{"id":166878,"date":"2024-10-19T10:08:14","date_gmt":"2024-10-19T10:08:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/fema-case-study-508-2014\/"},"modified":"2024-10-25T02:27:01","modified_gmt":"2024-10-25T02:27:01","slug":"fema-case-study-508-2014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/fema\/fema-case-study-508-2014\/","title":{"rendered":"FEMA Case Study 508 2014"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
7<\/td>\n | COVER SHEET <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | CS1.2 SAFE ROOM SITE AND \nFLOOR PLAN <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | A1.1 FLOOR PLAN <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | A1.2 FLOOR PLAN \u2013 DIMENSIONS <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | A2.1 ROOF PLAN <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | A3.1 ELEVATIONS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | A4.1 ELEVATIONS AND DETAIL <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | A5.1 ARCHITECTURAL DETAILS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | A6.1 ARCHITECTURAL DETAILS <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | A7.1 CEILING PLAN <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | S0.1 STRUCTURAL NOTES <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | S1.1 FOUNDATION PLAN <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | S2.1 LOW ROOF FRAMING PLAN <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | S3.1 STRUCTURAL DETAILS \u2013 FOUNDATION AND WALLS <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | S4.1 STRUCTURAL DETAILS \u2013 ROOF AND WALLS <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | M0.1 MECHANICAL SYMBOL SCHEDULE AND NOTES <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | M1.1 MECHANICAL FLOOR PLAN <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | M2.1 MECHANICAL ROOF PLAN <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | M3.1 MECHANICAL DETAILS <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | M3.2 MECHANICAL DETAILS <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | P1.1 WASTE & VENT PLUMBING FLOOR PLAN <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | P2.1 PLUMBING FLOOR PLAN <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | P3.1 PLUMBING SCHEDULES AND DETAIL <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | P3.2 PLUMBING DIAGRAMS <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | E0.1 ELECTRICAL SCHEDULES AND NOTES <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | E1.1 ELECTRICAL DETAILS <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | E2.1 ELECTRICAL POWER FLOOR PLAN <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | E3.1 ELECTRICAL LIGHTING FLOOR PLAN <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Case Study – School Community Safe Room: Southeast Kansas<\/b><\/p>\n |