{"id":182888,"date":"2024-10-19T11:26:48","date_gmt":"2024-10-19T11:26:48","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-ag-1-2017\/"},"modified":"2024-10-25T03:48:03","modified_gmt":"2024-10-25T03:48:03","slug":"asme-ag-1-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-ag-1-2017\/","title":{"rendered":"ASME AG 1 2017"},"content":{"rendered":"

Provides requirements for the performance, design, construction, acceptance testing, and quality assurance of equipment used as components in nuclear safety-related air and gas treatment systems in nuclear facilities.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
36<\/td>\nFOREWORD <\/td>\n<\/tr>\n
37<\/td>\nCOMMITTEE ROSTER <\/td>\n<\/tr>\n
40<\/td>\nCORRESPONDENCE WITH THE COMMITTEE ON NUCLEAR AIR AND GAS TREATMENT <\/td>\n<\/tr>\n
42<\/td>\nORGANIZATION OF ASME AG-1 <\/td>\n<\/tr>\n
44<\/td>\nASME AG-1\u20132017 SUMMARY OF CHANGES <\/td>\n<\/tr>\n
49<\/td>\nFigures and Tables Redesignated in ASME AG-1\u20132017 <\/td>\n<\/tr>\n
52<\/td>\nDivision I General Requirements <\/td>\n<\/tr>\n
53<\/td>\nSECTION AA COMMON ARTICLES
ARTICLE AA-1000 INTRODUCTION
AA-1100 SCOPE
AA-1200 PURPOSE
AA-1300 APPLICABILITY
AA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
56<\/td>\nARTICLE AA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
58<\/td>\nARTICLE AA-3000 MATERIALS
AA-3100 GENERAL
AA-3200 MATERIAL SUBSTITUTION
AA-3300 MATERIAL TESTING
AA-3400 CERTIFICATION OF MATERIALS
ARTICLE AA-4000 STRUCTURAL DESIGN
AA-4100 SCOPE <\/td>\n<\/tr>\n
59<\/td>\nTables
Table AA-3100-1 Allowable Materials <\/td>\n<\/tr>\n
62<\/td>\nAA-4200 DESIGN CRITERIA <\/td>\n<\/tr>\n
63<\/td>\nTable AA-4212-1 Load Conditions <\/td>\n<\/tr>\n
64<\/td>\nAA-4300 DESIGN OF EQUIPMENT SYSTEMS AND THEIR SUPPORTING ELEMENTS
Table AA-4230-1 Deflection Limits <\/td>\n<\/tr>\n
66<\/td>\nTable AA-4321-1 Plate- and Shell-Type Components: Primary Stress Allowables <\/td>\n<\/tr>\n
67<\/td>\nTable AA-4323-1 Linear-Type Systems: Primary Stress Allowables <\/td>\n<\/tr>\n
70<\/td>\nFigures
Figure AA-4355.3-1 Sine Beat Frequency and Amplitude
Figure AA-4355.4-1 Sine Amplitude Decay Rate <\/td>\n<\/tr>\n
71<\/td>\nFigure AA-4356.4-1 Response Spectrum of Composite Excitation <\/td>\n<\/tr>\n
72<\/td>\nFigure AA-4356.4-2 Oscillations per Beat <\/td>\n<\/tr>\n
73<\/td>\nAA-4400 DOCUMENTATION REQUIREMENTS <\/td>\n<\/tr>\n
74<\/td>\nARTICLE AA-5000 INSPECTION AND TESTING
AA-5100 GENERAL
AA-5200 VISUAL INSPECTION <\/td>\n<\/tr>\n
75<\/td>\nAA-5300 WELDED CONNECTIONS
AA-5400 BOLTED CONNECTIONS
AA-5500 FABRICATION TOLERANCES
AA-5600 PRESSURE AND LEAK TESTING
AA-5700 PERFORMANCE AND FUNCTIONAL TESTING
AA-5800 SEISMIC TESTING
ARTICLE AA-6000 FABRICATION, JOINING, WELDING, BRAZING, PROTECTIVE COATING, AND INSTALLATION
AA-6100 GENERAL <\/td>\n<\/tr>\n
76<\/td>\nAA-6200 FABRICATION PROCESSES <\/td>\n<\/tr>\n
77<\/td>\nAA-6300 WELDING REQUIREMENTS <\/td>\n<\/tr>\n
79<\/td>\nFigure AA-6324.2-1 Acceptable and Unacceptable Weld Profiles <\/td>\n<\/tr>\n
80<\/td>\nAA-6400 BRAZING <\/td>\n<\/tr>\n
81<\/td>\nAA-6500 CLEANING AND COATING <\/td>\n<\/tr>\n
84<\/td>\nAA-6600 INSTALLATION REQUIREMENTS <\/td>\n<\/tr>\n
85<\/td>\nARTICLE AA-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
AA-7100 GENERAL
AA-7200 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
86<\/td>\nAA-7300 PACKAGING
AA-7400 SHIPPING
ARTICLE AA-8000 QUALITY ASSURANCE
AA-8100 GENERAL <\/td>\n<\/tr>\n
87<\/td>\nAA-8200 IDENTIFICATION AND CONTROL OF ITEMS
Figure AA-8130-1 Hierarchy of Responsibility <\/td>\n<\/tr>\n
88<\/td>\nAA-8300 QUALITY ASSURANCE RECORDS
ARTICLE AA-9000 NAMEPLATES AND STAMPING
AA-9100 SCOPE AND APPLICABILITY
AA-9200 REQUIREMENTS
ARTICLE AA-10000 REPAIR AND REPLACEMENT OF COMPONENTS
AA-10100 GENERAL <\/td>\n<\/tr>\n
89<\/td>\nAA-10200 WELDING
AA-10300 REPAIRS
AA-10400 REPLACEMENTS
AA-10410 Routine Maintenance
AA-10420 Suitability
AA-10422 Component Failure Analysis.
AA-10423 Monitoring Plan.
AA-10430 Additional Documentation
AA-10431 Replacements Involving Welding or Brazing <\/td>\n<\/tr>\n
90<\/td>\nAA-10432 Replacements Involving Mechanical Joining
AA-10500 RECORDS
AA-10510 General Requirements
AA-10520 Records Index
AA-10530 Lifetime Records
AA-10540 Nonpermanent Records
Table AA-10530-1 Lifetime Repair and Replacement Records
Table AA-10540-1 Nonpermanent Repair and Replacement Records <\/td>\n<\/tr>\n
91<\/td>\nNONMANDATORY APPENDIX AA-A DESIGN AND QUALIFICATION BY ANALYSIS
ARTICLE AA-A-1000 INTRODUCTION
ARTICLE AA-A-2000 FINITE ELEMENT METHOD
ARTICLE AA-A-3000 EQUIPMENT CONSTRUCTION <\/td>\n<\/tr>\n
92<\/td>\nARTICLE AA-A-4000 MODELING TECHNIQUES
AA-A-4100 AIR HANDLING UNIT (AHU) MODEL
Table AA-A-1000-1 Analysis Considerations <\/td>\n<\/tr>\n
93<\/td>\nAA-A-4200 FAN MODEL
AA-A-4300 INSTRUMENTS AND CONTROLS (I & C) CABINETS
AA-A-4400 DUCT SUPPORTS
AA-A-4500 EQUIPMENT SUPPORTS
ARTICLE AA-A-5000 ANALYSIS
AA-A-5100 STATIC LOADS <\/td>\n<\/tr>\n
94<\/td>\nAA-A-5200 DYNAMIC ANALYSIS
AA-A-5210 Dynamic Loads
AA-A-5220 Dynamic Analysis Techniques
AA-A-5230 Input Motion
Figure AA-A-4200-1 Isometric View of a Typical Fan Model
Figure AA-A-4200-1 Isometric View of a Typical Fan Model <\/td>\n<\/tr>\n
95<\/td>\nAA-A-5240 Two-Step Analysis
ARTICLE AA-A-6000 EVALUATION OF RESULTS
AA-A-6100 STRESSES
Figure AA-A-4300-1 Isometric View of a Typical I & C Cabinet Model <\/td>\n<\/tr>\n
96<\/td>\nFigure AA-A-4400-1 Isometric View of a Typical Duct Support Model <\/td>\n<\/tr>\n
97<\/td>\nAA-A-6200 DEFLECTIONS
AA-A-6300 SUPPORT LOADS
AA-A-6400 CONNECTION LOADING
Figure AA-A-4500-1 Isometric View of a Typical Refrigeration Equipment Support <\/td>\n<\/tr>\n
98<\/td>\nAA-A-6500 DEVICE LOADING
ARTICLE AA-A-7000 SAMPLE PROBLEMS
AA-A-7100 SCOPE
AA-A-7200 SAMPLE AHU ANALYSIS
AA-A-7300 DUCT SUPPORT (HANGER) SAMPLE PROBLEM <\/td>\n<\/tr>\n
99<\/td>\nFigure AA-A-7200-1 Computer Plots of Finite Element Model of Sample AHU (Perspective View of Tri-Plate Mesh) <\/td>\n<\/tr>\n
101<\/td>\nFigure AA-A-7310-1 Typical Duct Support As-Built (Dimensions and Member Sizes Not Shown) <\/td>\n<\/tr>\n
102<\/td>\nFigure AA-A-7311-1 Ductwork Support Baseplate Model <\/td>\n<\/tr>\n
103<\/td>\nFigure AA-A-7324-1 Effective Duct Cross Section <\/td>\n<\/tr>\n
104<\/td>\nFigure AA-A-7325-1 Typical Duct System Model <\/td>\n<\/tr>\n
105<\/td>\nNONMANDATORY APPENDIX AA-B SEISMIC QUALIFICATION BY TESTING
ARTICLE AA-B-1000 TEST PLAN
ARTICLE AA-B-2000 OUTLINE FOR TYPICAL SEISMIC TEST PLAN
AA-B-2100 PURPOSE
AA-B-2200 SCOPE
AA-B-2300 TEST SPECIMENS
AA-B-2400 SPECIAL EQUIPMENT OR FIXTURES (IF REQUIRED)
AA-B-2500 TEST SETUP
AA-B-2600 TEST REQUIREMENTS
AA-B-2700 ACCEPTANCE\/FAILURE CRITERIA
AA-B-2800 TEST PROCEDURE <\/td>\n<\/tr>\n
106<\/td>\nAA-B-2900 FINAL REPORT
ARTICLE AA-B-3000 COMMENTARY ON OUTLINE FOR TYPICAL SEISMIC TEST PLANT
AA-B-3100 PURPOSE
AA-B-3200 SCOPE
AA-B-3300 TEST SPECIMENS
AA-B-3400 SPECIAL EQUIPMENT OR FIXTURES
AA-B-3500 TEST SETUP <\/td>\n<\/tr>\n
107<\/td>\nAA-B-3600 TEST REQUIREMENTS <\/td>\n<\/tr>\n
108<\/td>\nAA-B-3700 ACCEPTANCE AND FAILURE CRITERIA
AA-B-3800 TEST PROCEDURE
AA-B-3900 FINAL REPORT <\/td>\n<\/tr>\n
109<\/td>\nNONMANDATORY APPENDIX AA-C QUALIFICATION BY A COMBINATION OF ANALYSIS AND TESTING
ARTICLE AA-C-1000 INTRODUCTION
ARTICLE AA-C-2000 QUALIFICATION BY ANALYSIS ONLY
ARTICLE AA-C-3000 QUALIFICATION BY TESTING ONLY
AA-C-3100 TESTING PROGRAM CONSIDERATIONS
ARTICLE AA-C-4000 SUPPORTING TEST
AA-C-4100 COMMON APPLICATIONS
AA-C-4200 DYNAMIC AND STATIC SUPPORTING TESTS <\/td>\n<\/tr>\n
111<\/td>\nDivision II Ventilation Air Cleaning and Ventilation Air Conditioning <\/td>\n<\/tr>\n
112<\/td>\nSECTION BA FANS AND BLOWERS
ARTICLE BA-1000 INTRODUCTION
BA-1100 SCOPE
BA-1200 PURPOSE
BA-1300 APPLICABILITY
BA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
113<\/td>\nARTICLE BA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
