Shopping Cart

No products in the cart.

PIP PNE00003:2013

$30.55

Process Unit and Offsites Layout Guide

Published By Publication Date Number of Pages
PIP 2013-06-01 23
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Practice provides guidance for the design and layout of process units and offsites. This guide should be used as a starting point for the development of plans, electronic models, and working drawings for process units and offsites. This Practice should be coordinated with the overall site and offsites layout for geotechnical, grading, zoning, building codes, life safety code, fire codes, other regulatory requirements, and owner's and insurer's risk assessment requirements.

This Practice describes the guidelines for the layout of plot areas, equipment, pipe racks, piping, platforms, roadways, and other miscellaneous items.

Layout includes equipment location, access and egress for personnel safety, access for operations and maintenance, and provisions for operational housekeeping and constructability.

PIP PNE00003:2013
$30.55