{"id":15947,"date":"2024-10-16T22:00:21","date_gmt":"2024-10-16T22:00:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-std-1100-2005\/"},"modified":"2024-10-24T12:16:23","modified_gmt":"2024-10-24T12:16:23","slug":"ieee-std-1100-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-std-1100-2005\/","title":{"rendered":"IEEE STD 1100 2005"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1100-2005
IEEE Std 1100-2005 <\/td>\n<\/tr>\n
3<\/td>\nIEEE Recommended Practice for Powering and Grounding Electronic Equipment
IEEE Recommended Practice for Powering and Grounding Electronic Equipment <\/td>\n<\/tr>\n
4<\/td>\nAbstract\/Keywords
Abstract\/Keywords <\/td>\n<\/tr>\n
5<\/td>\nAcknowledgments
Acknowledgments <\/td>\n<\/tr>\n
7<\/td>\nIntroduction
Introduction <\/td>\n<\/tr>\n
8<\/td>\nParticipants
Participants <\/td>\n<\/tr>\n
11<\/td>\nContents
Contents <\/td>\n<\/tr>\n
15<\/td>\nChapter 1 Overview
Chapter 1 Overview
1.1 Scope
1.1 Scope
1.2 Purpose
1.2 Purpose
1.3 Background
1.3 Background <\/td>\n<\/tr>\n
16<\/td>\n1.4 Text organization
1.4 Text organization <\/td>\n<\/tr>\n
18<\/td>\n1.5 Bibliography
1.5 Bibliography <\/td>\n<\/tr>\n
19<\/td>\nChapter 2 Definitions
Chapter 2 Definitions
2.1 Introduction
2.1 Introduction
2.2 Alphabetical listing of terms
2.2 Alphabetical listing of terms <\/td>\n<\/tr>\n
27<\/td>\n2.3 Words avoided
2.3 Words avoided <\/td>\n<\/tr>\n
28<\/td>\n2.4 Acronyms and abbreviations
2.4 Acronyms and abbreviations <\/td>\n<\/tr>\n
32<\/td>\n2.5 Normative references
2.5 Normative references <\/td>\n<\/tr>\n
33<\/td>\n2.6 Bibliography
2.6 Bibliography <\/td>\n<\/tr>\n
35<\/td>\nChapter 3 General needs guidelines
Chapter 3 General needs guidelines
3.1 Introduction
3.1 Introduction <\/td>\n<\/tr>\n
37<\/td>\n3.2 Power quality considerations
3.2 Power quality considerations <\/td>\n<\/tr>\n
47<\/td>\n3.3 Grounding considerations
3.3 Grounding considerations <\/td>\n<\/tr>\n
52<\/td>\n3.4 Protection of susceptible equipment
3.4 Protection of susceptible equipment <\/td>\n<\/tr>\n
54<\/td>\n3.5 Information technology equipment (ITE)
3.5 Information technology equipment (ITE) <\/td>\n<\/tr>\n
60<\/td>\n3.6 Shielded, filtered, enclosed EMI\/EMC areas
3.6 Shielded, filtered, enclosed EMI\/EMC areas <\/td>\n<\/tr>\n
61<\/td>\n3.7 Safety systems
3.7 Safety systems <\/td>\n<\/tr>\n
62<\/td>\n3.8 Coordination with other codes, standards, and agencies
3.8 Coordination with other codes, standards, and agencies <\/td>\n<\/tr>\n
64<\/td>\n3.9 Normative references
3.9 Normative references <\/td>\n<\/tr>\n
65<\/td>\n3.10 Bibliography
3.10 Bibliography <\/td>\n<\/tr>\n
67<\/td>\nChapter 4 Fundamentals
Chapter 4 Fundamentals
4.1 Introduction
4.1 Introduction <\/td>\n<\/tr>\n
68<\/td>\n4.2 Electric power supplier\u2019s distribution system voltage disturbances
4.2 Electric power supplier’s distribution system voltage disturbances <\/td>\n<\/tr>\n
70<\/td>\n4.3 Voltage disturbances\u2014subtractive
4.3 Voltage disturbances\u2014subtractive <\/td>\n<\/tr>\n
77<\/td>\n4.4 Voltage surges and interference\u2014Additive
4.4 Voltage surges and interference\u2014Additive <\/td>\n<\/tr>\n
95<\/td>\n4.5 Steady-state voltage\/current wave shape distortion
4.5 Steady-state voltage\/current wave shape distortion <\/td>\n<\/tr>\n