114<\/td>\nARTICLE BA-3000 MATERIALS
BA-3100 GENERAL
BA-3200 SPECIAL LIMITATIONS ON MATERIALS
BA-3300 DESIGNATION OF MATERIALS
BA-3400 CERTIFICATION OF MATERIALS
BA-3500 PURCHASED MATERIALS
BA-3600 DRIVER MATERIALS
ARTICLE BA-4000 DESIGN
BA-4100 DESIGN CONDITIONS <\/td>\n<\/tr>\n
116<\/td>\nBA-4200 SELECTION
Table BA-4162-1 Maximum Allowable Displacement <\/td>\n<\/tr>\n
117<\/td>\nBA-4300 CONSTRUCTION <\/td>\n<\/tr>\n
119<\/td>\nBA-4400 REPORTS AND CALCULATIONS
ARTICLE BA-5000 INSPECTION AND TESTING
BA-5100 FAN INSPECTION AND TESTING <\/td>\n<\/tr>\n
121<\/td>\nBA-5200 DRIVER INSPECTION AND TESTING
ARTICLE BA-6000 FABRICATION AND INSTALLATION OF CENTRIFUGAL AND AXIAL FANS
BA-6100 FABRICATION
BA-6200 INSTALLATION
ARTICLE BA-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
BA-7100 GENERAL
BA-7200 PACKAGING
BA-7300 SHIPPING
BA-7400 RECEIVING
BA-7500 STORAGE
BA-7600 DRIVERS SHIPPED SEPARATELY <\/td>\n<\/tr>\n
122<\/td>\nARTICLE BA-8000 QUALITY ASSURANCE
BA-8100 GENERAL
BA-8200 REQUIRED DOCUMENTATION FOR FANS
BA-8300 DRAWINGS AND DOCUMENTATION
ARTICLE BA-9000 NAMEPLATES AND OPERATING AND MAINTENANCE MANUALS
BA-9100 GENERAL
BA-9200 FANS
BA-9300 ACCEPTABLE METHODS FOR MARKING ACCESSORIES
BA-9400 OPERATING AND MAINTENANCE MANUALS <\/td>\n<\/tr>\n
123<\/td>\nNONMANDATORY APPENDIX BA-A FAN SYSTEM CONSIDERATIONS
ARTICLE BA-A-1000 FAN CONSIDERATIONS
BA-A-1100 SYSTEM CHARACTERISTICS
BA-A-1200 SYSTEM EFFECTS ON FAN PERFORMANCE
BA-A-1300 FAN AND SYSTEM MATCHING
BA-A-1400 FAN-SYSTEM CAPACITY CONTROL
BA-A-1500 MULTIPLE FAN SYSTEMS <\/td>\n<\/tr>\n
124<\/td>\nNONMANDATORY APPENDIX BA-B DIVISION OF RESPONSIBILITY <\/td>\n<\/tr>\n
125<\/td>\nTable BA-B-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
127<\/td>\nSECTION DA DAMPERS AND LOUVERS
ARTICLE DA-1000 INTRODUCTION
DA-1100 SCOPE
DA-1200 PURPOSE
DA-1300 APPLICABILITY
DA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
129<\/td>\nARTICLE DA-2000 REFERENCED DOCUMENTS
ARTICLE DA-3000 MATERIALS
DA-3100 ALLOWABLE MATERIALS
DA-3200 SPECIAL LIMITATIONS ON MATERIALS
DA-3300 CERTIFICATION OF MATERIALS <\/td>\n<\/tr>\n
130<\/td>\nARTICLE DA-4000 DESIGN
DA-4100 GENERAL DESIGN
DA-4200 TECHNICAL REQUIREMENTS <\/td>\n<\/tr>\n
133<\/td>\nDA-4300 ACTUATORS <\/td>\n<\/tr>\n
134<\/td>\nDA-4400 ACCESSORIES
ARTICLE DA-5000 INSPECTION AND TESTING
DA-5100 TESTING <\/td>\n<\/tr>\n
135<\/td>\nARTICLE DA-6000 FABRICATION, FINISHING, AND INSTALLATION
DA-6100 WELDING AND BRAZING <\/td>\n<\/tr>\n
136<\/td>\nARTICLE DA-7000 PACKAGING, SHIPPING, AND STORAGE
ARTICLE DA-8000 QUALITY ASSURANCE
DA-8100 DAMPER AND LOUVER PERFORMANCE
DA-8300 QUALITY ASSURANCE RECORDS
ARTICLE DA-9000 NAMEPLATES, STAMPINGS, AND MANUALS
DA-9100 NAMEPLATES AND STAMPINGS
DA-9200 MANUALS <\/td>\n<\/tr>\n
137<\/td>\nMANDATORY APPENDIX DA-I SEAT AND FRAME LEAKAGE
Table DA-I-1000-1 Maximum Permissible Seat Leakage Rate, scfm\/ft2 (scmh\/m2), of Damper or Adjustable Louver Face Area at 1 in. wg (25.4 mm wg) Differential Pressure
Table DA-I-1000-2 Maximum Permissible Frame Leakage Rate Classes at Frame Design Pressure <\/td>\n<\/tr>\n
138<\/td>\nMANDATORY APPENDIX DA-II DAMPER AND LOUVER CONFIGURATIONS
Figure DA-II-1000-1 Parallel Blade Damper <\/td>\n<\/tr>\n
139<\/td>\nFigure DA-II-1000-2 <\/td>\n<\/tr>\n
140<\/td>\nFigure DA-II-1000-3 <\/td>\n<\/tr>\n
141<\/td>\nFigure DA-II-1000-4 Slide Gate Guillotine Damper <\/td>\n<\/tr>\n
142<\/td>\nFigure DA-II-1000-5 <\/td>\n<\/tr>\n
143<\/td>\nFigure DA-II-1000-6 <\/td>\n<\/tr>\n
144<\/td>\nNONMANDATORY APPENDIX DA-A DIVISION OF RESPONSIBILITY <\/td>\n<\/tr>\n
145<\/td>\nTable DA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
147<\/td>\nSECTION SA DUCTWORK
ARTICLE SA-1000 INTRODUCTION
SA-1100 SCOPE
SA-1200 PURPOSE
SA-1300 APPLICABILITY
SA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
148<\/td>\nARTICLE SA-2000 REFERENCED DOCUMENTS
ARTICLE SA-3000 MATERIALS
SA-3100 GENERAL
SA-3200 MATERIAL SUBSTITUTION
SA-3300 MATERIAL TESTING
SA-3400 MATERIAL SPECIFICATIONS <\/td>\n<\/tr>\n
149<\/td>\nFigure SA-1300-1 Ductwork and Ductwork Support \u2014 Interface Boundary <\/td>\n<\/tr>\n
150<\/td>\nARTICLE SA-4000 DESIGN
SA-4100 GENERAL
SA-4200 DESIGN CRITERIA <\/td>\n<\/tr>\n
151<\/td>\nSA-4300 DUCTWORK JOINTS AND SEAMS <\/td>\n<\/tr>\n
152<\/td>\nSA-4400 COMPONENTS <\/td>\n<\/tr>\n
153<\/td>\nSA-4500 PRESSURE BOUNDARY LEAKAGE <\/td>\n<\/tr>\n
154<\/td>\nSA-4600 DESIGN SPECIFICATION
ARTICLE SA-5000 INSPECTION AND TESTING
SA-5100 GENERAL
SA-5200 VISUAL INSPECTION <\/td>\n<\/tr>\n
155<\/td>\nSA-5300 PRESSURE BOUNDARY LEAKAGE TESTING <\/td>\n<\/tr>\n
156<\/td>\nSA-5400 STRUCTURAL CAPABILITY TESTS
ARTICLE SA-6000 FABRICATION AND INSTALLATION
SA-6100 GENERAL
SA-6200 FABRICATION PROCESSES <\/td>\n<\/tr>\n
157<\/td>\nSA-6300 MECHANICAL FASTENING
SA-6400 FABRICATION TOLERANCES
SA-6500 INSTALLATION TOLERANCES
SA-6600 CLEANING, FINISHING, AND COATING
ARTICLE SA-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
SA-7100 GENERAL
SA-7200 PACKAGING <\/td>\n<\/tr>\n
158<\/td>\nSA-7300 SHIPPING
SA-7400 RECEIVING
Table SA-6400-1 Rectangular Ducts: Maximum Allowable Tolerances <\/td>\n<\/tr>\n
159<\/td>\nTable SA-6400-2 Circular Ducts: Maximum Allowable Tolerances
Table SA-6400-3 Flatness of Surface: Maximum Allowable Waviness Tolerance <\/td>\n<\/tr>\n
160<\/td>\nSA-7500 STORAGE
ARTICLE SA-8000 QUALITY ASSURANCE
SA-8100 GENERAL
SA-8200 MATERIAL IDENTIFICATION
SA-8300 DRAWINGS AND DOCUMENTATION
ARTICLE SA-9000 NAMEPLATES AND STAMPING
SA-9100 GENERAL
SA-9200 STAMPING\/MARKING <\/td>\n<\/tr>\n
161<\/td>\nNONMANDATORY APPENDIX SA-A DIVISION OF RESPONSIBILITY
Table SA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
162<\/td>\nNONMANDATORY APPENDIX SA-B PROCEDURES TO DETERMINE ALLOWABLE LEAKAGE FOR DUCTWORK
ARTICLE SA-B-1000
SA-B-1100 PURPOSE
SA-B-1200 ALLOWABLE LEAKAGE BY HEALTH PHYSICS CRITERIA <\/td>\n<\/tr>\n
163<\/td>\nFigure SA-B-1221-1 Allowable Unit Leakage From Duct or Housing to Occupied Space <\/td>\n<\/tr>\n
166<\/td>\nFigure SA-B-1222-1 System Parameters <\/td>\n<\/tr>\n
168<\/td>\nFigure SA-B-1232.1-1 Control Room System Flow Diagram <\/td>\n<\/tr>\n
169<\/td>\nFigure SA-B-1232.2-1 Control Room System Flow Diagram With Leakage Paths <\/td>\n<\/tr>\n
172<\/td>\nSA-B-1300 ADDITIONAL LEAKAGE CRITERIA
Table SA-B-1234-1 Control Room Air Cleaning System Parameters for Leakage Analysis <\/td>\n<\/tr>\n
173<\/td>\nSA-B-1400 AIR CLEANING SYSTEM CONFIGURATIONS AND LEAKAGE CLASSES
Table SA-B-1234-2 Control Room Air Conditioning System Parameters for Leakage Analysis
Table SA-B-1310-1 Maximum Allowable Leakage Factors for Air Cleaning Effectiveness <\/td>\n<\/tr>\n
174<\/td>\nFigure SA-B-1410-1 Single-Pass Air Cleaning System Configuration <\/td>\n<\/tr>\n
175<\/td>\nFigure SA-B-1410-2 Recirculating Air Cleaning System Configurations <\/td>\n<\/tr>\n
176<\/td>\nFigure SA-B-1410-3 Recirculating Air Cleaning System Configurations <\/td>\n<\/tr>\n
177<\/td>\nNONMANDATORY APPENDIX SA-C ADDITIONAL GUIDELINES FOR DUCT DESIGN AND CONSTRUCTION
ARTICLE SA-C-1000
SA-C-1100 FUNCTIONAL DESIGN
SA-C-1200 GENERAL <\/td>\n<\/tr>\n
178<\/td>\nSA-C-1300 DUCT CONSTRUCTION STANDARDS
Table SA-C-1300-1 <\/td>\n<\/tr>\n
179<\/td>\nSECTION HA HOUSINGS
ARTICLE HA-1000 INTRODUCTION
HA-1100 SCOPE
HA-1200 PURPOSE
HA-1300 APPLICABILITY
HA-1400 DEFINITIONS AND TERMS
ARTICLE HA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
180<\/td>\nARTICLE HA-3000 MATERIALS
HA-3100 ALLOWABLE MATERIALS
HA-3200 SPECIAL LIMITATIONS ON MATERIALS
HA-3300 CERTIFICATION OF MATERIAL <\/td>\n<\/tr>\n
181<\/td>\nFigure HA-1300-1 Housing, Air Cleaning Unit: Walk-In Type
Figure HA-1300-2 Housing, Air Cleaning Unit: Side-Access Type <\/td>\n<\/tr>\n
182<\/td>\nARTICLE HA-4000 DESIGN
HA-4100 GENERAL DESIGN
HA-4200 DESIGN CRITERIA
Figure HA-1300-3 Housing, Air Conditioning Unit: Walk-In Type <\/td>\n<\/tr>\n
183<\/td>\nTable HA-4212-1 Load Combinations <\/td>\n<\/tr>\n
