IEEE C2-2023
$115.92
2023 National Electrical Safety Code(R) (NESC(R)) (Published)
Published By | Publication Date | Number of Pages |
IEEE | 2023 | 412 |
Revision Standard – Active. The 2023 NESC(R) covers practical safeguarding of persons during the installation, operation, or maintenance of (1) electric supply stations, (2) overhead supply and communications lines, and (3) underground or buried supply and communication cables. It also includes work rules for the operation of electric supply and communications lines and equipment. This Code consists of the introduction, definitions, grounding rules, lists of referenced and bibliographic documents, and Parts 1, 2, 3, and 4 of the 2023 Edition of the National Electrical Safety Code.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 2023 National Electrical Safety Code® (NESC®) Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning the NESC® |
7 | Foreword |
13 | Committee Membership |
24 | Procedure for revising the NESC |
26 | Time schedule for the next revision of the NESC |
29 | Contents |
35 | Figures |
37 | Tables |
40 | Section 1. Introduction to the National Electrical Safety Code® 010. Purpose 011. Scope |
42 | 012. General rules |
43 | 013. Application |
44 | 014. Waiver for emergency and temporary installations 015. Intent |
45 | 016. Effective date 017. Units of measure 018. Method of calculation |
46 | Section 2. Definitions of special terms |
59 | Section 3. References |
62 | Section 9. Grounding methods for electric supply and communications facilities 090. Purpose 091. Scope 092. Point of connection of grounding conductor |
65 | 093. Grounding conductor and means of connection |
68 | 094. Grounding electrodes |
71 | 095. Method of connection to electrode |
72 | 096. Ground resistance requirements |
73 | 097. Separation of grounding conductors |
74 | 098. Number 098 not used in this edition. 099. Additional requirements for grounding and bonding of communication apparatus |
76 | Part 1. Safety Rules for the Installation and Maintenance of Electric Supply Stations and Equipment Section 10. Purpose and scope of rules 100. Purpose 101. Scope 102. Application of rules 103. Referenced sections |
77 | Section 11. Protective arrangements in electric supply stations 110. General requirements |
80 | 111. Illumination |
82 | 112. Floors, floor openings, passageways, and stairs 113. Exits |
84 | Section 12. Installation and maintenance of equipment 120. General requirements 121. Inspections 122. Guarding shaft ends, pulleys, belts, and suddenly moving parts 123. Protective grounding |
85 | 124. Guarding live parts |
92 | 125. Working space about electric equipment |
93 | 126. Equipment for work on energized parts 127. Classified locations |
96 | 128. Identification 129. Mobile hydrogen equipment |
97 | Section 13. Rotating equipment 130. Speed control and stopping devices 131. Motor control |
98 | 132. Number 132 not used in this edition. 133. Short-circuit protection |
99 | Section 14. Storage batteries 140. General |
100 | 141. Switchgear and plant batteries 142. Grid storage batteries |
101 | Section 15. Transformers and regulators 150. Current-transformer secondary circuits protection when exceeding 600 V 151. Grounding secondary circuits of instrument transformers 152. Location and arrangement of power transformers and regulators |
102 | 153. Short-circuit protection of power transformers |
103 | Section 16. Conductors 160. Application 161. Electrical protection 162. Mechanical protection and support 163. Isolation 164. Conductor terminations |
105 | Section 17. Circuit breakers, reclosers, switches, fuses, and other equipment 170. General 171. Arrangement 172. Application 173. Circuit breakers, reclosers, and switches containing oil 174. Switches and disconnecting devices |
106 | 175. Disconnection of fuses 176. Open gaps and breaks 177. Arresters |
107 | Section 18. Switchgear and metal-enclosed bus 180. Switchgear assemblies |
108 | 181. Metal-enclosed bus |
110 | Section 19. Photovoltaic generating stations 190. General 191. Location 192. Grounding configurations 193. Vegetation management 194. DC overcurrent protection 195. DC conductors |
111 | Part 2. Safety Rules for the Installation and Maintenance of Overhead Electric Supply and Communication Lines Section 20. Purpose, scope, and application of rules 200. Purpose 201. Scope 202. Application of rules |
112 | Section 21. General requirements 210. Referenced sections 211. Number 211 not used in this edition. 212. Induced voltages 213. Accessibility 214. Inspection and tests of lines and equipment |
113 | 215. Grounding and bonding |
115 | 216. Arrangement of switches |
116 | 217. General |
118 | 218. Vegetation management |
119 | Section 22. Relations between various classes of lines and equipment 220. Relative levels |
120 | 221. Avoidance of conflict |
121 | 222. Joint use of structures 223. Communications protective requirements 224. Communication circuits located within the supply space and supply circuits located within the communication space |
123 | 225. Electric railway construction |
125 | Section 23. Clearances 230. General |
132 | 231. Clearances of supporting structures from other objects |
133 | 232. Vertical clearances of wires, conductors, cables, and equipment aboveground, roadway, rail, or water surfaces |
144 | 233. Clearances between wires, conductors, and cables carried on different supporting structures |
153 | 234. Clearance of wires, conductors, cables, and equipment from buildings, bridges, rail cars, swimming pools, supporting structures, and other installations |