112<\/td>\n4.6 High- and low-frequency regimes defined
4.6 High- and low-frequency regimes defined <\/td>\n<\/tr>\n
117<\/td>\n4.7 Impedance considerations
4.7 Impedance considerations <\/td>\n<\/tr>\n
135<\/td>\n4.8 Grounding subsystems
4.8 Grounding subsystems <\/td>\n<\/tr>\n
164<\/td>\n4.9 Shielding concepts
4.9 Shielding concepts <\/td>\n<\/tr>\n
168<\/td>\n4.10 Surge protective devices
4.10 Surge protective devices <\/td>\n<\/tr>\n
172<\/td>\n4.11 Normative references
4.11 Normative references
4.12 Bibliography
4.12 Bibliography <\/td>\n<\/tr>\n
177<\/td>\nChapter 5 Instrumentation
Chapter 5 Instrumentation
5.1 Introduction
5.1 Introduction
5.2 Range of available instrumentation
5.2 Range of available instrumentation
5.3 Voltage and current measurements
5.3 Voltage and current measurements <\/td>\n<\/tr>\n
183<\/td>\n5.4 Descriptions of site survey tools
5.4 Descriptions of site survey tools <\/td>\n<\/tr>\n
190<\/td>\n5.5 Measurement considerations
5.5 Measurement considerations <\/td>\n<\/tr>\n
193<\/td>\n5.6 Normative references
5.6 Normative references
5.7 Bibliography
5.7 Bibliography <\/td>\n<\/tr>\n
195<\/td>\nChapter 6 Site surveys and site power analyses
Chapter 6 Site surveys and site power analyses
6.1 Introduction
6.1 Introduction
6.2 Objectives and approaches
6.2 Objectives and approaches <\/td>\n<\/tr>\n
196<\/td>\n6.3 Coordinating involved parties
6.3 Coordinating involved parties <\/td>\n<\/tr>\n
197<\/td>\n6.4 Conducting a site survey
6.4 Conducting a site survey <\/td>\n<\/tr>\n
215<\/td>\n6.5 Harmonic current and voltage measurements
6.5 Harmonic current and voltage measurements <\/td>\n<\/tr>\n
216<\/td>\n6.6 Applying data to select cost-effective solutions
6.6 Applying data to select cost-effective solutions <\/td>\n<\/tr>\n
217<\/td>\n6.7 Long-term power monitoring
6.7 Long-term power monitoring
6.8 Conclusions
6.8 Conclusions <\/td>\n<\/tr>\n
218<\/td>\n6.9 Normative references
6.9 Normative references <\/td>\n<\/tr>\n
219<\/td>\n6.10 Bibliography
6.10 Bibliography <\/td>\n<\/tr>\n
221<\/td>\nChapter 7 Specification and selection of equipment and materials
Chapter 7 Specification and selection of equipment and materials
7.1 Introduction
7.1 Introduction
7.2 Commonly used power correction devices
7.2 Commonly used power correction devices <\/td>\n<\/tr>\n
250<\/td>\n7.3 Equipment specifications
7.3 Equipment specifications <\/td>\n<\/tr>\n
257<\/td>\n7.4 Procurement specifications
7.4 Procurement specifications <\/td>\n<\/tr>\n
260<\/td>\n7.5 Verification testing
7.5 Verification testing <\/td>\n<\/tr>\n
262<\/td>\n7.6 Equipment maintenance
7.6 Equipment maintenance <\/td>\n<\/tr>\n
264<\/td>\n7.7 Bibliography
7.7 Bibliography <\/td>\n<\/tr>\n
267<\/td>\nChapter 8 Recommended design\/installation practices
Chapter 8 Recommended design\/installation practices
8.1 Introduction
8.1 Introduction <\/td>\n<\/tr>\n
268<\/td>\n8.2 Equipment room wiring and grounding
8.2 Equipment room wiring and grounding <\/td>\n<\/tr>\n
269<\/td>\n8.3 Electrical power system selection considerations
8.3 Electrical power system selection considerations <\/td>\n<\/tr>\n
276<\/td>\n8.4 Equipment selection and installation considerations
8.4 Equipment selection and installation considerations <\/td>\n<\/tr>\n