184<\/td>\nHA-4300 HOUSING JOINTS AND SEAMS
HA-4400 ACCESSORIES <\/td>\n<\/tr>\n
186<\/td>\nHA-4500 PRESSURE BOUNDARY LEAKAGE
HA-4600 DESIGN SPECIFICATION <\/td>\n<\/tr>\n
187<\/td>\nARTICLE HA-5000 INSPECTION AND TESTING
HA-5100 GENERAL
HA-5200 INSPECTION
HA-5300 PRESSURE BOUNDARY LEAKAGE TESTING <\/td>\n<\/tr>\n
188<\/td>\nHA-5400 MOUNTING FRAME TO HOUSING LEAKAGE TEST
HA-5500 STRUCTURAL CAPABILITY TEST
HA-5600 AIRFLOW DISTRIBUTION TESTS
HA-5700 AIR-AEROSOL MIXING UNIFORMITY TESTS
HA-5800 SAMPLING MANIFOLD TESTING <\/td>\n<\/tr>\n
189<\/td>\nHA-5900 AIR CONDITIONING AND AIR HANDLING UNIT TESTING
ARTICLE HA-6000 FABRICATION
HA-6100 GENERAL
HA-6200 FABRICATION PROCESS
HA-6300 MECHANICAL FASTENING <\/td>\n<\/tr>\n
190<\/td>\nHA-6400 FABRICATION TOLERANCES
HA-6500 CLEANING
ARTICLE HA-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
HA-7100 GENERAL
HA-7200 PACKAGING
HA-7300 SHIPPING
HA-7400 RECEIVING
HA-7500 STORAGE <\/td>\n<\/tr>\n
191<\/td>\nARTICLE HA-8000 QUALITY ASSURANCE
HA-8100 GENERAL
HA-8200 MATERIAL IDENTIFICATION
HA-8300 DRAWINGS AND DOCUMENTATION
ARTICLE HA-9000 NAMEPLATES AND STAMPING
HA-9100 GENERAL
HA-9200 STAMPING\/MARKING <\/td>\n<\/tr>\n
192<\/td>\nNONMANDATORY APPENDIX HA-A DIVISION OF RESPONSIBILITY
NONMANDATORY APPENDIX HA-A DIVISION OF RESPONSIBILITY
Table HA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
193<\/td>\nNONMANDATORY APPENDIX HA-B ADDITIONAL GUIDELINES FOR HOUSING DESIGN AND CONSTRUCTION
ARTICLE HA-B-1000
HA-B-1100 FUNCTIONAL DESIGN
HA-B-1200 GENERAL
NONMANDATORY APPENDIX HA-B ADDITIONAL GUIDELINES FOR HOUSING DESIGN AND CONSTRUCTION
ARTICLE HA-B-1000
HA-B-1100 FUNCTIONAL DESIGN
HA-B-1200 GENERAL <\/td>\n<\/tr>\n
195<\/td>\nNONMANDATORY APPENDIX HA-C MANIFOLD DESIGN GUIDELINES
ARTICLE HA-C-1000
HA-C-1100 GENERAL
HA-C-1200 MANIFOLD REQUIREMENTS FOR IN-PLACE TESTS
HA-C-1300 CONSIDERATIONS FOR USE OF PERMANENTLY INSTALLED MANIFOLDS
NONMANDATORY APPENDIX HA-C MANIFOLD DESIGN GUIDELINES
ARTICLE HA-C-1000
HA-C-1100 GENERAL
HA-C-1200 MANIFOLD REQUIREMENTS FORIN-PLACE TESTS
HA-C-1300 CONSIDERATIONS FOR USE OFPERMANENTLY INSTALLEDMANIFOLDS <\/td>\n<\/tr>\n
196<\/td>\nHA-C-1400 INJECTION MANIFOLDS
HA-C-1400 INJECTION MANIFOLDS
Figure HA-C-1230-1 Common Configurations Requiring Test Manifolds (Plan A) <\/td>\n<\/tr>\n
197<\/td>\nFigure HA-C-1230-2 Common Configurations Requiring Test Manifolds (Plan B) <\/td>\n<\/tr>\n
198<\/td>\nHA-C-1500 SAMPLE MANIFOLDS
HA-C-1500 SAMPLE MANIFOLDS
Figure HA-C-1230-3 Common Configurations Requiring Test Manifolds (Plan C) <\/td>\n<\/tr>\n
199<\/td>\nFigure HA-C-1230-4 Common Configurations Requiring Test Manifolds (Plan D) <\/td>\n<\/tr>\n
200<\/td>\nFigure HA-C-1230-5 Common Configurations Requiring Test Manifolds (Plan E) <\/td>\n<\/tr>\n
202<\/td>\nNONMANDATORY APPENDIX HA-D PERFORMANCE TEST FOR QUALIFICATION OF SAMPLING MANIFOLDS
ARTICLE HA-D-1000
HA-D-1100 PURPOSE
HA-D-1200 LIMITS
HA-D-1300 TEST REQUIREMENTS
HA-D-1310
HA-D-1320
HA-D-1330
HA-D-1340
HA-D-1350
HA-D-1360
HA-D-1370
HA-D-1380
HA-D-1400 TEST METHOD
NONMANDATORY APPENDIX HA-D PERFORMANCE TEST FOR QUALIFICATION OF SAMPLING MANIFOLDS
ARTICLE HA-D-1000
HA-D-1100 PURPOSE
HA-D-1200 LIMITS
HA-D-1300 TEST REQUIREMENTS
HA-D-1400 TEST METHOD <\/td>\n<\/tr>\n
203<\/td>\nHA-D-1500 ACCEPTANCE CRITERIA
HA-D-1600 DOCUMENTATION
HA-D-1700 ACCEPTANCE OF RESULTS
HA-D-1500 ACCEPTANCE CRITERIA
HA-D-1600 DOCUMENTATION
HA-D-1700 ACCEPTANCE OF RESULTS <\/td>\n<\/tr>\n
204<\/td>\nSECTION RA REFRIGERATION EQUIPMENT
ARTICLE RA-1000 INTRODUCTION
RA-1100 SCOPE
RA-1200 PURPOSE
RA-1300 APPLICABILITY
RA-1400 DEFINITIONS AND TERMS
ARTICLE RA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
205<\/td>\nARTICLE RA-3000 MATERIALS
RA-3100 GENERAL MATERIAL REQUIREMENTS <\/td>\n<\/tr>\n
206<\/td>\nARTICLE RA-4000 DESIGN REQUIREMENTS
RA-4100 PURPOSE
RA-4200 DESIGN SPECIFICATION
RA-4300 EQUIPMENT PERFORMANCE REQUIREMENTS <\/td>\n<\/tr>\n
207<\/td>\nRA-4400 MECHANICAL DESIGN REQUIREMENTS <\/td>\n<\/tr>\n
208<\/td>\nRA-4500 STRUCTURAL DESIGN REQUIREMENTS
RA-4600 ELECTRICAL DESIGN REQUIREMENTS <\/td>\n<\/tr>\n
209<\/td>\nRA-4700 MAINTENANCE CRITERIA
ARTICLE RA-5000 INSPECTION, RATING, AND TESTING
RA-5100 RATING
RA-5200 TESTING <\/td>\n<\/tr>\n
211<\/td>\nRA-5300 NONDESTRUCTIVE EXAMINATION
ARTICLE RA-6000 FABRICATION AND INSTALLATION
RA-6100 WELDING AND BRAZING <\/td>\n<\/tr>\n
212<\/td>\nRA-6200 CLEANING, FINISHING, AND COATING
RA-6300 INSTALLATION
ARTICLE RA-7000 PACKAGING, SHIPPING, STORAGE, AND HANDLING
RA-7100 GENERAL REQUIREMENTS
RA-7200 PACKAGING
RA-7300 SHIPPING
RA-7400 STORAGE
RA-7500 HANDLING AND RIGGING <\/td>\n<\/tr>\n
213<\/td>\nRA-7600 ASSEMBLY, ERECTION, AND START-UP
ARTICLE RA-8000 QUALITY ASSURANCE
RA-8100 GENERAL
ARTICLE RA-9000 NAMEPLATES, STAMPING, AND RECORDS
RA-9100 GENERAL REQUIREMENTS
RA-9200 NAMEPLATES AND STAMPING
RA-9300 DATA REPORTS <\/td>\n<\/tr>\n
214<\/td>\nForms
Form RA-1 Manufacturer’s Data Report for Section RA Non-ASME Nuclear Vessels (U.S. Customary) <\/td>\n<\/tr>\n
216<\/td>\nForm RA-M1 Manufacturer’s Data Report for Section RA Non-ASME Nuclear Vessels (SI) <\/td>\n<\/tr>\n
218<\/td>\nForm RA-2 Centrifugal Compressor Test Record <\/td>\n<\/tr>\n
219<\/td>\nForm RA-2a Centrifugal Compressor Oil Pump Pressure Test <\/td>\n<\/tr>\n
220<\/td>\nForm RA-2b Centrifugal Compressor Pressure Test Record <\/td>\n<\/tr>\n
221<\/td>\nForm RA-3 Reciprocating Scroll\/Screw Compressor Test Record <\/td>\n<\/tr>\n
222<\/td>\nForm RA-3a Reciprocating Scroll\/Screw Compressor Pressure Test Record <\/td>\n<\/tr>\n
223<\/td>\nForm RA-4 Electrical Test Record — Controls and Control Panels <\/td>\n<\/tr>\n
224<\/td>\nForm RA-5 Performance Test Record (U.S. Customary) <\/td>\n<\/tr>\n
226<\/td>\nForm RA-M5 Performance Test Record (SI) <\/td>\n<\/tr>\n
228<\/td>\nMANDATORY APPENDIX RA-I PERFORMANCE TESTING OF CHILLED WATER REFRIGERATION UNIT (U.S. CUSTOMARY)
ARTICLE RA-I-1000 GENERAL
RA-I-1100 PARAGRAPH A4.1.1
RA-I-1200 EFFECT OF FOULING FACTORS
RA-I-1300 PARAGRAPH A7.3.1
RA-I-1400 PARAGRAPH A7.3.3
RA-I-1500 PARAGRAPH A8.1.1
RA-I-1600 POWER INPUT
RA-I-1700 REFRIGERATION MACHINES EQUIPPED WITH SUBCOOLERS <\/td>\n<\/tr>\n
229<\/td>\nTable RA-I-1100-1
Table RA-I-1200-1
Table RA-I-1300-1 <\/td>\n<\/tr>\n
230<\/td>\nTable RA-I-1500-1 <\/td>\n<\/tr>\n
231<\/td>\nMANDATORY APPENDIX RA-MI PERFORMANCE TESTING OF CHILLED WATER REFRIGERATION UNIT (SI)
ARTICLE RA-MI-1000
RA-MI-1100 PARAGRAPH A4.1.1
RA-MI-1200 EFFECT OF FOULING FACTOR
RA-MI-1300 PARAGRAPH A7.3.1
RA-MI-1400 PARAGRAPH A7.3.3
RA-MI-1500 PARAGRAPH A8.1.1
RA-MI-1600 POWER INPUT
RA-MI-1700 REFRIGERATION MACHINES EQUIPPED WITH SUBCOOLERS <\/td>\n<\/tr>\n
232<\/td>\nTable RA-MI-1100-1
Table RA-MI-1200-1
Table RA-MI-1300-1 <\/td>\n<\/tr>\n
233<\/td>\nTable RA-MI-1500-1 <\/td>\n<\/tr>\n
234<\/td>\nMANDATORY APPENDIX RA-II MANDATORY LIST OF INSTRUMENTATION FUNCTIONS AND CONTROL FUNCTIONS
Table RA-II-1000-1 Mandatory List of Instrumentation Functions and Control Functions <\/td>\n<\/tr>\n
235<\/td>\nNONMANDATORY APPENDIX RA-A DIVISION OF RESPONSIBILITY <\/td>\n<\/tr>\n
236<\/td>\nTable RA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
238<\/td>\nNONMANDATORY APPENDIX RA-B TYPICAL EXTERNAL INTERFACE DIAGRAMS
Figure RA-B-1000-1 Interface Points \u2014 Typical Two-Vessel Design <\/td>\n<\/tr>\n
239<\/td>\nSECTION CA CONDITIONING EQUIPMENT
ARTICLE CA-1000 INTRODUCTION
CA-1100 SCOPE
CA-1200 PURPOSE
CA-1300 APPLICABILITY
CA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
240<\/td>\nARTICLE CA-2000 REFERENCED DOCUMENTS
ARTICLE CA-3000 MATERIALS
CA-3100 MATERIAL SPECIFICATIONS <\/td>\n<\/tr>\n
241<\/td>\nCA-3200 WATER, STEAM, AND VOLATILE REFRIGERANT COIL MATERIALS
CA-3400 ELECTRIC HEATING COIL MATERIALS
CA-3500 CERTIFICATION OF MATERIALS <\/td>\n<\/tr>\n
242<\/td>\nARTICLE CA-4000 DESIGN
CA-4100 DESIGN CONDITIONS FOR WATER AND STEAM COILS <\/td>\n<\/tr>\n
