runs 5.2.3 Toboggan for tub-guided summer toboggan runs |
15 | 5.2.4 Braking 5.3 Track 5.3.1 Structural design of the system on the site 5.3.2 Rail-guided summer toboggan runs 5.3.3 Tub-guided summer toboggan runs |
16 | 5.3.4 Visibility down the track and braking distances 5.4 Entrance and exit area 5.4.1 General |
17 | 5.4.2 Entrance areas 5.4.3 End of downhill track 5.4.4 Exit areas 5.5 Uphill transport system 5.5.1 General 5.5.2 Technical design |
18 | 5.5.3 Means of conveyance and connection to the means of conveyance 5.5.4 Tensioning devices 5.5.5 Drives and their components |
19 | 5.6 Special safety equipment and precautions 5.7 Clearance zone 5.7.1 Downhill travel |
21 | 5.7.2 Uphill transport 5.7.3 Squeezing and shearing points |
22 | 5.8 Electrical equipment 5.8.1 Electrical systems 5.8.2 Control systems |
23 | 6 Calculations 6.1 General 6.2 Actions 6.2.1 General 6.2.2 Permanent actions |
24 | 6.2.3 Variable actions |
25 | 6.2.4 Accidental actions 6.2.5 Impact |
26 | 6.2.6 Vibrations occurring in directly passable components 6.3 Strength verification by calculation 6.3.1 General 6.3.2 Toboggan calculation |
27 | 6.3.3 Tub calculation 6.3.4 Rail calculation 6.3.5 Calculation of supporting structure 6.3.6 Brake calculation |
28 | 6.4 Verification of fatigue 6.4.1 General 6.4.2 Fatigue loads 6.5 Verification of stability 6.5.1 Safety against overturning, sliding and lifting off |
30 | 6.5.2 Ground anchorages |
34 | 7 Testing and inspection 7.1 General |
35 | 7.2 Examination of the technical documentation 7.3 Acceptance test prior to commissioning (initial acceptance test) 7.3.1 General |
36 | 7.3.2 Functional check |
37 | 7.4 Periodic inspection 7.5 Inspection after modification 7.5.1 Examination of calculations 7.5.2 On-site inspection |
38 | 7.6 Test report 8 Marking 8.1 Summer toboggan run |
39 | 8.2 Toboggan 9 Commissioning 10 Technical documentation 10.1 General 10.2 Construction specification 10.3 Structural drawings and manufacturing drawings |
40 | 10.4 Structural calculations 10.5 Risk assessment 10.6 Operating manual |
41 | Annex A (informative) Example of load combinations in accordance with EN 1993 |
43 | Annex B (normative) Track calculation |
52 | Bibliography |