NationalGrid shared constr esb756 2023
$31.20
Electric System Bulletin No. 756 – January 2023: Requirements for Parallel Generation Connected to a National Grid Owned EPS
Published By | Publication Date | Number of Pages |
National Grid | 2023 | 160 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | Preface |
3 | Table of Contents Introduction |
6 | Revision History List of Appendices of ESB-756 |
7 | ESB-756 Appendix A |
8 | Table of Contents |
9 | 1.0 Purpose 2.0 Scope |
10 | 3.0 Definitions |
11 | 4.0 General 4.1 Permitted Connections 4.2 Access & Contacts |
12 | 4.3 Design Requirements |
16 | 4.4 Types of Generators or Other Parallel Sources |
19 | 4.5 Limitations |
20 | 5.0 Project Management 5.1 Responsibilities |
25 | 5.2 Cooperation |
27 | 5.3 Development of an Interconnection Arrangement |
28 | 5.4 Compliance 6.0 Service Installation 6.1 Service Equipment |
29 | 6.2 Grounding 6.3 Metering 7.0 Plant Requirements 7.1 Telemetering |
31 | 7.2 Telecommunictions Steps and Requirements |
32 | 7.3 Power Quality 7.4 Performance/Design |
34 | 7.5 Plant Protection |
38 | 8.0 Operating 8.1 Manual Disconnect Switch 8.2 Disconnection by the Compnay (Isolation) |
39 | 8.3 Other 9.0 Revision History |
40 | ESB-756 Appendix B |
41 | Table of Contents |
43 | 1.0 Purpose |
44 | 2.0 Scope |
45 | 3.0 Applicable Codes, Standards, and Guidelines |
46 | 4.0 Definitions 5.0 Interconnection Customer Interface Procedures 5.1 Application Process Overview |
51 | 5.2 Interconnection Process- Non Expedited 5.3 Objectives in the Application Process |
52 | 5.4 Special System Considerations |
53 | 5.5 Interconnection Charges |
55 | 6.0 Potential Issues Related to Interconnection 6.1 General Considerations |
57 | 6.2 Significant EPS Considerations |
58 | 7.0 General Design and Operating Requirements |
59 | 7.1 General Criteria |
61 | 7.2 Service Equipment and Revenue Metering |
62 | 7.3 Transformer |
64 | 7.4 Manual Disconnecting Means |
66 | 7.5 Generator Interrupting Device Requirements |
67 | 7.6 Protection and Protective Equipment Requirements |
76 | 7.7 Monitoring and Control (M&C) at DER Facility |
81 | 7.8 Voltage and Frequency Ride Through and Control Requirements |
83 | 8.0 Testing and Commissioning |
84 | 9.0 Operating 10.0 Power Quality Monitoring 10.1 Power Quality Compliance Verification |
85 | 10.2 Power Quality Disturbance and Mitigation 10.3 Transient Overvoltage/Load Rejection Overvoltage (LROV) 11.0 Facility Audit 12.0 Disconnection by the Company (Isolation) |
86 | 13.0 Revision History |
87 | Exhibits Attached Exhibit 1: Company Requirements for DER Systems Not Eligable for the Expedited Process Exhibit 2: Reference Maps of National Grid Upstate NY Secondary Netwrok EPS Areas |
89 | Exhibit 3: Distribution Secondary Grid and Spot Network Description |
90 | Exhibit 4 Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals |
91 | Figure 1: Sample Distributed Generator One-Line Diagram |
92 | Figure 2: Typical Symbology for Electrical Drawings |
93 | Exhibit 5: Recommended Guidelines for Functional Sinle-line Diagram Submittals |
94 | Figure 3: Sample Functional Single-Line Diagram |
95 | Figure 4: Typical 3V0 Requirements for Local EPS Ground Fault Detection Figure 5: Typical Overhead Single Primary Service Configuration in NY for Large DER Installations |
97 | Figure 6: Typical Underground Single Primary Service Configuration in NY for Large DER Installations |
98 | Exhibit 6: Net Metering Compliance Verification Checklist Exhibit 7: Net Metering Compliance Verification Checklist (Simplified Process) |
100 | ESB-756 Appendix C |
101 | Table of Contents |
103 | 1.0 Purpose |
104 | 2.0 Scope |
105 | 3.0 Applicable Codes, Standards, and Guidelines |
106 | 4.0 Definitions |
107 | 5.0 Interconnection Customer Interface Procedures 5.1 Application Process Overview |
112 | 5.2 Interconnection Process for DER Not Eligable for the Simplified Process 5.3 Objectives in the Application Process |
114 | 5.4 Special System Considerations |
116 | 5.5 Interconnection Charges |
117 | 6.0 Potential Issues Related to Interconnection 6.1 General Considerations |
119 | 6.2 Significant EPS Considerations |
120 | 7.0 General Design and Operating Requirements |
121 | 7.1 General Criteria |
123 | 7.2 Service Equipment and Revenue Metering |
125 | 7.3 Transformer |
127 | 7.4 Manual Generator Disconnecting Means |
129 | 7.5 Generator Interrupting Device Requirements |
130 | 7.6 Protection and Protective Equipment Requirements |
141 | 7.7 Monitoring and Control (M&C) at DER Facility |
143 | 7.8 Voltage and Frequency Ride Through and Control Requirements |
145 | 8.0 Testing and Commissioning |
146 | 9.0 Operating 10.0 Power Quality Monitoring 10.1 Power Quality Compliance Verification |
147 | 10.2 Power Quality Disturbance and Mitigation 10.3 Transient Overvoltage/Load Rejection Overvoltage (LROV) 11.0 Facility Audit 12.0 Disconnection by the Company (Isolation) |
148 | 13.0 Revision History |
149 | Exhibits Attached Exhibit 1: Company Requirements for Projects Not Eligable for the Simplified Process |
150 | Exhibit 2: Reference Maps of National Grid Massachusetts Secondary Network EPS Areas |
151 | Exhibit 3: Distribution Secondary Grid and Spot Network Description |
152 | Exhibit 4: Recommended Guidelines for Residential and Commercial Single-line Diagram Submittals |
153 | Figure 1: Sample Residential Photovoltaic Distributed Generator Installation – Single Phase, Net Metered |
154 | Figure 2: Sample Distributed Generator One-Line Diagram |
155 | Figure 3: Typical Symbology for Electrical Drawings |
156 | Exhibit 5: Recommended Guidelines for Functional Single-line Diagram Submittals |
157 | Figure 4: Sample Functional Single-Line Diagram |
158 | Figure 5: Typical 3V0 Requirements for Local EPS Ground Fault Detection |
159 | Exhibit 6: Typical Overhead Primary Service Configuration in MA for Large DER Installation |
160 | Exhibit 7: Net Metering Verification Checklist (Simplified Process) |