IEEE 400.3 2007
$37.38
IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment
Published By | Publication Date | Number of Pages |
IEEE | 2007 | 46 |
New IEEE Standard – Active. This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
3 | IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment |
6 | Introduction Notice to users Errata Interpretations Patents |
7 | Participants |
9 | Contents |
11 | IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment 1. Overview |
12 | 1.1 Scope 1.2 Purpose 1.3 Background |
13 | 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions |
14 | 3.2 Acronyms and abbreviations |
15 | 4. Partial discharge data interpretation |
18 | 4.1 Type and location of defects |
22 | 4.2 Insulating materials 4.3 Operating conditions |
23 | 5. Partial discharge detection |
24 | 5.1 General test setup |
25 | 5.2 Partial discharge detection methods |
26 | 5.3 Partial discharge detection sensitivity 5.4 Partial discharge location |
29 | 5.5 Test limitations |
30 | 6. Voltage sources 6.1 Sinusoidal power-frequency voltage sources |
31 | 6.2 Alternative voltage sources |
32 | 7. Practical testing guidelines 7.1 Pre-test owner information |
33 | 7.2 Preliminary inspection and/or testing 7.3 Pre-test conference 7.4 Test conditions (voltage levels and duration) |
34 | 8. Test results and recommendations 8.1 Interpretation of test results—recommendations and implications |
36 | 8.2 Partial discharge test documentation |
38 | 9. Safety 9.1 Personal protective equipment 9.2 Switching and blocking practices 9.3 Grounding and responsibility for control of cable |
39 | 9.4 Safety of the public 9.5 Daily safety meeting 10. Conclusions |
40 | Annex A (informative) Partial discharge and water trees |
41 | Annex B (informative) Effect of cavity shape on partial discharge inception voltage |
42 | Annex C (normative) Partial discharge calibration and location accuracy |
44 | Annex D (informative) Bibliography |