WRC volume 42 No. 07-08:1987
$27.95
Progress Reports Volume 42 No. 07-08
Published By | Publication Date | Number of Pages |
WRC | 1987 | 94 |
Contents
– Executive Meeting and Attachments, May 20, 1987
– PVRC Steering Committee on Piping Systems, May 18, 1987
– Design Divsion, May 20, 1987
– Subcommittee on Bolted Flanged Connections, May 19, 1987
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges, May 18, 1987
– Task Group on Gasket Testing, January 27, 1987
– Task Group on Gasket Testing, May 19, 1987
– Subcommittee on Piping, Pumps and Valves, May 19, 1987
– Subcommittee on Piping, Pumps, and Valves, January 27, 1987
– Subcommittee on Dynamic Analysis of Pressure Components, May 19, 1987
– Task Group on Dynamic Stress Criteria, May 19, 1987
– Subcommittee on Elevated Temperature Design, May 19, 1987
– Subcommittee on Reinforced Openings and External Loadings, May 18, 1987
– Subcommittee on Shells and Ligaments, May 19, 1987
– Materials and Fabrication Division, May 20, 1987
– Subcommittee on Failure Modes of Components, May 19, 1987
– Subcommittee on Thermal and Mechanical Effects on Materials, May 20, 1987
– Subcommittee on Nondestructive Examinations of Components, April 27, 1987
– Subcommittee on Weld Metals and Welding Procedures, May 20, 1987