243<\/td>\nTable CA-4122-1 Maximum Water Velocities in Water Coils <\/td>\n<\/tr>\n
244<\/td>\nCA-4200 DESIGN CONDITIONS FOR VOLATILE REFRIGERANT COILS <\/td>\n<\/tr>\n
245<\/td>\nCA-4300 DESIGN CONDITIONS FOR AIR WASHERS AND EVAPORATIVE COOLERS
CA-4400 DESIGN CONDITIONS FOR ELECTRIC HEATING COILS <\/td>\n<\/tr>\n
247<\/td>\nARTICLE CA-5000 INSPECTION AND TESTING
CA-5100 GENERAL REQUIREMENTS
CA-5200 TESTING OF WATER, STEAM, AND VOLATILE REFRIGERANT COILS <\/td>\n<\/tr>\n
248<\/td>\nCA-5400 TESTING OF ELECTRIC HEATING COILS <\/td>\n<\/tr>\n
249<\/td>\nCA-5500 TEST REPORTS
ARTICLE CA-6000 FABRICATION AND INSTALLATION
CA-6100 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
250<\/td>\nCA-6200 CLEANING, FINISHING, AND COATING
ARTICLE CA-7000 PACKAGING, SHIPPING, STORAGE, AND HANDLING
CA-7100 GENERAL REQUIREMENTS
CA-7200 PACKAGING <\/td>\n<\/tr>\n
251<\/td>\nCA-7300 SHIPPING
CA-7400 STORAGE
CA-7500 HANDLING
ARTICLE CA-8000 QUALITY ASSURANCE
CA-8100 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
252<\/td>\nARTICLE CA-9000 NAMEPLATES AND RECORDS
CA-9100 GENERAL REQUIREMENTS
CA-9200 COILS
CA-9300 INFORMATION ON NAMEPLATES
Table CA-8121-1 Lifetime Quality Assurance Records
Table CA-8121-2 Nonpermanent Quality Assurance Records <\/td>\n<\/tr>\n
253<\/td>\nCA-9400 NAMEPLATE VISIBILITY
CA-9500 DATA REPORTS
ARTICLE CA-10000 REPAIRS AND REPLACEMENTS
CA-10100 GENERAL <\/td>\n<\/tr>\n
256<\/td>\nNONMANDATORY APPENDIX CA-A DIVISION OF RESPONSIBILITY
Table CA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
257<\/td>\nNONMANDATORY APPENDIX CA-B DESIGN RECOMMENDATIONS
ARTICLE CA-B-1000 RECOMMENDED DESIGN CRITERIA FOR WATER, STEAM, AND VOLATILE REFRIGERANT COILS
CA-B-1100 SCOPE
CA-B-1200 GENERAL RECOMMENDATIONS <\/td>\n<\/tr>\n
258<\/td>\nSECTION FA MOISTURE SEPARATORS
ARTICLE FA-1000 INTRODUCTION
FA-1100 SCOPE
FA-1200 PURPOSE
FA-1300 APPLICABILITY
FA-1400 DEFINITIONS AND TERMS
ARTICLE FA-2000 REFERENCED DOCUMENTS
ARTICLE FA-3000 MATERIALS
FA-3100 ALLOWABLE MATERIALS
FA-3200 LIMITATIONS <\/td>\n<\/tr>\n
259<\/td>\nFA-3300 MATERIAL CERTIFICATION
ARTICLE FA-4000 DESIGN
FA-4100 GENERAL DESIGN
FA-4200 TECHNICAL REQUIREMENTS
FA-4300 STRUCTURAL REQUIREMENTS
ARTICLE FA-5000 INSPECTION AND TESTING
FA-5100 QUALIFICATION TESTS
Table FA-4100-1 Moisture Separator Performance Specifications <\/td>\n<\/tr>\n
260<\/td>\nFigure FA-4100-1 Typical Moisture Separation Configuration <\/td>\n<\/tr>\n
261<\/td>\nFA-5200 PRODUCTION INSPECTION AND TESTING
ARTICLE FA-6000 FABRICATION
FA-6100 REPAIRS
FA-6200 CLEANING
FA-6300 TOLERANCES
ARTICLE FA-7000 PACKAGING, SHIPPING, AND STORAGE
ARTICLE FA-8000 QUALITY ASSURANCE
FA-8100 RESPONSIBILITY
FA-8200 DOCUMENTATION <\/td>\n<\/tr>\n
262<\/td>\nFA-8300 CERTIFICATE OF CONFORMANCE
ARTICLE FA-9000 NAMEPLATES
FA-9100 MOISTURE SEPARATOR MARKING
FA-9200 PACKAGE MARKING <\/td>\n<\/tr>\n
263<\/td>\nNONMANDATORY APPENDIX FA-A DIVISION OF RESPONSIBILITY
Table FA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
264<\/td>\nSECTION FB MEDIUM EFFICIENCY FILTERS
ARTICLE FB-1000 INTRODUCTION
FB-1100 SCOPE
FB-1200 PURPOSE
FB-1300 APPLICABILITY
FB-1400 DEFINITIONS AND TERMS
ARTICLE FB-2000 REFERENCED DOCUMENTS
ARTICLE FB-3000 MATERIALS
FB-3100 ALLOWABLE MATERIALS <\/td>\n<\/tr>\n
265<\/td>\nFB-3200 SPECIAL LIMITATIONS OF MATERIALS
ARTICLE FB-4000 DESIGN
FB-4100 GENERAL DESIGN
FB-4200 DESIGN CRITERIA
FB-4300 STRUCTURAL REQUIREMENTS
ARTICLE FB-5000 INSPECTION AND TESTING
FB-5100 INSPECTION PLAN
FB-5200 QUALIFICATION TESTING <\/td>\n<\/tr>\n
266<\/td>\nARTICLE FB-6000 FABRICATION
FB-6100 GENERAL
FB-6200 MANUFACTURE AND ASSEMBLY
ARTICLE FB-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE ,AND HANDLING
FB-7100 GENERAL
ARTICLE FB-8000 QUALITY ASSURANCE
FB-8100 GENERAL
FB-8200 DOCUMENTATION
ARTICLE FB-9000 LABELS AND MARKING
FB-9100 FILTER MARKINGS <\/td>\n<\/tr>\n
267<\/td>\nFB-9200 PACKAGE MARKING <\/td>\n<\/tr>\n
268<\/td>\nNONMANDATORY APPENDIX FB-A DIVISION OF RESPONSIBILITY
Table FB-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
269<\/td>\nSECTION FC HEPA FILTERS
ARTICLE FC-1000 INTRODUCTION
FC-1100 SCOPE
FC-1200 PURPOSE
FC-1300 APPLICABILITY
FC-1400 DEFINITIONS AND TERMS
ARTICLE FC-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
270<\/td>\nARTICLE FC-3000 MATERIALS
FC-3100 ALLOWABLE MATERIALS <\/td>\n<\/tr>\n
271<\/td>\nFC-3200 SPECIAL LIMITATIONS OF MATERIALS
ARTICLE FC-4000 DESIGN
FC-4100 GENERAL DESIGN
Figure FC-4110-1 Type A, C, or D Metal-Cased, Gasket-Sealed Filter <\/td>\n<\/tr>\n
272<\/td>\nFigure FC-4110-2 Type A Wood Case Separator Filter
Figure FC-4110-3 Type B Minipleat Filter <\/td>\n<\/tr>\n
273<\/td>\nFigure FC-4110-4 Type C Separatorless Filter
Figure FC-4110-5 Type D Thread Separator Filter <\/td>\n<\/tr>\n
274<\/td>\nTable FC-4110-1 Nominal Sizes and Ratings <\/td>\n<\/tr>\n
275<\/td>\nFC-4200 PERFORMANCE REQUIREMENTS
Figure FC-4142-1 Gel Seal Filter Corner \u2014 Isometric <\/td>\n<\/tr>\n
276<\/td>\nFC-4300 SEISMIC QUALIFICATION
ARTICLE FC-5000 INSPECTION AND TESTING
FC-5100 QUALIFICATION TESTING
Table FC-5100-1 Test Groups and Sequence <\/td>\n<\/tr>\n
277<\/td>\nTable FC-5120-1 Acceptable Test
Table FC-5140-1 Test Conditions and Requirements <\/td>\n<\/tr>\n
278<\/td>\nFC-5200 INSPECTION
FC-5300 PRODUCTION TESTING
ARTICLE FC-6000 FABRICATION
FC-6100 GENERAL REQUIREMENTS
FC-6200 MANUFACTURE AND ASSEMBLY
FC-6300 WORKMANSHIP
ARTICLE FC-7000 PACKAGING, SHIPPING, AND STORAGE
ARTICLE FC-8000 QUALITY ASSURANCE
FC-8100 RESPONSIBILITY
FC-8200 CERTIFICATE OF CONFORMANCE <\/td>\n<\/tr>\n
279<\/td>\nARTICLE FC-9000 NAMEPLATES
FC-9100 FILTER MARKING
FC-9200 PACKAGE MARKING <\/td>\n<\/tr>\n
280<\/td>\nMANDATORY APPENDIX FC-I FILTER MEDIA: FIRE-RESISTANT, HIGH EFFICIENCY
ARTICLE FC-I-1000 SCOPE
ARTICLE FC-I-2000 REFERENCED DOCUMENTS
ARTICLE FC-I-3000 REQUIREMENTS
FC-I-3100 FORM AND SIZE <\/td>\n<\/tr>\n
281<\/td>\nFC-I-3200 PHYSICAL AND CHEMICAL <\/td>\n<\/tr>\n
282<\/td>\nFC-I-3300 WORKMANSHIP
ARTICLE FC-I-4000 INSPECTION AND TESTING
FC-I-4100 QUALIFICATION TESTING
FC-I-4200 TEST PROCEDURES <\/td>\n<\/tr>\n
283<\/td>\nFC-I-4300 PRODUCTION TESTING
ARTICLE FC-I-5000 QUALITY ASSURANCE PROVISIONS
FC-I-5100 RESPONSIBILITY FOR INSPECTION
ARTICLE FC-I-6000 PACKAGING AND SHIPPING
FC-I-6100 PACKAGING
FC-I-6200 SHIPPING <\/td>\n<\/tr>\n
284<\/td>\nTable FC-I-4330-1 Filter Media Qualification and Production Tests <\/td>\n<\/tr>\n
285<\/td>\nNONMANDATORY APPENDIX FC-A DIVISION OF RESPONSIBILITY
Table FC-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
286<\/td>\nSECTION FD TYPE II ADSORBER CELLS
ARTICLE FD-1000 INTRODUCTION
FD-1100 SCOPE
FD-1200 PURPOSE
FD-1300 APPLICABILITY
FD-1400 DEFINITIONS AND TERMS
ARTICLE FD-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
287<\/td>\nARTICLE FD-3000 MATERIALS
FD-3100 ALLOWABLE MATERIALS
FD-3200 LIMITS
FD-3300 CERTIFICATION OF MATERIALS
ARTICLE FD-4000 DESIGN
FD-4100 GENERAL DESIGN
FD-4200 TECHNICAL REQUIREMENTS <\/td>\n<\/tr>\n
288<\/td>\nFigure FD-4100-1 Type II Adsorber Cell <\/td>\n<\/tr>\n
289<\/td>\nFD-4300 STRUCTURAL REQUIREMENTS
ARTICLE FD-5000 INSPECTION AND TESTING
FD-5100 DIMENSIONAL INSPECTION <\/td>\n<\/tr>\n
290<\/td>\nFD-5200 WELDING INSPECTION
FD-5300 QUALIFICATION TESTS
ARTICLE FD-6000 FABRICATION
Table FD-5332-1 Detector Sensitivity for Leak Test <\/td>\n<\/tr>\n
291<\/td>\nFD-6100 DIMENSIONS AND TOLERANCES
FD-6200 WELDING AND BRAZING
FD-6300 FILLING
FD-6400 CLEANING
ARTICLE FD-7000 PACKAGING AND SHIPPING
FD-7100 PACKAGING
FD-7200 LOADING FOR SHIPMENT
FD-7300 STORAGE
FD-7400 CONTAINERS
Table FD-6100-1 Cell Dimensions and Tolerances <\/td>\n<\/tr>\n
292<\/td>\nARTICLE FD-8000 QUALITY ASSURANCE
FD-8100 DOCUMENTATION
ARTICLE FD-9000 NAMEPLATES AND CERTIFICATION
FD-9100 PERMANENT NAMEPLATE
FD-9200 FILLING LABEL <\/td>\n<\/tr>\n
293<\/td>\nMANDATORY APPENDIX FD-I CALCULATION OF RESIDENCE TIME OF ADSORBER CELLS
