Shopping Cart

No products in the cart.

IEEE 400.3 2007

$37.38

IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

Published By Publication Date Number of Pages
IEEE 2007 46
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

New IEEE Standard – Active. This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.

PDF Catalog

PDF Pages PDF Title
1 Cover
3 IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment
6 Introduction
Notice to users
Errata
Interpretations
Patents
7 Participants
9 Contents
11 IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment
1. Overview
12 1.1 Scope
1.2 Purpose
1.3 Background
13 2. Normative references
3. Definitions, acronyms, and abbreviations
3.1 Definitions
14 3.2 Acronyms and abbreviations
15 4. Partial discharge data interpretation
18 4.1 Type and location of defects
22 4.2 Insulating materials
4.3 Operating conditions
23 5. Partial discharge detection
24 5.1 General test setup
25 5.2 Partial discharge detection methods
26 5.3 Partial discharge detection sensitivity
5.4 Partial discharge location
29 5.5 Test limitations
30 6. Voltage sources
6.1 Sinusoidal power-frequency voltage sources
31 6.2 Alternative voltage sources
32 7. Practical testing guidelines
7.1 Pre-test owner information
33 7.2 Preliminary inspection and/or testing
7.3 Pre-test conference
7.4 Test conditions (voltage levels and duration)
34 8. Test results and recommendations
8.1 Interpretation of test results—recommendations and implications
36 8.2 Partial discharge test documentation
38 9. Safety
9.1 Personal protective equipment
9.2 Switching and blocking practices
9.3 Grounding and responsibility for control of cable
39 9.4 Safety of the public
9.5 Daily safety meeting
10. Conclusions
40 Annex A (informative) Partial discharge and water trees
41 Annex B (informative) Effect of cavity shape on partial discharge inception voltage
42 Annex C (normative) Partial discharge calibration and location accuracy
44 Annex D (informative) Bibliography
IEEE 400.3 2007
$37.38