293<\/td>\n8.5 Grounding considerations
8.5 Grounding considerations <\/td>\n<\/tr>\n
314<\/td>\n8.6 Lightning\/surge protection considerations
8.6 Lightning\/surge protection considerations <\/td>\n<\/tr>\n
318<\/td>\n8.7 380 Hz to 480 Hz systems
8.7 380 Hz to 480 Hz systems <\/td>\n<\/tr>\n
321<\/td>\n8.8 Normative references
8.8 Normative references <\/td>\n<\/tr>\n
322<\/td>\n8.9 Bibliography
8.9 Bibliography <\/td>\n<\/tr>\n
325<\/td>\nChapter 9 Telecommunications, information technology, and distributed computing
Chapter 9 Telecommunications, information technology, and distributed computing
9.1 Introduction
9.1 Introduction <\/td>\n<\/tr>\n
328<\/td>\n9.2 Vulnerability concerns vs. immunity
9.2 Vulnerability concerns vs. immunity <\/td>\n<\/tr>\n
330<\/td>\n9.3 Environmental exposure
9.3 Environmental exposure
9.4 Industry guidelines
9.4 Industry guidelines
9.5 General compliance
9.5 General compliance <\/td>\n<\/tr>\n
332<\/td>\n9.6 Principles for establishing recommended practices
9.6 Principles for establishing recommended practices <\/td>\n<\/tr>\n
334<\/td>\n9.7 General considerations
9.7 General considerations <\/td>\n<\/tr>\n
335<\/td>\n9.8 Powering
9.8 Powering <\/td>\n<\/tr>\n
384<\/td>\n9.9 Grounding and bonding
9.9 Grounding and bonding <\/td>\n<\/tr>\n
435<\/td>\n9.10 Evaluations and audits
9.10 Evaluations and audits <\/td>\n<\/tr>\n
437<\/td>\n9.11 Normative references
9.11 Normative references <\/td>\n<\/tr>\n
438<\/td>\n9.12 Bibliography
9.12 Bibliography <\/td>\n<\/tr>\n
440<\/td>\nAnnex 9A (normative) General
Annex 9A (normative) General <\/td>\n<\/tr>\n
450<\/td>\nAnnex 9B (normative) Nomenclature
Annex 9B (normative) Nomenclature <\/td>\n<\/tr>\n
453<\/td>\nAnnex 9C (informative) List of telecommunications-related industry guidelines
Annex 9C (informative) List of telecommunications-related industry guidelines <\/td>\n<\/tr>\n
483<\/td>\nAnnex 9D (informative) Trends and changing responsibilities
Annex 9D (informative) Trends and changing responsibilities <\/td>\n<\/tr>\n
489<\/td>\nAnnex 9E (informative) Background on telecommunications
Annex 9E (informative) Background on telecommunications <\/td>\n<\/tr>\n
494<\/td>\nAnnex 9F (normative) Industry-described telecommunications surge environment
Annex 9F (normative) Industry-described telecommunications surge environment <\/td>\n<\/tr>\n
510<\/td>\nAnnex 9G (informative) Impact of technology convergence on ac and dc powering
Annex 9G (informative) Impact of technology convergence on ac and dc powering <\/td>\n<\/tr>\n
512<\/td>\nAnnex 9H (informative) Factors in selecting large-scale ac and dc power
Annex 9H (informative) Factors in selecting large-scale ac and dc power <\/td>\n<\/tr>\n
518<\/td>\nAnnex 9I (informative) Highlights of ANSI T1.311 requirements for dc power systems
Annex 9I (informative) Highlights of ANSI T1.311 requirements for dc power systems <\/td>\n<\/tr>\n
520<\/td>\nAnnex 9J (informative) Understanding telecommunications circuit protection
Annex 9J (informative) Understanding telecommunications circuit protection <\/td>\n<\/tr>\n
528<\/td>\nAnnex 9K (normative) Fundamental concepts on surge protection
Annex 9K (normative) Fundamental concepts on surge protection <\/td>\n<\/tr>\n