ARTICLE FD-I-1000 RESIDENCE TIME <\/td>\n<\/tr>\n
294<\/td>\nMANDATORY APPENDIX FD-II SAMPLE CANISTERS
ARTICLE FD-II-1000
FD-II-1100 SCOPE
FD-II-1200 APPLICABILITY
FD-II-1300 DEFINITIONS AND TERMS
ARTICLE FD-II-2000 GENERAL DESIGN
FD-II-2100 TECHNICAL REQUIREMENTS
ARTICLE FD-II-3000 FILLING METHOD QUALIFICATION <\/td>\n<\/tr>\n
295<\/td>\nFigure FD-II-2000-1 Examples of Sample Canister Configurations <\/td>\n<\/tr>\n
296<\/td>\nARTICLE FD-II-4000 NAMEPLATES
ARTICLE FD-II-5000 FILLING LABEL
Figure FD-II-2110-1 Detail of a Typical 2-in. Sample Canister <\/td>\n<\/tr>\n
297<\/td>\nNONMANDATORY APPENDIX FD-A DIVISION OF RESPONSIBILITY
Table FD-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
298<\/td>\nSECTION FE TYPE III ADSORBERS
ARTICLE FE-1000 INTRODUCTION
FE-1100 SCOPE
FE-1200 PURPOSE
FE-1300 APPLICABILITY
FE-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
299<\/td>\nARTICLE FE-2000 REFERENCED DOCUMENTS
ARTICLE FE-3000 MATERIALS
FE-3100 ALLOWABLE MATERIALS
ARTICLE FE-4000 DESIGN
FE-4100 GENERAL
FE-4200 TECHNICAL REQUIREMENTS <\/td>\n<\/tr>\n
300<\/td>\nFigure FE-4110-1 Horizontal Section of Type III Adsorber Bed <\/td>\n<\/tr>\n
301<\/td>\nFE-4300 ADSORBENT BED DETAILS
FE-4400 STRUCTURAL REQUIREMENTS <\/td>\n<\/tr>\n
302<\/td>\nFE-4500 ADSORBENT HANDLING SUBSYSTEMS
FE-4600 AUXILIARY SYSTEMS <\/td>\n<\/tr>\n
303<\/td>\nARTICLE FE-5000 INSPECTION AND TESTING
FE-5100 GENERAL <\/td>\n<\/tr>\n
304<\/td>\nFE-5200 VISUAL INSPECTION
FE-5300 DIMENSIONAL INSPECTION
FE-5400 WELDING INSPECTION
FE-5500 FABRICATION TOLERANCES
FE-5600 DESIGN QUALIFICATION
FE-5700 ACCEPTANCE TESTS
ARTICLE FE-6000 FABRICATION AND INSTALLATION
FE-6100 GENERAL
FE-6200 WELDING
FE-6300 CLEANING <\/td>\n<\/tr>\n
305<\/td>\nFE-6400 CONSTRUCTION AND INSTALLATION
FE-6500 REPAIRS
ARTICLE FE-7000 PACKAGING AND SHIPPING
FE-7100 TYPE III ADSORBERS
FE-7200 ADSORBENT MATERIALS
ARTICLE FE-8000 QUALITY ASSURANCE
FE-8100 GENERAL
FE-8200 INSPECTION REPORTS AND DOCUMENTATION
ARTICLE FE-9000 NAMEPLATES
FE-9100 PERMANENT NAMEPLATES
FE-9200 FILLING LABEL <\/td>\n<\/tr>\n
306<\/td>\nMANDATORY APPENDIX FE-I RESIDENCE TIME CALCULATION
ARTICLE FE-I-1000 CALCULATION OF RESIDENCE TIME OF ADSORBERS <\/td>\n<\/tr>\n
307<\/td>\nMANDATORY APPENDIX FE-II SCREEN WAVINESS INSPECTION TEST
ARTICLE FE-II-1000 SCREEN WAVINESS
ARTICLE FE-II-2000 PROCEDURE
ARTICLE FE-II-3000 ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
308<\/td>\nMANDATORY APPENDIX FE-III ADSORBER FILLING QUALIFICATION TEST PROCEDURE
ARTICLE FE-III-1000 SCOPE
ARTICLE FE-III-2000 PURPOSE
ARTICLE FE-III-3000
ARTICLE FE-III-4000 PROCEDURE
FE-III-4100 ADSORBENT CHARACTERISTICS
FE-III-4200 PACKING DENSITY
FE-III-4300 ADSORBENT LOSSES <\/td>\n<\/tr>\n
309<\/td>\nARTICLE FE-III-5000 QUALIFICATION REPORTS
ARTICLE FE-III-6000 ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
310<\/td>\nMANDATORY APPENDIX FE-IV TYPE III ADSORBER QUALIFICATION TEST PROCEDURE
ARTICLE FE-IV-1000 SCOPE
ARTICLE FE-IV-2000 PURPOSE
ARTICLE FE-IV-3000 THEORY <\/td>\n<\/tr>\n
311<\/td>\nARTICLE FE-IV-4000 EXAMPLE
FE-IV-4100 APPARATUS
FE-IV-4200 TEST PROCEDURE
Figure FE-IV-3000-1 <\/td>\n<\/tr>\n
312<\/td>\nFE-IV-4300 RH MEASUREMENT
FE-IV-4400 RH BREAKTHROUGH
FE-IV-4500 ADSORBENT SAMPLING
FE-IV-4600 MOISTURE CONTENT
Figure FE-IV-4100-1 <\/td>\n<\/tr>\n
313<\/td>\nMANDATORY APPENDIX FE-V SAMPLE CANISTERS
ARTICLE FE-V-1000
FE-V-1100 SCOPE
FE-V-1200 APPLICABILITY
FE-V-1300 DEFINITIONS AND TERMS
ARTICLE FE-V-2000 GENERAL DESIGN
FE-V-2100 TECHNICAL REQUIREMENTS
ARTICLE FE-V-3000 FILLING METHOD QUALIFICATION <\/td>\n<\/tr>\n
314<\/td>\nARTICLE FE-V-4000 NAMEPLATES
ARTICLE FE-V-5000 FILLING LABEL <\/td>\n<\/tr>\n
315<\/td>\nNONMANDATORY APPENDIX FE-A VISUAL INSPECTION RECOMMENDATIONS FOR TYPE III ADSORBERS
ARTICLE FE-A-1000 GENERAL
FE-A-1100 ADSORBER SECTIONS
FE-A-1200 ADSORBER ASSEMBLY
FE-A-1300 ADSORBER SERVICE SYSTEMS
FE-A-1400 INSPECTION OPENINGS
FE-A-1500 LABELING <\/td>\n<\/tr>\n
316<\/td>\nNONMANDATORY APPENDIX FE-B DIVISION OF RESPONSIBILITY
Table FE-B-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
317<\/td>\nSECTION FF ADSORBENT MEDIA
ARTICLE FF-1000 INTRODUCTION
FF-1100 SCOPE
FF-1200 PURPOSE
FF-1300 APPLICABILITY
FF-1400 DEFINITIONS AND TERMS
ARTICLE FF-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
318<\/td>\nARTICLE FF-3000 MATERIALS
ARTICLE FF-4000 DESIGN
FF-4100 GENERAL DESIGN
FF-4200 ADSORBENT DEGRADATION
ARTICLE FF-5000 INSPECTION AND TESTING <\/td>\n<\/tr>\n
319<\/td>\nFF-5100 PHYSICAL TESTING
FF-5200 RADIOACTIVE TESTING
FF-5300 ACCEPTABLE ASTM STANDARDS
ARTICLE FF-6000 FABRICATION
ARTICLE FF-7000 PACKAGING AND SHIPPING
FF-7100 PROTECTION OF ADSORBENT MEDIA <\/td>\n<\/tr>\n
320<\/td>\nFF-7200 STORAGE
FF-7300 CONTAINERS
ARTICLE FF-8000 QUALITY ASSURANCE
FF-8100 DOCUMENTATION
ARTICLE FF-9000 NAMEPLATE AND CERTIFICATION <\/td>\n<\/tr>\n
321<\/td>\nNONMANDATORY APPENDIX FF-A DIVISION OF RESPONSIBILITY
Table FF-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
322<\/td>\nSECTION FG MOUNTING FRAMES FOR AIR-CLEANING EQUIPMENT
ARTICLE FG-1000 INTRODUCTION
FG-1100 SCOPE
FG-1200 LIMITATIONS
FG-1300 PURPOSE
FG-1400 RESPONSIBILITY
ARTICLE FG-2000 REFERENCED DOCUMENTS
ARTICLE FG-3000 MATERIALS
FG-3100 ALLOWABLE MATERIALS
FG-3200 MATERIAL LIMITATIONS
ARTICLE FG-4000 DESIGN
FG-4100 GENERAL DESIGN <\/td>\n<\/tr>\n
323<\/td>\nFigure FG-4110-1 Typical Filter Mounting Frame <\/td>\n<\/tr>\n
324<\/td>\nFigure FG-4120-1 Typical Type II Adsorber Mounting Frame <\/td>\n<\/tr>\n
325<\/td>\nFigure FG-4140-1 Typical Moisture Separator Mounting Frame <\/td>\n<\/tr>\n
326<\/td>\nFG-4200 STRUCTURAL REQUIREMENTS
FG-4300 STRUCTURAL DESIGN ANALYSIS <\/td>\n<\/tr>\n
327<\/td>\nARTICLE FG-5000 INSPECTION AND TESTING
FG-5100 DIMENSIONAL INSPECTION
FG-5200 ALIGNMENT AND SURFACE FINISH FOR HEPA FILTER AND TYPE II ADSORBER CELL MOUNTING FRAMES <\/td>\n<\/tr>\n
328<\/td>\nFG-5300 ALIGNMENT AND SURFACE FINISH FOR MEDIUM EFFICIENCY FILTER AND MOISTURE SEPARATOR MOUNTING FRAMES
FG-5400 WELD INSPECTION
FG-5500 COATING INSPECTION
ARTICLE FG-6000 FABRICATION
FG-6100 GENERAL
FG-6200 WELDING
FG-6300 CLAMPING DEVICES
FG-6400 CLEANING
FG-6500 COATING
ARTICLE FG-7000 PACKAGING AND SHIPPING <\/td>\n<\/tr>\n
329<\/td>\nARTICLE FG-8000 QUALITY ASSURANCE
ARTICLE FG-9000 NAMEPLATES <\/td>\n<\/tr>\n
330<\/td>\nNONMANDATORY APPENDIX FG-A DIVISION OF RESPONSIBILITY <\/td>\n<\/tr>\n
331<\/td>\nTable FG-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
333<\/td>\nSECTION FH OTHER ADSORBERS
ARTICLE FH-1000 INTRODUCTION
FH-1100 SCOPE
FH-1200 PURPOSE
FH-1300 APPLICABILITY
FH-1400 DEFINITIONS AND TERMS
ARTICLE FH-2000 REFERENCED DOCUMENTS
ARTICLE FH-3000 MATERIALS
FH-3100 ALLOWABLE MATERIALS
FH-3200 LIMITS
FH-3300 CERTIFICATION OF MATERIALS <\/td>\n<\/tr>\n
334<\/td>\nARTICLE FH-4000 DESIGN
FH-4100 GENERAL DESIGN
Figure FH-4100-1 Type IV \u201cV\u201d Adsorbers Model (Fluid Seal Version) <\/td>\n<\/tr>\n
335<\/td>\nFH-4200 TECHNICAL REQUIREMENTS
Figure FH-4100-2 Type IV \u201cV\u201d Bed Adsorbers Model (Gasketed Version) <\/td>\n<\/tr>\n
336<\/td>\nFigure FH-4100-3 Type IV \u201cV\u201d Adsorbers Model, Exploded View <\/td>\n<\/tr>\n
337<\/td>\nFH-4300 STRUCTURAL REQUIREMENTS
Figure FH-4100-4 Type IV \u201cU\u201d Bed Adsorbers Model (Gasketed Version) <\/td>\n<\/tr>\n
338<\/td>\nARTICLE FH-5000 INSPECTION AND TESTING
FH-5100 DIMENSIONAL INSPECTION
FH-5200 WELDING INSPECTION
FH-5300 QUALIFICATION TESTS
FH-5400 ACCEPTANCE TESTS <\/td>\n<\/tr>\n
339<\/td>\nARTICLE FH-6000 FABRICATION
FH-6100 DIMENSIONS AND TOLERANCES
FH-6200 WELDING
FH-6300 FILLING
FH-6400 CLEANING
ARTICLE FH-7000 PACKAGING AND SHIPPING
FH-7100 PACKAGING
FH-7200 LOADING FOR SHIPMENT
Table FH-6100-1 Dimensional Requirements <\/td>\n<\/tr>\n
340<\/td>\nFH-7300 STORAGE
FH-7400 CONTAINERS
ARTICLE FH-8000 QUALITY ASSURANCE
FH-8100 DOCUMENTATION
ARTICLE FH-9000 NAMEPLATES AND CERTIFICATION
