WRC volume 45 No. 01-02:1990
$27.95
Progress Reports Volume 45 No. 01-02
Published By | Publication Date | Number of Pages |
WRC | 1990 | 106 |
Contents
– Executive and Main Committee, January 12, 1990
– Continued Operation of Equipment, January 11, 1990
– Joint Tak Force on Non-Metallic Piping Requirements, November 9, 1989
– JPVRC Progress Report – January 1990
– PVRC Project on Review of ASME Nuclear Codes & Standards – January 10-11, 1990
– Subcommittee on Repair, Replacement and Modification, January 10-11, 1990
– Design Division, January 12, 1990
– Subcommittee on Piping, Pumps and Valves, January 11, 1990
– Subcommittee on Reinforced Openings and External Loadings, January 11, 1990
– Subcommittee on Dynamic Analysis and Testing, January 11, 1990
– Elevated Temperature Design and Elevated Temperature Behavior of Components, January 10, 1990
– Subcommittee on Shells and Ligaments, January 11, 1990
– Subcommittee on Shells and Ligaments, October 11, 1989
– Materials and Fabrication Division, January 12, 1990
– Subcommittee on Failure Modes Components, January 10, 1990
– Subcommittee on Nondestructive Examination of Components, January 11, 1990
– Subcommittee on Thermal and Mechanical Effects on Materials, January 11, 1990
– Subcommittee on Welds, January 11, 1990
– Materials and Fabrication Division, October 12, 1989
– Subcommittee on Thermal and Mechanical Effects on Materials, October 12, 1989
– Subcommittee on Elevated Temperature Behavior and T/G on Life Extension, October 11, 1989