533<\/td>\nAnnex 9L (informative) Additional information on surge protection
Annex 9L (informative) Additional information on surge protection <\/td>\n<\/tr>\n
543<\/td>\nChapter 10 Industrial systems
Chapter 10 Industrial systems
10.1 Introduction
10.1 Introduction
10.2 Basic noise control theory
10.2 Basic noise control theory <\/td>\n<\/tr>\n
550<\/td>\n10.3 Method of analysis
10.3 Method of analysis <\/td>\n<\/tr>\n
551<\/td>\n10.4 Recommended practices
10.4 Recommended practices <\/td>\n<\/tr>\n
573<\/td>\n10.5 Distance, long power cable runs
10.5 Distance, long power cable runs
10.6 Bibliography
10.6 Bibliography <\/td>\n<\/tr>\n
575<\/td>\nChapter 11 Case histories
Chapter 11 Case histories
11.1 Introduction
11.1 Introduction
11.2 Typical utility-sourced power quality problems
11.2 Typical utility-sourced power quality problems <\/td>\n<\/tr>\n
577<\/td>\n11.3 Premises switching generated surges
11.3 Premises switching generated surges <\/td>\n<\/tr>\n
578<\/td>\n11.4 Electronic loads
11.4 Electronic loads <\/td>\n<\/tr>\n
580<\/td>\n11.5 Premises-wiring-related problems
11.5 Premises-wiring-related problems <\/td>\n<\/tr>\n
586<\/td>\n11.6 Transient voltage surge suppression network design\u2014primary and secondary network design
11.6 Transient voltage surge suppression network design\u2014primary and secondary network design <\/td>\n<\/tr>\n
587<\/td>\n11.7 Typical radiated EMI problems
11.7 Typical radiated EMI problems <\/td>\n<\/tr>\n
588<\/td>\n11.8 Flicker
11.8 Flicker
11.9 Typical electrical inspection problems
11.9 Typical electrical inspection problems <\/td>\n<\/tr>\n
589<\/td>\n11.10 Typical life-safety system problems
11.10 Typical life-safety system problems <\/td>\n<\/tr>\n
590<\/td>\n11.11 Typical misapplication of equipment problems
11.11 Typical misapplication of equipment problems
11.12 Normative references
11.12 Normative references
11.13 Bibliography
11.13 Bibliography <\/td>\n<\/tr>\n
591<\/td>\nIndex
Index
A\u2013C
A\u2013C <\/td>\n<\/tr>\n
592<\/td>\nC\u2013D
C\u2013D <\/td>\n<\/tr>\n
593<\/td>\nD\u2013E
D\u2013E <\/td>\n<\/tr>\n
594<\/td>\nE\u2013G
E\u2013G <\/td>\n<\/tr>\n
595<\/td>\nG\u2013I
G\u2013I <\/td>\n<\/tr>\n
596<\/td>\nI\u2013L
I\u2013L <\/td>\n<\/tr>\n
597<\/td>\nL\u2013O
L\u2013O <\/td>\n<\/tr>\n
598<\/td>\nO\u2013P
O\u2013P <\/td>\n<\/tr>\n
599<\/td>\nP\u2013R
P\u2013R <\/td>\n<\/tr>\n
600<\/td>\nR\u2013S
R\u2013S <\/td>\n<\/tr>\n
601<\/td>\nS\u2013T
S\u2013T <\/td>\n<\/tr>\n
602<\/td>\nT\u2013U
T\u2013U <\/td>\n<\/tr>\n
603<\/td>\nV\u2013W
V\u2013W <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Std 1100-2005 (Revision of IEEE Std 1100-1999) IEEE Recommended Practice for Powering and Grounding Electronic Equipment<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2006<\/td>\n603<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":15948,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-15947","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/15947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/15948"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=15947"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=15947"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=15947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}