FH-9100 PERMANENT NAMEPLATE
FH-9200 FILLING LABEL <\/td>\n<\/tr>\n
341<\/td>\nNONMANDATORY APPENDIX FH-A DIVISION OF RESPONSIBILITY
Table FH-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
342<\/td>\nSECTION FI METAL MEDIA FILTERS <\/td>\n<\/tr>\n
343<\/td>\nSECTION FJ LOW EFFICIENCY FILTERS
ARTICLE FJ-1000 INTRODUCTION
FJ-1100 SCOPE
FJ-1200 PURPOSE
FJ-1300 APPLICABILITY
FJ-1400 DEFINITIONS AND TERMS
ARTICLE FJ-2000 REFERENCED DOCUMENTS
ARTICLE FJ-3000 MATERIALS
FJ-3100 ALLOWABLE MATERIALS <\/td>\n<\/tr>\n
344<\/td>\nFJ-3200 SPECIAL LIMITATIONS OF MATERIALS
ARTICLE FJ-4000 DESIGN
FJ-4100 GENERAL DESIGN
FJ-4200 DESIGN CRITERIA
FJ-4300 STRUCTURAL REQUIREMENTS
ARTICLE FJ-5000 INSPECTION AND TESTING
FJ-5100 INSPECTION PLAN
FJ-5200 QUALIFICATION TESTING <\/td>\n<\/tr>\n
345<\/td>\nARTICLE FJ-6000 FABRICATION
FJ-6100 GENERAL
FJ-6200 MANUFACTURE AND ASSEMBLY
ARTICLE FJ-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
FJ-7100 GENERAL
ARTICLE FJ-8000 QUALITY ASSURANCE
FJ-8100 GENERAL
FJ-8200 DOCUMENTATION
ARTICLE FJ-9000 LABELS AND MARKINGS
FJ-9100 FILTER MARKINGS <\/td>\n<\/tr>\n
346<\/td>\nFJ-9200 PACKAGE MARKINGS <\/td>\n<\/tr>\n
347<\/td>\nNONMANDATORY APPENDIX FJ-A DIVISION OF RESPONSIBILITY
Table FJ-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
348<\/td>\nSECTION FK SPECIAL HEPA FILTERS
ARTICLE FK-1000 INTRODUCTION
FK-1100 SCOPE
FK-1200 PURPOSE
FK-1300 APPLICABILITY
FK-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
349<\/td>\nARTICLE FK-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
350<\/td>\nARTICLE FK-3000 MATERIALS
FK-3100 ALLOWABLE MATERIALS <\/td>\n<\/tr>\n
351<\/td>\nFK-3200 GENERAL MATERIAL REQUIREMENTS
ARTICLE FK-4000 DESIGN
FK-4100 GENERAL DESIGN
Table FK-4111-1 Type 1 Radial Flow HEPA Filter \u2014 Nominal Rating <\/td>\n<\/tr>\n
352<\/td>\nFigure FK-4111-1 Type 1 Radial Flow HEPA Filter (Internal Gasket), Midsection View <\/td>\n<\/tr>\n
353<\/td>\nFigure FK-4111-2 Type 1 Radial Flow HEPA Filter (Internal Gelatinous Seal), Midsection View <\/td>\n<\/tr>\n
354<\/td>\nFigure FK-4111-3 Type 1 Radial Flow HEPA Filter (External Gasket), Midsection View <\/td>\n<\/tr>\n
355<\/td>\nFigure FK-4111-4 Type 1 Radial Flow HEPA Filter (External Gelatinous Seal), Midsection View <\/td>\n<\/tr>\n
356<\/td>\nFigure FK-4112-1 Type 2 Axial Flow Circular HEPA Filters <\/td>\n<\/tr>\n
357<\/td>\nFK-4200 PERFORMANCE REQUIREMENTS
FK-4300 STRUCTURAL REQUIREMENTS
ARTICLE FK-5000 QUALIFICATION, INSPECTION, AND PRODUCTION TESTING
FK-5100 QUALIFICATION TESTING FOR TYPE 1 RADIAL FLOW FILTERS
Table FK-4112-1 Type 2 Axial Flow Circular HEPA Filter \u2014 Nominal Rating <\/td>\n<\/tr>\n
358<\/td>\nTable FK-4200-1 Performance Requirements <\/td>\n<\/tr>\n
359<\/td>\nTable FK-5100-1 Test Groups and Sequence \u2014 Type 1 Radial Flow HEPA Filters
Table FK-5140-1 Test Conditions and Requirements <\/td>\n<\/tr>\n
360<\/td>\nFK-5200 QUALIFICATION TESTING FOR TYPE 2 AXIAL FLOW CIRCULAR FILTERS
Table FK-5200-1 Test Groups and Sequence \u2014 Type 2 Axial Flow Circular HEPA Filters <\/td>\n<\/tr>\n
362<\/td>\nFK-5400 QUALIFICATION TESTING FOR TYPE 4 AXIAL FLOW RECTANGULAR FILTERS <\/td>\n<\/tr>\n
363<\/td>\nTable FK-5400-1 Test Groups and Sequence \u2014 Type 4 Axial Flow Rectangular HEPA Filters <\/td>\n<\/tr>\n
364<\/td>\nFK-5500 INSPECTION
FK-5600 PRODUCTION TESTING
ARTICLE FK-6000 FABRICATION
FK-6100 GENERAL
FK-6200 MANUFACTURE AND ASSEMBLY <\/td>\n<\/tr>\n
365<\/td>\nFK-6300 WORKMANSHIP
ARTICLE FK-7000 PACKAGING, SHIPPING, AND STORAGE
ARTICLE FK-8000 QUALITY ASSURANCE
FK-8100 RESPONSIBILITY
FK-8200 CERTIFICATE OF CONFORMANCE
ARTICLE FK-9000 NAMEPLATES
FK-9100 FILTER MARKING
FK-9200 PACKAGE MARKING <\/td>\n<\/tr>\n
366<\/td>\nNONMANDATORY APPENDIX FK-A DETERMINATION OF HEPA FILTER SERVICE LIFE <\/td>\n<\/tr>\n
367<\/td>\nNONMANDATORY APPENDIX FK-B DIVISION OF RESPONSIBILITY
Table FK-B-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
368<\/td>\nSECTION FL DEEP BED SAND FILTERS
ARTICLE FL-1000 INTRODUCTION
FL-1100 SCOPE
FL-1200 PURPOSE
FL-1300 APPLICABILITY
FL-1400 DEFINITIONS AND TERMS
ARTICLE FL-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
369<\/td>\nARTICLE FL-3000 MATERIALS
FL-3100 ALLOWABLE MATERIALS <\/td>\n<\/tr>\n
370<\/td>\nFL-3200 SPECIAL LIMITATIONS OF MATERIALS
FL-3300 CERTIFICATION OF MATERIALS
ARTICLE FL-4000 DESIGN
FL-4100 GENERAL DEEP BED SAND FILTER DESIGN
FL-4200 DESIGN CRITERIA <\/td>\n<\/tr>\n
371<\/td>\nFigure FL-4120-1 Typical DBS Filter Cross Section, DOE-HDBK-1169-2003 <\/td>\n<\/tr>\n
372<\/td>\nFL-4300 STRUCTURAL REQUIREMENTS
ARTICLE FL-5000 INSPECTION AND TESTING
FL-5100 ACCEPTANCE TESTS <\/td>\n<\/tr>\n
373<\/td>\nFL-5200 INSPECTION PLAN <\/td>\n<\/tr>\n
374<\/td>\nFL-5300 QUALIFICATION AND VERIFICATION TESTING <\/td>\n<\/tr>\n
375<\/td>\nARTICLE FL-6000 FABRICATION\/FIELD CONSTRUCTION
FL-6100 GENERAL
FL-6200 FABRICATION AND ASSEMBLY
FL-6300 INSTALLATION
FL-6400 TOLERANCES <\/td>\n<\/tr>\n
376<\/td>\nARTICLE FL-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
FL-7100 GENERAL REQUIREMENTS
FL-7200 FILTER MEDIA
ARTICLE FL-8000 QUALITY ASSURANCE
FL-8100 GENERAL
FL-8200 IDENTIFICATION AND COMPLETED MATERIAL
ARTICLE FL-9000 LABELS AND MARKINGS
FL-9100 DEEP BED SAND FILTER MARKINGS
FL-9200 PACKAGE MARKING
FL-9300 FILTER MEDIA <\/td>\n<\/tr>\n
377<\/td>\nMANDATORY APPENDIX FL-I AIR-AEROSOL MIXING TEST PROCEDURAL GUIDELINES
ARTICLE FL-I-1000 GENERAL
FL-I-1100 SYSTEM TEST
FL-I-1200 SUMMARY OF METHOD
FL-I-1300 INJECTION PORT SELECTION CRITERIA
FL-I-1400 DOWNSTREAM SAMPLE PORT SELECTION CRITERIA
ARTICLE FL-I-2000 PREREQUISITES
ARTICLE FL-I-3000 TEST EQUIPMENT
ARTICLE FL-I-4000 PROCEDURAL GUIDELINES
FL-I-4100 GENERAL <\/td>\n<\/tr>\n
378<\/td>\nFL-I-4200 DOWNSTREAM SAMPLE PORT QUALIFICATION <\/td>\n<\/tr>\n
379<\/td>\nMANDATORY APPENDIX FL-II DEEP BED SAND FILTER IN-PLACE LEAK TEST PROCEDURAL GUIDELINES
ARTICLE FL-II-1000 GENERAL
FL-II-1100 SUMMARY OF METHOD
ARTICLE FL-II-2000 PREREQUISITES
ARTICLE FL-II-3000 TEST EQUIPMENT AND PROCEDURES
FL-II-3100 TEST EQUIPMENT
FL-II-3200 PROCEDURAL GUIDELINES <\/td>\n<\/tr>\n
380<\/td>\nNONMANDATORY APPENDIX FL-A DIVISION OF RESPONSIBILITY
Table FL-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
381<\/td>\nNONMANDATORY APPENDIX FL-B GUIDELINES FOR DEEP BED SAND FILTERS
ARTICLE FL-B-1000 DBS FILTER MATERIAL SELECTION
FL-B-1100 GENERAL
FL-B-1200 FILTER MEDIA
FL-B-1300 DBS FILTER STRUCTURE AND DISTRIBUTION CHANNELS
ARTICLE FL-B-2000 DESIGN GUIDELINES
FL-B-2100 GENERAL <\/td>\n<\/tr>\n
382<\/td>\nFL-B-2200 DESIGN ATTRIBUTES
FL-B-2300 EXAMPLES OF SUPPORT STRUCTURE ARRANGEMENT
FL-B-2400 END OF LIFE
ARTICLE FL-B-3000 INSPECTION AND TESTING GUIDELINES
FL-B-3100 FILTER MEDIA ACCEPTANCE TEST PROCEDURES <\/td>\n<\/tr>\n
383<\/td>\nFigure FL-B-2300-1 Sand-Filter Cross Sections <\/td>\n<\/tr>\n
385<\/td>\nFL-B-3200 SEISMIC
FL-B-3300 SMOKE LOADING
ARTICLE FL-B-4000 FABRICATION GUIDELINES
FL-B-4100 GENERAL
FL-B-4200 FILTER MEDIA PLACEMENT <\/td>\n<\/tr>\n
387<\/td>\nSECTION FM HIGH-STRENGTH HEPA FILTERS <\/td>\n<\/tr>\n
388<\/td>\nSECTION IA INSTRUMENTATION AND CONTROLS
ARTICLE IA-1000 INTRODUCTION
IA-1100 SCOPE
IA-1200 PURPOSE
IA-1300 APPLICABILITY
IA-1400 DEFINITIONS AND TERMS
ARTICLE IA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
389<\/td>\nARTICLE IA-3000 MATERIALS
IA-3100 MATERIALS OF CONSTRUCTION
IA-3200 NONPERMISSIBLE MATERIALS <\/td>\n<\/tr>\n
390<\/td>\nIA-3300 RESTRICTED MATERIALS
IA-3400 CERTIFICATION OF MATERIAL
ARTICLE IA-4000 DESIGN REQUIREMENTS
IA-4100 GENERAL DESIGN
Table IA-3100-1 Allowable Materials <\/td>\n<\/tr>\n
391<\/td>\nIA-4200 SINGLE-FAILURE CRITERIA
IA-4300 SEPARATION CRITERIA
IA-4400 QUALIFICATION OF EQUIPMENT <\/td>\n<\/tr>\n
392<\/td>\nIA-4500 PANELS <\/td>\n<\/tr>\n
393<\/td>\nIA-4600 MOUNTED INSTRUMENTS AND SENSORS
IA-4700 INTERCONNECTING WIRING FOR SKID-MOUNTED COMPONENTS