177 | 235. Clearance for wires, conductors, or cables carried on the same supporting structure |
196 | 236. Climbing space |
200 | 237. Working space |
201 | 238. Clearances at the support between specified communications and supply facilities located on the same structure |
206 | 239. Clearance of vertical and lateral facilities from other facilities and surfaces on the same supporting structure |
212 | Section 24. Grades of construction 240. General 241. Application of grades of construction to different situations |
213 | 242. Grades of construction for conductors |
215 | 243. Grades of construction for line supports |
217 | Section 25. Structural loadings for Grades B and C 250. General loading requirements and maps |
234 | 251. Conductor loading |
235 | 252. Loads on line supports |
237 | 253. Load factors for structures, crossarms, support hardware, guys, foundations, and anchors |
239 | Section 26. Strength requirements 260. General (see also Section 20) |
240 | 261. Grades B and C construction |
249 | 262. Number 262 not used in this edition. 263. Grade N construction |
251 | 264. Guying and bracing |
253 | Section 27. Line insulation 270. Application of rule 271. Material and marking 272. Ratio of flashover to puncture voltage 273. Insulation level |
254 | 274. Factory tests 275. Special insulator applications |
255 | 276. Number 276 not used in this edition. 277. Mechanical strength of insulators |
256 | 278. Aerial cable systems |
257 | 279. Guy and span insulators |
258 | 28. Section number 28 not used in this edition. 29. Section number 29 not used in this edition. |
259 | Part 3. Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines Section 30. Purpose, scope, and application of rules 300. Purpose 301. Scope 302. Application of rules |
260 | Section 31. General requirements applying to underground lines 310. Referenced sections 311. Installation and maintenance 312. Accessibility 313. Inspection and tests of lines and equipment |
261 | 314. Grounding of circuits and equipment 315. Communications protective requirements |
262 | 316. Induced voltage |
263 | Section 32. Underground conduit systems 320. Location |
264 | 321. Excavation and backfill |
265 | 322. Conduit, ducts, and joints |
266 | 323. Manholes, handholes, and vaults |
270 | Section 33. Supply cable 330. General 331. Sheaths and jackets 332. Shielding 333. Cable accessories and joints |
272 | Section 34. Cable in underground structures 340. General 341. Installation |
273 | 342. Grounding and bonding |
274 | 343. Number not used in this edition. 344. Communication cables containing special supply circuits |
275 | Section 35. Direct-buried cable and cable in duct not part of a conduit system 350. General |
276 | 351. Location and routing |
277 | 352. Installation |
279 | 353. Deliberate separations—Equal to or greater than 12 in (300 mm) from underground structures or other cables 354. Random separation—Separation less than 12 in (300 mm) from underground structures or other cables |
282 | 355. Additional rules for duct not part of a conduit system |
283 | Section 36. Risers 360. General 361. Installation 362. Pole risers—Additional requirements 363. Pad-mounted installations |
284 | Section 37. Supply cable terminations 370. General 371. Support at terminations 372. Identification 373. Clearances in enclosures or vaults 374. Grounding |
285 | Section 38. Equipment 380. General 381. Design |
286 | 382. Location in underground structures 383. Installation 384. Grounding and bonding 385. Identificaiton |
287 | Section 39. Installation in tunnels 390. General 391. Environment |
288 | Part 4. Work Rules for the Operation of Electric Supply and Communications Lines and Equipment Section 40. Purpose and scope 400. Purpose 401. Scope 402. Referenced sections |
289 | Section 41. Supply and communications systems—Rules for employers 410. General requirements |
296 | 411. Protective methods and devices |
298 | Section 42. General rules for employees 420. General |
302 | 421. General operating routines |
303 | 422. Overhead line operating procedures 423. Underground line operating procedures |
306 | Section 43. Additional rules for communications employees 430. General 431. Approach to energized conductors or parts |
308 | 432. Joint-use structures 433. Attendant on surface at joint-use manhole 434. Sheath continuity |
309 | Section 44. Additional rules for supply employees 440. General 441. Energized conductors or parts |
319 | 442. Switching control procedures |
320 | 443. Work on energized lines and equipment |
322 | 444. De-energizing equipment or lines to protect employees |
324 | 445. Protective grounds |
325 | 446. Live work |
326 | 447. Protection against arcing and other damage while installing and maintaining insulators and conductors |
327 | Appendix A—Uniform system of clearances adopted in the 1990 Edition |
332 | Appendix B—Uniform clearance calculations for conductors under ice and wind conditions adopted in the 2007 Edition |
335 | Appendix C—Example applications for Rule 250C, Table 250-2, Table 250-3(a), and Table 250-3(b) |
350 | Appendix D—Practical Approaches to Reducing Transient Overvoltages Factors for Live Work |
355 | Appendix E—Bibliography |
360 | Annex 1—Metric tables and figures |
396 | Annex 2—Letter symbols for units |
398 | Index A-C C-D |
399 | D-F |
401 | F-G |
402 | H-I |
403 | I-L L-O |
405 | O |
407 | O-R R-S |
409 | S-T |
410 | T-U U-W |
412 | Back cover |