Shopping Cart

No products in the cart.

BSI PD CLC/TS 61400-26-2:2017

$198.66

Wind turbines – Production-based availability for wind turbines

Published By Publication Date Number of Pages
BSI 2017 52
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 61400 provides a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators.

The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation.

It is not the intention of this Technical Specification to define how production-based availability shall be calculated. Nor is it the intention to form the basis for power curve performance measurements, which is the objective of IEC 61400-12.

This document also includes informative annexes with:

  • examples of determination of lost production,

  • examples of algorithms for production-based indicators,

  • examples of other performance indicators,

  • examples of application scenarios.

PDF Catalog

PDF Pages PDF Title
2 National foreword
5 Annex ZA(normative)Normative references to international publicationswith their corresponding European publications
6 CONTENTS
9 FOREWORD
11 INTRODUCTION
12 1 Scope
2 Normative references
3 Terms, definitions and abbreviations
3.1 Terms and definitions
13 3.2 Abbreviations
3.2.1 Information available
15 3.2.2 Information unavailable
16 4 Information model
4.1 General
Figures
Figure 1 – Information category overview
17 Figure 2 – Extended information category model
18 4.2 Allocation of production terms to the information categories
Figure 3 – Information categories, addition of layer 2 and layer 3, mandatory categories
19 4.3 Mean-value based information
4.4 Limitations
4.5 Entry and exit points
20 4.6 Information category priority
21 Annex A (informative) Possible methods for the determination of potential energy production
A.1 General
A.2 Specific power curve and velocities methods
A.2.1 General
A.2.2 Nacelle anemometer wind measurement with power curve
22 A.2.3 Upstream wind measurement with power curve
A.2.4 Met mast wind measurement with correction factors and power curve
23 A.3 Power-based methods
A.3.1 General
A.3.2 Average production of wind farm
24 A.3.3 Average production of representative comparison turbines
25 A.3.4 Data acquisition with comparison chart/database
A.3.5 Average wind speed of wind farm
26 Figure A.1 – Step 1: Calculation of wind speed based on working wind turbine 1 to n
Figure A.2 – Step 2: Estimation of lost production for WTGS not in FULL PERFORMANCE
27 Annex B (informative) Production-based availability indicators – examples
B.1 General
B.2 System operational production-based availability (“WTGS user’s view”)
B.2.1 General
B.2.2 System operational production-based availability algorithm based on mandatory information categories only
28 B.2.3 Turbine operational production-based availability algorithm – including optional information categories
29 B.3 Technical production-based availability (“WTGS manufacturer’s view”)
B.3.1 General
B.3.2 Technical production-based availability based on mandatory information categories only
31 Annex C (informative) Capacity factor and other performance indicators
C.1 General
C.2 Capacity factor
32 C.3 Production ratio
33 Annex D (informative) Verification scenarios – examples
D.1 General
D.2 Application scenarios
D.2.1 General
D.2.2 Scenarios under FULL PERFORMANCE
Tables
Table D.1 – FULL PERFORMANCE: By definition, actual energy production is equal to the potential energy production
34 Table D.2 – FULL PERFORMANCE: Actual energy production is less than potential energy production
35 D.2.3 Scenarios under PARTIAL PERFORMANCE
Table D.3 – FULL PERFORMANCE: Actual energy production greater than potential energy production
Table D.4 – Partial performance – Derated: Grid constraint
36 Table D.5 – Partial performance – Derated: Grid constraint, actual energy production less than potential energy production
Table D.6 – Partial performance – Derated: Output constraint due to excessive noise from the WTGS
37 Table D.7 – Partial performance – Derated: Dirt on blades constrained performance
Table D.8 – Partial performance – Derated: Ice accumulated on blades has been detected and the WTGS is allowed to operate although the power performance is derated
38 D.2.4 Scenarios under TECHNICAL STANDBY
D.2.5 Scenarios under OUT OF ENVIRONMENTAL SPECIFICATION
Table D.9 – Partial performance – Degraded: WTGS deterioration known to the WTGS user
Table D.10 – TECHNICAL STANDBY: WTGS is cable unwinding
Table D.11 – Out of environmental specification: Calm winds
39 D.2.6 Scenarios under REQUESTED SHUTDOWN
Table D.12 – Out of environmental specification: High winds
Table D.13 – Out of environmental specification: Temperature too high
Table D.14 – REQUESTED SHUTDOWN: Ice on blades is detected and WTGS user requests shutdown of the WTGS
40 Table D.15 – Requested shutdown: Sector management
Table D.16 – Requested shutdown: Noise nuisance
41 D.2.7 Scenarios under OUT OF ELECTRICAL SPECIFICATION
D.2.8 Scenarios under SCHEDULED MAINTENANCE
Table D.17 – Out of electrical specification: Low voltage
Table D.18 – SCHEDULED MAINTENANCE: WTGS is under scheduled maintenance work by the WTGS manufacturer within the time allowance agreed by the maintenance contract
42 D.2.9 Scenarios under PLANNED CORRECTIVE ACTION
D.2.10 Scenarios under FORCED OUTAGE
Table D.19 – PLANNED CORRECTIVE ACTION: WTGS manufacturer performs corrective action to the WTGS at his discretion outside the time allowance of scheduled maintenance
Table D.20 – Forced outage: Short circuit
43 Table D.21 – Forced outage: Corrosion
Table D.22 – Forced outage: Overheating
44 D.2.11 Scenarios under SUSPENDED
D.2.12 Scenarios under FORCE MAJEURE
Table D.23 – SUSPENDED: Suspended repair work due to storm with lightning
Table D.24 – FORCE MAJEURE: no access to the WTGS due to flooding impacting infrastructure
45 D.3 Calculation of production-based availability indicators according to Annex B
D.3.1 General
D.3.2 System operational production-based availability algorithm based on mandatory information categories only (“WTGS user’s view”)
Table D.25 – System operational production-based availability algorithm based on mandatory information categories only (“WTGS user’s view”)
46 D.3.3 Turbine operational production-based availability algorithm – including optional categories (“WTGS user’s view”)
47 Table D.26 – Turbine operational production-based availability algorithm – including optional categories (“WTGS user’s view”)
48 D.3.4 Technical production-based availability based on mandatory information categories only (“WTGS manufacturer’s view”)
Table D.27 – Technical production-based availability based on mandatory information categories only (“WTGS manufacturer’s view”)
50 Annex E (informative) Considerations of competing assignment of lost production
Figure E.1 – Example of simultaneous degrading and derating
51 Bibliography
BSI PD CLC/TS 61400-26-2:2017
$198.66