IEEE C57.19.100-2012
$41.71
IEEE Guide for Application of Power Apparatus Bushings
Published By | Publication Date | Number of Pages |
IEEE | 2012 | 42 |
Revision Standard – Active. Guidance on the use of outdoor power apparatus bushings is provided. The bushings are limited to those built in accordance with IEEE Std C57.19.00-1991. General information and recommendations for the application of power apparatus bushings when incorporated as part of power transformers, power circuit breakers, and isolated-phase bus are provided.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C57.19.100-2012 Front Cover |
3 | Title Page |
6 | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata Patents |
8 | Participants |
10 | Introduction |
11 | Contents |
13 | Important Notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 2. Normative references 3. Deļ¬nitions |
15 | 4. Thermal loading above nameplate rating for bushings applied on power transformers 4.1 General |
17 | 4.2 Temperature calculations for short-time loads above bushing rating |
20 | 4.3 Test procedures for derivation of mathematical model |
23 | 5. Special considerations for application of bushings to power transformers 5.1 General 5.2 Loading of bushings with transformer top oil temperature rises between 55 C and 65 C |
24 | 5.3 Application of bushings in transformers with conservator oil preservation systems 5.4 Draw-lead application |
25 | 5.5 Draw-rod application 6. Thermal loading for bushings applied on circuit breakers 7. Thermal loading for bushings used with isolated-phase bus 7.1 Concerns for bushings used in isolated-phase bus |
26 | 7.2 Thermal coordination between the bushings and the isolated-phase bus 8. Allowable line pull (cantilever loading) 8.1 General (transformers and circuit breakers) 8.2 Mounting angles greater than 20 |
27 | 8.3 Circuit breaker applications 9. Application of bushings in unusual service conditions 9.1 Contaminated environments |
30 | 9.2 High altitudes 9.3 Application of outdoor bushings in indoor locations 9.4 Bushing monitors 10. Bushing maintenance practices 10.1 Mechanical maintenance and inspection |
32 | 10.2 Bushing repair |
33 | 10.3 Routine and special tests |
35 | 10.4 Bushing storage |
36 | 10.5 Bushing replacement |
37 | 11. Checklist |
38 | Annex A (informative) Examples of calculation procedures to determine hot-spot temperatures for bushings applied on transformers |
42 | Annex B (informative) Bibliography |