IA-4800 INSTRUMENT-SENSING LINES AND FIELD-INSTALLED TUBING <\/td>\n<\/tr>\n
394<\/td>\nIA-4900 INSTRUMENT SETPOINTS
ARTICLE IA-5000 INSPECTION AND TESTING
IA-5100 GENERAL
IA-5200 VISUAL INSPECTION
IA-5300 CALIBRATION AND TESTING <\/td>\n<\/tr>\n
395<\/td>\nARTICLE IA-6000 PANEL FABRICATION AND ASSEMBLY
IA-6100 GENERAL REQUIREMENTS
IA-6200 FABRICATION PROCESS
IA-6300 WELDING
IA-6400 BRAZING
IA-6500 CLEANING AND COATING
IA-6600 INSTALLATION REQUIREMENTS: HANDLING AND RIGGING
IA-6700 MATERIAL IDENTIFICATION
ARTICLE IA-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
IA-7100 GENERAL REQUIREMENTS
IA-7200 PACKAGING <\/td>\n<\/tr>\n
396<\/td>\nIA-7300 SHIPPING
IA-7400 RECEIVING
IA-7500 STORAGE
ARTICLE IA-8000 QUALITY ASSURANCE
IA-8100 GENERAL
IA-8200 TEST REPORTS AND DATA
ARTICLE IA-9000 NAMEPLATES
IA-9100 GENERAL
IA-9200 REQUIREMENTS
IA-9300 NAMEPLATE SPECIFICATIONS <\/td>\n<\/tr>\n
398<\/td>\nNONMANDATORY APPENDIX IA-A DIVISION OF RESPONSIBILITY
Table IA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
399<\/td>\nNONMANDATORY APPENDIX IA-B SAMPLE CHECKLIST FOR VISUAL EXAMINATION OF CONTROL PANELS\/ENCLOSURES, INSTRUMENTS, AND CONTROL DEVICES
Table IA-B-1000-1 Sample Checklist for Visual Examination of Control Panels\/Enclosures, Instruments, and Control Devices <\/td>\n<\/tr>\n
400<\/td>\nNONMANDATORY APPENDIX IA-C INSTRUMENTATION FOR NUCLEAR AIR AND GAS TREATMENT SYSTEMS
ARTICLE IA-C-1000
IA-C-1100 PURPOSE
IA-C-1200 FUNCTIONAL DESIGN <\/td>\n<\/tr>\n
401<\/td>\nTable IA-C-1220-1 Instrumentation for Nuclear Air and Gas Treatment Systems <\/td>\n<\/tr>\n
402<\/td>\nDivision III Process Gas Treatment <\/td>\n<\/tr>\n
403<\/td>\nSECTION GA HEAT EXCHANGERS
ARTICLE GA-1000 INTRODUCTION
GA-1100 SCOPE
GA-1200 PURPOSE
GA-1300 APPLICABILITY
GA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
404<\/td>\nARTICLE GA-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
405<\/td>\nARTICLE GA-3000 MATERIALS
GA-3100 GENERAL REQUIREMENTS
GA-3200 MATERIALS FOR HEAT EXCHANGERS
GA-3300 CERTIFICATION OF MATERIALS
ARTICLE GA-4000 DESIGN
GA-4100 DESIGN SPECIFICATIONS <\/td>\n<\/tr>\n
406<\/td>\nGA-4200 STRUCTURAL REQUIREMENTS FOR HEAT EXCHANGERS <\/td>\n<\/tr>\n
407<\/td>\nGA-4300 DESIGN CONDITIONS FOR SHELL-AND-TUBE HEAT EXCHANGERS
Figure GA-4311-1 Typical Shell-and-Tube Heat Exchanger <\/td>\n<\/tr>\n
408<\/td>\nGA-4400 DESIGN CONDITIONS FOR GASKETED PLATE AND FRAME HEAT EXCHANGERS <\/td>\n<\/tr>\n
409<\/td>\nFigure GA-4411-1 Gasketed Plate and Frame Heat Exchanger <\/td>\n<\/tr>\n
410<\/td>\nGA-4500 DESIGN CONDITIONS FOR BRAZED-PLATE HEAT EXCHANGERS <\/td>\n<\/tr>\n
411<\/td>\nGA-4600 DESIGN CONDITIONS FOR WELDED-PLATE HEAT EXCHANGERS
Figure GA-4510-1 Brazed-Plate Heat Exchanger <\/td>\n<\/tr>\n
412<\/td>\nFigure GA-4611-1 Typical Welded-Plate Heat Exchanger <\/td>\n<\/tr>\n
413<\/td>\nARTICLE GA-5000 INSPECTION AND TESTING
GA-5100 GENERAL REQUIREMENTS
GA-5200 TESTING
GA-5300 NONDESTRUCTIVE EXAMINATION <\/td>\n<\/tr>\n
414<\/td>\nARTICLE GA-6000 FABRICATION AND INSTALLATION
GA-6100 GENERAL REQUIREMENTS
GA-6200 WELDING
GA-6300 BRAZING
GA-6400 MECHANICAL JOINING
GA-6500 CLEANING, FINISHING, AND COATING <\/td>\n<\/tr>\n
415<\/td>\nGA-6600 INSTALLATION
ARTICLE GA-7000 PACKAGING, SHIPPING, HANDLING, AND STORAGE
GA-7100 GENERAL REQUIREMENTS
GA-7200 PACKAGING <\/td>\n<\/tr>\n
416<\/td>\nGA-7300 SHIPPING
GA-7400 STORAGE <\/td>\n<\/tr>\n
417<\/td>\nGA-7500 HANDLING
ARTICLE GA-8000 QUALITY ASSURANCE
GA-8100 GENERAL REQUIREMENTS
GA-8200 DOCUMENTATION AND RETENTION <\/td>\n<\/tr>\n
418<\/td>\nARTICLE GA-9000 NAMEPLATES AND RECORDS
GA-9100 GENERAL REQUIREMENTS
GA-9200 HEAT EXCHANGERS
GA-9300 INFORMATION ON HEAT EXCHANGER NAMEPLATES
GA-9400 NAMEPLATE VISIBILITY
GA-9500 DATA REPORTS
ARTICLE GA-10000 REPAIRS AND REPLACEMENTS
GA-10100 GENERAL <\/td>\n<\/tr>\n
419<\/td>\nNONMANDATORY APPENDIX GA-A DIVISION OF RESPONSIBILITY
Table GA-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
420<\/td>\nNONMANDATORY APPENDIX GA-B DESIGN RECOMMENDATIONS FOR GASKETED PLATE AND FRAME HEAT EXCHANGERS
ARTICLE GA-B-1000 <\/td>\n<\/tr>\n
421<\/td>\nSECTION GB NOBLE GAS HOLD-UP EQUIPMENT <\/td>\n<\/tr>\n
422<\/td>\nSECTION GC GAS COMPRESSORS AND EXHAUSTERS
ARTICLE GC-1000 INTRODUCTION
GC-1100 SCOPE
GC-1200 PURPOSE
GC-1300 APPLICABILITY
GC-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
423<\/td>\nARTICLE GC-2000 REFERENCED DOCUMENTS
GC-2100 GENERAL
ARTICLE GC-3000 MATERIALS
GC-3100 GENERAL
GC-3200 SPECIAL LIMITATIONS ON MATERIALS
GC-3300 CERTIFICATION OF MATERIALS <\/td>\n<\/tr>\n
424<\/td>\nGC-3400 PURCHASED MATERIALS
GC-3500 DRIVER MATERIALS
ARTICLE GC-4000 DESIGN
GC-4100 DESIGN CONDITIONS <\/td>\n<\/tr>\n
425<\/td>\nGC-4200 SPECIFICATION DESIGN REQUIREMENTS <\/td>\n<\/tr>\n
426<\/td>\nGC-4300 CONSTRUCTION <\/td>\n<\/tr>\n
427<\/td>\nGC-4400 REPORTS AND CALCULATIONS <\/td>\n<\/tr>\n
428<\/td>\nARTICLE GC-5000 INSPECTION AND TESTING
GC-5100 COMPRESSOR INSPECTION AND TESTING <\/td>\n<\/tr>\n
429<\/td>\nGC-5200 DRIVER INSPECTION AND TESTING
ARTICLE GC-6000 FABRICATION AND INSTALLATION
GC-6100 GENERAL
GC-6200 FABRICATION
GC-6300 INSTALLATION
ARTICLE GC-7000 PACKAGING, SHIPPING, RECEIVING, AND STORAGE
GC-7100 GENERAL <\/td>\n<\/tr>\n
430<\/td>\nGC-7200 PACKAGING
GC-7300 SHIPPING
GC-7400 RECEIVING
GC-7500 STORAGE
ARTICLE GC-8000 QUALITY ASSURANCE
GC-8100 GENERAL
GC-8200 REQUIRED DOCUMENTATION
GC-8300 DRAWINGS AND DOCUMENTATION
ARTICLE GC-9000 NAMEPLATES AND OPERATING AND MAINTENANCE MANUALS
GC-9100 GENERAL
GC-9200 REQUIRED NAMEPLATE DATA <\/td>\n<\/tr>\n
431<\/td>\nGC-9300 ACCESSORIES
GC-9400 INSTALLATION, OPERATION, AND MAINTENANCE MANUALS <\/td>\n<\/tr>\n
432<\/td>\nMANDATORY APPENDIX GC-I SHAFT LEAKAGE
Table GC-I-1000-1 Maximum Permissible Shaft Leakage Rate, scfm, at Pressure Differential Between Operating and Ambient <\/td>\n<\/tr>\n
433<\/td>\nMANDATORY APPENDIX GC-II SYSTEM CONSIDERATIONS
ARTICLE GC-II-1000
GC-II-1100 SYSTEM CHARACTERISTICS
GC-II-1200 SYSTEM EFFECTS ON PERFORMANCE
GC-II-1300 EQUIPMENT AND SYSTEM MATCHING
GC-II-1400 SYSTEM CAPACITY CONTROL
GC-II-1500 MULTIPLE-UNIT SYSTEMS <\/td>\n<\/tr>\n
434<\/td>\nNONMANDATORY APPENDIX GC-A DIVISION OF RESPONSIBILITY <\/td>\n<\/tr>\n
435<\/td>\nTable GC-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
436<\/td>\nSECTION GD OTHER RADIONUCLIDE EQUIPMENT <\/td>\n<\/tr>\n
437<\/td>\nSECTION GE HYDROGEN RECOMBINERS AND IGNITERS
ARTICLE GE-1000 INTRODUCTION
GE-1100 SCOPE
GE-1200 PURPOSE
GE-1300 APPLICABILITY
GE-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
439<\/td>\nARTICLE GE-2000 REFERENCED DOCUMENTS
ARTICLE GE-3000 MATERIALS
GE-3100 GENERAL REQUIREMENTS
GE-3200 PAR <\/td>\n<\/tr>\n
440<\/td>\nGE-3300 IGNITER
ARTICLE GE-4000 DESIGN
GE-4100 GENERAL DESIGN
GE-4200 PAR
GE-4300 IGNITER <\/td>\n<\/tr>\n
441<\/td>\nGE-4400 STRUCTURAL REQUIREMENTS
ARTICLE GE-5000 INSPECTION AND TESTING
GE-5100 GENERAL
GE-5200 PERFORMANCE TESTING
Table GE-4410-1 Load Conditions \u2014 Housing and Support <\/td>\n<\/tr>\n
442<\/td>\nARTICLE GE-6000 FABRICATION AND INSTALLATION
GE-6100 GENERAL REQUIREMENTS
GE-6200 FABRICATION PROCESSES
GE-6300 WELDING
GE-6400 BRAZING
GE-6500 CLEANING AND COATING <\/td>\n<\/tr>\n
443<\/td>\nGE-6600 INSTALLATION REQUIREMENTS
ARTICLE GE-7000 PACKAGING, SHIPPING, RECEIVING, STORAGE, AND HANDLING
GE-7100 GENERAL REQUIREMENTS
GE-7200 PACKAGING
GE-7300 SHIPPING
GE-7400 STORAGE
GE-7500 RECEIVING
GE-7600 HANDLING AND RIGGING
GE-7700 ASSEMBLY, ERECTION, AND START-UP
ARTICLE GE-8000 QUALITY ASSURANCE
GE-8100 GENERAL REQUIREMENTS
GE-8200 IDENTIFICATION AND CONTROL OF ITEMS
GE-8300 DOCUMENTATION <\/td>\n<\/tr>\n
444<\/td>\nARTICLE GE-9000 NAMEPLATES AND CERTIFICATION
GE-9100 GENERAL REQUIREMENTS
GE-9200 INFORMATION ON NAMEPLATES
GE-9300 PAR NAMEPLATE LOCATION
GE-9400 DATA REPORTS
ARTICLE GE-10000 REPAIR AND REPLACEMENT OF COMPONENTS
GE-10100 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
