ICC SignificantChangestotheIRC 2012
$21.64
Significant Changes to the International Residential Code, 2012 Edition
Published By | Publication Date | Number of Pages |
ICC | 2012 | 265 |
If you are seeking a solid understanding of the latest updates to the International Residential Code
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
4 | Contents |
12 | PART 1 Administration (Chapter 1) |
13 | R105.2 Fences Exempt from Permit |
14 | PART 2 Definitions (Chapter 2) |
15 | R202 Definitions, Structural Composite Lumber |
17 | PART 3 Building Planning and Construction (Chapters 3 through 10) |
20 | R301.2.1 Wind Design Criteria |
23 | R301.2.1.2 Protection of Openings in Windborne Debris Regions |
25 | R301.2.2 Seismic Provisions |
27 | Table R301.5 Minimum Uniformly Distributed Live Loads |
30 | R302.1 Exterior Walls |
34 | R302.2.2 Parapet Exception |
36 | R302.5.1 Garage Opening Protection |
38 | R303 Mechanical Ventilation |
42 | R303.5 Ventilation Intake Openings |
44 | R308.4 Hazardous Locations for Glazing |
46 | R308.4.5 Glazing and Wet Surfaces |
48 | R308.4.6 Glazing Adjacent Stairs and Ramps |
51 | R308.4.7 Glazing Adjacent to the Bottom Stair Landing |
53 | R309.5 Garage Fire Sprinklers |
55 | R310.1 Emergency Escape and Rescue Openings |
57 | R310.2.2 Window Well Drainage |
58 | R311.3.1 Floor Elevations at the Required Egress Door |
60 | R311.7.5 Stair Treads and Risers |
62 | R311.7.6 Landings for Stairways |
63 | R312 Guards and Window Fall Protection |
67 | R314 Smoke Alarms |
70 | R315.2 Carbon Monoxide Detection Systems |
71 | R316.4 Thermal Barrier |
73 | R316.5.13 Thermal Barrier for Floors |
75 | R404.1.9 Isolated Masonry Piers |
78 | R405.1 Foundation Drainage |
80 | R501.3 Fire Protection of Floors |
82 | R507 Decks |
85 | R602.1.1 End-Jointed Lumber |
86 | Table R602.3(1) Fastener Schedule for Structural Members |
88 | R602.7, Table R602.7.1 Single Member Headers |
91 | R602.10 and R602.12 Wall Bracing |
94 | R602.10.1 Braced Wall Lines |
97 | R602.10.2 Braced Wall Panels |
100 | R602.10.3 Required Length of Bracing |
105 | R602.10.4 Construction Methods for Braced Wall Panels |
110 | R602.10.5 Minimum Length of a Braced Wall Panel |
113 | R602.10.6 Construction of Methods ABW, PFH, PFG, CS-PF, and BV-WSP |
118 | R602.10.6.5 Wall Bracing for Dwellings with Stone and Masonry Veneer in Seismic Design Categories D[Sub(0)], D[Sub(1)], and D[Sub(2)] |
123 | R602.10.7 Ends of Braced Wall Lines with Continuous Sheathing |
125 | R602.10.9 Braced Wall Panel Support |
127 | R602.12 Simplified Wall Bracing |
132 | R602.12.6 Narrow Panels for Simplified Wall Bracing |
134 | R607.3 Installation of Wall Ties |
135 | R703.7.3.2 Masonry Veneer Lintel |
137 | R703.7.4 Masonry Veneer Anchorage |
140 | R703.7.4.2 Grout Fill Behind Masonry Veneer |
142 | R703.8 Flashing |
144 | R703.12 Adhered Masonry Veneer |
146 | R802.7 Cutting, Drilling, and Notching of Roof Members |
148 | R802.11 Roof Uplift Resistance |
154 | R806 Roof Ventilation |
157 | R806.5 Unvented Attic Assemblies |
159 | R903.2.1 Roof Flashing Locations |
161 | R903.2.2 Crickets and Saddles |
162 | R905.2.7.2 Underlayment and High Wind |
165 | R905.2.8.3 Sidewall Flashing |
167 | R905.2.8.5 Roof Drip Edge |
169 | R907.3 Recovering versus Replacement Roofing |
171 | R1003.9.1, R1003.9.3 Masonry Chimney Caps and Rain Caps |
172 | R1005.7 Factory-Built Chimney Offsets |
173 | PART 4 Energy Conservation (Chapter 11) |
174 | N1101 Energy Efficiency |
176 | PART 5 Mechanical (Chapters 12 through 23) |
177 | M1301 Identification and Certification of Pipe, Tubing, and Fittings |
179 | M1411.6 Locking Access Port Caps |
180 | M1502.4 Dryer Exhaust Duct |
182 | M1506 Exhaust Openings |
184 | M1507 Mechanical Ventilation |
188 | M1601.1 Above-Ground Duct Systems |
190 | M1601.4.1 Duct Joints, Seams, and Connections |
192 | M1602.2 Prohibited Sources of Outdoor and Return Air |
194 | M1901 Ranges and Ovens |
196 | M2301, M2302 Thermal and Photovoltaic Solar Energy Systems |
198 | PART 6 Fuel Gas (Chapter 24) |
199 | G2409.1 Reduced Clearance to Combustible Materials |
200 | G2412, G2415 Pipe Identification and Certification |
202 | G2419.4 Sediment Trap |
203 | G2442.4 Prohibited Sources of Outdoor and Return Air |
205 | PART 7 Plumbing (Chapters 25 through 33) |
206 | P2503.5.1 Rough Plumbing Test |
207 | P2601.2 Connections to Drainage System |
209 | P2603.4 Pipes through Foundation Walls |
210 | P2606 Sealing of Annular Spaces |
212 | P2609.1, P2609.4 Identification and Certification |
214 | P2702.1, P2706.1 Plumbing Fixtures |
216 | P2709.1, P2709.2 Shower Receptors and Linings |
219 | P2709.2.4 Liquid-Type Shower Lining |
220 | P2713.1 Bathtub Waste Outlets and Overflows |
221 | P2801.5 Required Water Heater Pan |
223 | P2904.2.4.2 Minimum Fire Sprinkler Separation from Obstruction |
225 | P3003.19 Joints between Drainage Piping and Water Closets |
226 | P3007.3.5 Ejector Connection to the Drainage System |
227 | P3009 Gray-Water Recycling Systems |
230 | P3103.5 Location of Vent Terminal |
232 | PART 8 Electrical (Chapters 34 through 43) |
234 | E3608.1.2 Concrete-Encased Electrode |
236 | E3608.4 Supplemental Electrode Required |
238 | E3901.7 Outdoor Outlets |
240 | E3901.11 Receptacle Outlets in Foyers |
241 | E3902.11 Location of Ground-Fault Circuit Interrupters |
242 | E3905.8 Boxes at Fan Outlets |
244 | E4001.11.1 Switch and Faceplate Grounding |
246 | E4001.15 Switches Controlling Lighting Loads |
248 | E4002.14 Tamper-Resistant Receptacles |
250 | E4204.2 Bonded Parts of Pools, Spas, and Hot Tubs |
252 | E4209.3 Accessibility to Electrical Equipment of Hydromassage Bathtubs |
254 | Index A B C |
255 | D E F |
256 | G H I K L M |
257 | N O P R |
258 | S T U V W |