BSI PAS 2030:2023
$165.78
Installation of energy efficiency measures in existing dwellings. Specification
Published By | Publication Date | Number of Pages |
BSI | 2023 | 128 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | Contents |
5 | Foreword |
7 | Introduction |
9 | 1 Scope |
10 | 2 Normative references Standards publications |
12 | Other publications |
13 | 3 Terms and definitions 3.1 client 3.2 commissioning 3.3 dwelling 3.4 EAS compliance 3.5 EEM product 3.6 EEM proprietary system 3.7 energy efficiency measure (EEM) 3.8 installation 3.9 installation location 3.10 installation method 3.11 installation method statement 3.12 Main Contractor |
14 | 3.13 operative 3.14 operative (experienced) 3.15 operative (new entrant) 3.16 personal certificate of competence 3.17 pre-installation building inspection 3.18 Recognition of Prior Experience and Learning (RPEL) 3.19 Register of Regulated Qualifications (RRQ) 3.20 retrofit assessment 3.21 Retrofit Assessor |
15 | 3.22 Retrofit Coordinator 3.23 retrofit design 3.24 Retrofit Designer 3.25 Retrofit Installer 3.26 supervision 3.27 vocational competence 3.28 vocational competence (acquiring) 3.29 vocational competence ratio 3.30 vocational qualification 3.31 vocational qualification currency |
16 | 4 Retrofit project management |
17 | 5 The retrofit design 5.1 Retrofit Installer responsibility to be in possession of a retrofit design 5.2 Validation of the retrofit design |
19 | 6 Installation process 6.1 Installation method statement 6.2 Installation equipment and tools |
20 | 6.3 Checking, handling and storage of materials and supplies 6.4 Provision of installation instructions to operatives 6.5 People |
21 | 6.6 Subcontract Installers 6.7 Testing 6.8 Commissioning |
22 | 6.9 Handover 6.10 Installation control 6.11 Installation documents and record keeping |
23 | 7 Installation process management 7.1 Operation and process oversight 7.2 Pre-installation building inspection |
24 | 7.4 Installation change 7.5 Process continuity plan |
25 | 7.6 Process control 7.7 Internal audit and corrective action 7.8 Installation process records 7.9 Business and financial probity |
26 | 8 Service provision 8.1 Complaints procedure 8.2 Complaints records 8.3 Interaction with clients |
27 | 9 Claims of compliance 9.1 Applicability of claims 9.2 Requirement to claim 9.3 Basis of claim |
28 | 10 Documents essential to the application of the Annexes of this PAS 10.1 Use of the identified documents 10.2 Publicly Available Specification and British Standards |
29 | 10.3 Institution of Gas Engineer and Managers – Standards |
30 | 10.4 Energy Networks Association Engineering Recommendations 10.5 UKLPG 10.6 Ministry of Housing, Communities and Local Government 10.7 Other insulation installation guidance references |
31 | Annex A (informative) Measure-specific annex selection and co-installation requirements A.1 Introduction A.2 Efficiency measures and types arranged by measure category |
33 | A.3 Explanation of PAS 2030 measure-specific annex referencing system A.4 Interactions between EEMs |
35 | A.5 Avoidance of thermal bridging and infiltration |
36 | Annex B (normative) BFM energy efficiency measures B.1 Measure BFM.1 – Cavity wall insulation including that installed in party walls |
39 | B.2 Measure BFM.2 – Draught proofing |
41 | B.3 Measure BFM.3 – Energy efficient glazing and doors including replacement Insulating Glass Units (IGU) |
43 | B.4 Measure BFM.4 – External wall insulation |
49 | B.5 Measure BFM.5 – Flat roof insulation |
52 | B.6 Measure BFM.6 – Floor insulation |
55 | B.7 Measure BFM 7 – Hybrid wall insulation |
60 | B.8 Measure BFM.8 – Internal wall insulation |
65 | B.9 Measure BFM.9 – Loft insulation |
68 | B.10 Measure BFM.10 – Pitched roof insulation |
71 | B.11 BFM.11 – Solar blinds, shutters and shading devices (internal and external) |
74 | B.12 BFM.12 – Room-in-roof insulation |
76 | B.13 BFM.13: Insulation of existing park homes |
78 | Annex C (normative) BSM energy efficiency measures C.1 Measure BSM.1 – Condensing boilers, natural gas‑fired and liquefied petroleum gas-fired |
81 | C.2 Measure BSM.2 – Oil-fired condensing boilers |
84 | C.3 Measure BSM.3 – Flue-gas heat recovery devices |
86 | C.4 Measure BSM.4: Heating system insulation (ducting, pipes and cylinders) |
88 | C.5 Measure BSM.5 – Heating, hot water system, air conditioning or ventilation controls and components |
91 | C.6 Measure BSM.6 – Hot water systems |
94 | C.7 Measure BSM.8 – Mechanical ventilation with heat recovery |
97 | C.8 Measure BSM.8 – Under-floor heating |
100 | C.9 Measure BSM.9 – Warm-air heating systems |
103 | C.10 Measure BSM.10 Water efficient taps and showers |
105 | Annex D (normative) BSE energy efficiency measures D.1 Measure BSE.1 – Electric storage heaters (including electric warm-air heating units that incorporate heat storage) |
108 | D.2 Measure BSE.2 Lighting fittings, lighting systems and lighting system controls |
110 | Annex E (informative) PAS 2030:2017 to PAS 2030:2019 – Substantive changes |
113 | Annex F (informative) Retrofit Installer guidance on the use and application of PAS 2030 F.1 Overview F.2 A staged approach to installation |
115 | Annex G (informative) Example installation project information collation form G.1 Use of this form PAS 2030 Installation Process Record G.2 Location of installation G.3 Measure(s) to be installed |
116 | G.4 Source of PAS 2035 compliant design (5.1) G.5 Validation of design (5.2) |
117 | G.6 Products and/or system specified/to be installed G.7 Installation method statement |
118 | G.8 Installation process |
121 | G.9 Operation and process oversight G.10 Pre-installation building inspection |
123 | G.11 Provision for any intermediate inspection required (7.3) G.12 Installation change (7.4) G.13 Process continuity (7.5) G.14 Process control records (7.6 & 7.8) |
124 | G.15 Details of any problems encountered during installation, corrections agreed and remedial work undertaken G.16 Client complaints (8) |
125 | G.17 Commissioning – EEM performance testing carried out G.18 Record of information left with client at handover G.19 Installation sign-off |
126 | Bibliography Standards publications Other publications |