Shopping Cart

No products in the cart.

BSI 23/30441171 DC:2023 Edition

$13.70

BS ISO 6963. Bunker cargo loading from oil terminal to bunker tanker using Coriolis mass flow meter

Published By Publication Date Number of Pages
BSI 2023 37
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
7 Foreword
8 Introduction
9 1 Scope
2 Normative references
10 3 Terms and definitions
15 4 Bunker cargo quality
4.1 Bunker cargo specifications
4.2 Sampling
4.2.1 Location of sampling equipment
4.2.2 Sampling procedure
4.3 Documentation
16 5 Metrological requirements
5.1 General
5.2 Mass flow meter requirements
17 5.3 MFM measuring system requirements
5.4 Post approval maintenance
5.4.1 Meter zero verification frequency
18 5.4.2 Zero verification procedure
5.4.3 Meter and ancillary devices verification and/or calibration frequency
5.4.4 Software upgrade/software update
6 System integrity requirements
6.1 General
6.2 Metrological control
6.2.1 Documentation
6.2.2 Type approval and pattern evaluation
19 6.3 Security features
6.3.1 Equipment security
6.3.2 Software security
6.3.3 Data security
6.3.4 Critical alarm
6.4 Installation and commissioning
6.4.1 Pre-installation and MFM bunker system sealing plan
20 6.4.2 Installation and re-installation
6.4.3 Commissioning
6.4.4 Re-commissioning
6.5 Operational security
6.6 Maintenance and control of MFM bunker system
7 Meter selection and installation requirements
7.1 General
21 7.2 Site survey at terminals
7.3 Meter selection
7.4 Meter installation
22 7.5 Meter commissioning
8 Site acceptance test (SAT) requirements
9 Metering procedures
9.1 General
9.2 Documentation
9.2.1 General
23 9.2.2 Pre-loading documentation
9.2.3 Post-loading documentation
9.3 Additional documentation at the terminal
9.3.1 Meter totalizer log
24 9.3.2 Other documents at the terminal
9.4 Pre-loading procedures
9.4.1 Pre-loading conference
9.4.2 System integrity seals document
9.4.3 Meter reading record register
25 9.5 Loading procedures
9.5.1 General
9.5.2 Start of loading
26 9.5.3 End of loading
9.6 Post-loading procedures
9.6.1 Meter reading record register
9.6.2 Bunker cargo metering ticket
27 9.6.3 Determination of delivered quantity
9.7 Others
9.7.1 MFM measuring system failure
9.7.2 Disputes
29 Annex€A (informative) Example of a bunker cargo sample label
30 Annex€B (informative) Example of a certificate of quality
31 Annex€C (informative) Uncertainty budget table
32 Annex€D (normative) Zero verification procedure
33 Annex€E (normative) Metrological and system integrity requirements
34 Annex€F (informative) Typical schematic diagram for MFM bunker system (for bunker cargo loading)
35 Annex€G (informative) Example of letter of protest for bunker cargo loading
36 Annex€H (informative) Bunker cargo claims procedure for quantity dispute
37 Bibliography
BSI 23/30441171 DC
$13.70