445<\/td>\nNONMANDATORY APPENDIX GE-A DIVISION OF RESPONSIBILITY
Table GE-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
446<\/td>\nNONMANDATORY APPENDIX GE-B ILLUSTRATIONS OF COMPONENTS
Figure GE-B-1000-1 Typical PAR <\/td>\n<\/tr>\n
447<\/td>\nFigure GE-B-1000-2 Typical Igniter <\/td>\n<\/tr>\n
448<\/td>\nNONMANDATORY APPENDIX GE-C PERIODIC TESTING GUIDELINES
ARTICLE GE-C-1000 PERIODIC TESTING GUIDELINES
GE-C-1100 IN-SERVICE TEST REQUIREMENTS
GE-C-1200 STRUCTURAL INSPECTION <\/td>\n<\/tr>\n
449<\/td>\nSECTION GF GAS SAMPLING <\/td>\n<\/tr>\n
450<\/td>\nSECTION GG SCRUBBERS <\/td>\n<\/tr>\n
451<\/td>\nSECTION GH CYCLONES <\/td>\n<\/tr>\n
452<\/td>\nSECTION GI MEMBRANES <\/td>\n<\/tr>\n
453<\/td>\nSECTION GJ FILTERS <\/td>\n<\/tr>\n
454<\/td>\nSECTION GK MIST ELIMINATORS <\/td>\n<\/tr>\n
455<\/td>\nSECTION GL ELASTOMERIC PRECIPITATORS <\/td>\n<\/tr>\n
456<\/td>\nSECTION GM NOBLE GAS HOLD-UP MEDIA
ARTICLE GM-1000 INTRODUCTION
GM-1100 SCOPE
GM-1200 APPLICABILITY
GM-1300 DEFINITIONS AND TERMS
ARTICLE GM-2000 REFERENCED DOCUMENTS <\/td>\n<\/tr>\n
457<\/td>\nARTICLE GM-3000 MATERIALS
GM-3100 ACTIVATED CARBON
ARTICLE GM-4000 DESIGN
GM-4100 ACTIVATED CARBON
ARTICLE GM-5000 INSPECTION AND TESTING
GM-5100 INTRODUCTION
GM-5200 ACTIVATED CARBON FOR NOBLE GAS DELAY
ARTICLE GM-6000 FABRICATION
GM-6100 FABRICATION GUIDELINES
ARTICLE GM-7000 PACKAGING, SHIPPING, STORAGE, AND HANDLING
GM-7100 GENERAL REQUIREMENTS <\/td>\n<\/tr>\n
458<\/td>\nGM-7200 PROTECTION OF CARBON MEDIA
GM-7300 PACKAGING
GM-7400 STORAGE
GM-7500 HANDLING
GM-7600 SHIPPING
GM-7700 MARKING <\/td>\n<\/tr>\n
459<\/td>\nARTICLE GM-8000 QUALITY CONTROL
ARTICLE GM-9000 NAMEPLATE AND CERTIFICATION
GM-9100 NAMEPLATE, CERTIFICATION, AND SHIPPING INFORMATION <\/td>\n<\/tr>\n
460<\/td>\nNONMANDATORY APPENDIX GM-A DIVISION OF RESPONSIBILITY
Table GM-A-1000-1 Division of Responsibility <\/td>\n<\/tr>\n
461<\/td>\nNONMANDATORY APPENDIX GM-B DETERMINATION OF THE DYNAMIC ADSORPTION COEFFICIENT \u2014 RADIOACTIVE TRACER METHOD
ARTICLE GM-B-1000 INTRODUCTION
GM-B-1100 SCOPE
GM-B-1200 APPLICABLE DOCUMENTS
ARTICLE GM-B-2000 SUMMARY OF METHODS
ARTICLE GM-B-3000 APPARATUS AND EQUIPMENT
ARTICLE GM-B-4000 SAMPLE PREPARATION <\/td>\n<\/tr>\n
462<\/td>\nFigure GM-B-3000-1 Schematic of Noble Gas Delay Test Apparatus <\/td>\n<\/tr>\n
463<\/td>\nARTICLE GM-B-5000 PREPARATION OF APPARATUS
ARTICLE GM-B-6000 CALIBRATION
ARTICLE GM-B-7000 PROCEDURE
GM-B-7100 SYSTEM DEAD TIME DETERMINATION
GM-B-7200 DETERMINATION OF AVERAGE DELAY TIME
ARTICLE GM-B-8000 REPORT <\/td>\n<\/tr>\n
464<\/td>\nFigure GM-B-7100-1 Typical Traces for Measurement of Delay Time, Tdelay, for Dynamic K Determination <\/td>\n<\/tr>\n
465<\/td>\nDivision IV Testing Procedures <\/td>\n<\/tr>\n
466<\/td>\nSECTION TA FIELD TESTING OF AIR TREATMENT SYSTEMS
ARTICLE TA-1000 INTRODUCTION
TA-1100 SCOPE
TA-1200 PURPOSE
TA-1300 APPLICABILITY
TA-1400 DEFINITIONS AND TERMS <\/td>\n<\/tr>\n
467<\/td>\nARTICLE TA-2000 REFERENCED DOCUMENTS
ARTICLE TA-3000 GENERAL INSPECTION AND TEST REQUIREMENTS
TA-3100 GENERAL
TA-3200 TEST INSTRUMENTS <\/td>\n<\/tr>\n
468<\/td>\nTA-3300 ESTABLISHMENT OF REFERENCE VALUES
TA-3400 INSPECTIONS AND TEST REQUIREMENTS
Table TA-3200-1 Instrument Accuracy Requirements <\/td>\n<\/tr>\n
469<\/td>\nTA-3500 GENERIC TESTS <\/td>\n<\/tr>\n
470<\/td>\nTA-3600 ACCEPTANCE CRITERIA
ARTICLE TA-4000 FIELD ACCEPTANCE TESTS
TA-4100 FAN ACCEPTANCE TESTS <\/td>\n<\/tr>\n
471<\/td>\nTA-4200 DAMPER ACCEPTANCE TESTS
Table TA-4110-1 Fan Acceptance Tests <\/td>\n<\/tr>\n
472<\/td>\nTable TA-4210-1 Damper Acceptance Tests <\/td>\n<\/tr>\n
473<\/td>\nTA-4300 DUCT, HOUSING, AND MOUNTING FRAME ACCEPTANCE TESTS
TA-4400 REFRIGERATION EQUIPMENT ACCEPTANCE TESTS
Table TA-4310-1 Duct, Housing, and Frame Acceptance Tests <\/td>\n<\/tr>\n
474<\/td>\nTA-4500 CONDITIONING EQUIPMENT ACCEPTANCE TESTS
Table TA-4410-1 Refrigeration Equipment Acceptance Tests <\/td>\n<\/tr>\n
475<\/td>\nTable TA-4510-1 Conditioning Equipment Acceptance Tests <\/td>\n<\/tr>\n
476<\/td>\nTA-4600 MOISTURE SEPARATOR, PREFILTER, AND HEPA FILTER BANK ACCEPTANCE TESTS <\/td>\n<\/tr>\n
477<\/td>\nTA-4700 TYPES II, III, AND IV ADSORBER BANK ACCEPTANCE TESTS
Table TA-4610-1 Moisture Separator, Prefilter, and HEPA Filter Acceptance Tests
Table TA-4710-1 Types II, III, and IV Adsorber Bank Acceptance Tests <\/td>\n<\/tr>\n
478<\/td>\nTA-4800 ADSORBENT ACCEPTANCE TESTS
TA-4900 INTEGRATED SYSTEM TESTS <\/td>\n<\/tr>\n
479<\/td>\nARTICLE TA-5000 CORRECTIVE ACTION REQUIREMENTS
ARTICLE TA-6000 QUALITY ASSURANCE
TA-6100 GENERAL
TA-6200 PERSONNEL
TA-6300 DOCUMENTATION <\/td>\n<\/tr>\n
480<\/td>\nMANDATORY APPENDIX TA-I VISUAL INSPECTION CHECKLIST
ARTICLE TA-I-1000 GENERAL
TA-I-1100 FAN INSPECTION ITEMS
TA-I-1200 DAMPER INSPECTION ITEMS
TA-I-1300 DUCT, HOUSING, AND MOUNTING FRAME INSPECTION ITEMS
TA-I-1400 REFRIGERATION EQUIPMENT INSPECTION ITEMS <\/td>\n<\/tr>\n
481<\/td>\nTA-I-1500 CONDITIONING EQUIPMENT INSPECTION ITEMS
TA-I-1600 MOISTURE SEPARATOR BANK, PREFILTER BANK, AND HEPA FILTER BANK INSPECTION ITEMS
TA-I-1700 TYPES II, III, AND IV ADSORBER BANK INSPECTION ITEMS <\/td>\n<\/tr>\n
482<\/td>\nMANDATORY APPENDIX TA-II STRUCTURAL CAPABILITY TEST PROCEDURAL GUIDELINES
ARTICLE TA-II-1000 GENERAL
TA-II-1100 SUMMARY OF METHOD
ARTICLE TA-II-2000 PREREQUISITES
ARTICLE TA-II-3000 TEST EQUIPMENT
ARTICLE TA-II-4000 PROCEDURAL GUIDELINES
ARTICLE TA-II-5000 ACCEPTANCE CRITERIA <\/td>\n<\/tr>\n
483<\/td>\nMANDATORY APPENDIX TA-III DUCT AND HOUSING LEAK TEST PROCEDURAL GUIDELINES
ARTICLE TA-III-1000 GENERAL
TA-III-1100 SUMMARY OF METHOD
ARTICLE TA-III-2000 PREREQUISITES
ARTICLE TA-III-3000 TEST EQUIPMENT
ARTICLE TA-III-4000 PROCEDURAL GUIDELINES
TA-III-4100 CONSTANT PRESSURE TEST <\/td>\n<\/tr>\n
484<\/td>\nTA-III-4200 PRESSURE DECAY TEST
TA-III-4300 ACCEPTANCE CRITERIA
TA-III-4400 BUBBLE LEAK LOCATION METHOD
TA-III-4500 AUDIBLE LEAK LOCATION METHOD <\/td>\n<\/tr>\n
485<\/td>\nMANDATORY APPENDIX TA-IV AIRFLOW DISTRIBUTION TEST PROCEDURAL GUIDELINES
ARTICLE TA-IV-1000 GENERAL
TA-IV-1100 SUMMARY OF METHOD
ARTICLE TA-IV-2000 PREREQUISITES
ARTICLE TA-IV-3000 TEST EQUIPMENT
ARTICLE TA-IV-4000 PROCEDURAL GUIDELINES <\/td>\n<\/tr>\n
486<\/td>\nMANDATORY APPENDIX TA-V AIR-AEROSOL MIXING TEST PROCEDURAL GUIDELINES
TA-V-1100 SYSTEM TEST
TA-V-1200 SUMMARY OF METHOD
TA-V-1300 INJECTION PORT SELECTION CRITERIA
TA-V-1400 DOWNSTREAM SAMPLE PORT SELECTION CRITERIA
TA-V-4100 GENERAL <\/td>\n<\/tr>\n
487<\/td>\nTA-V-4200 DOWNSTREAM SAMPLE PORT QUALIFICATION <\/td>\n<\/tr>\n
488<\/td>\nMANDATORY APPENDIX TA-VI HEPA FILTER BANK IN-PLACE LEAK TEST PROCEDURAL GUIDELINES
ARTICLE TA-VI-1000 GENERAL
TA-VI-1100 SUMMARY OF METHOD
ARTICLE TA-VI-2000 PREREQUISITES
ARTICLE TA-VI-3000 TEST EQUIPMENT
ARTICLE TA-VI-4000 PROCEDURAL GUIDELINES <\/td>\n<\/tr>\n
489<\/td>\nMANDATORY APPENDIX TA-VII ADSORBER BANK IN-PLACE LEAK TEST PROCEDURAL GUIDELINES
TA-VII-1100 SUMMARY OF METHOD <\/td>\n<\/tr>\n
490<\/td>\nMANDATORY APPENDIX TA-VIII REFRIGERANT PIPING AND COIL SYSTEM LEAK TEST PROCEDURAL GUIDELINES
ARTICLE TA-VIII-1000 GENERAL
TA-VIII-1100 SUMMARY OF METHOD
ARTICLE TA-VIII-2000 PREREQUISITES
ARTICLE TA-VIII-3000 TEST EQUIPMENT
ARTICLE TA-VIII-4000 PROCEDURAL GUIDELINES
TA-VIII-4100 LEAK TEST PROCEDURAL GUIDELINES
TA-VIII-4200 EVACUATION AND DEHYDRATION PROCEDURE <\/td>\n<\/tr>\n
492<\/td>\nNONMANDATORY APPENDIX TA-A MOUNTING FRAME PRESSURE LEAK TEST PROCEDURAL GUIDELINES
ARTICLE TA-A-1000 GENERAL
TA-A-1100 SUMMARY OF METHOD
ARTICLE TA-A-2000 PREREQUISITES
ARTICLE TA-A-3000 TEST EQUIPMENT
ARTICLE TA-A-4000 PROCEDURAL GUIDELINES <\/td>\n<\/tr>\n
493<\/td>\nNONMANDATORY APPENDIX TA-B CORRECTIVE ACTION GUIDANCE <\/td>\n<\/tr>\n
494<\/td>\nNONMANDATORY APPENDIX TA-C CHALLENGE GAS AND AEROSOL SUBSTITUTE SELECTION CRITERIA
ARTICLE TA-C-1000
TA-C-1100 ALTERNATIVE CHALLENGE GASES
TA-C-1200 ALTERNATIVE CHALLENGE AEROSOLS <\/td>\n<\/tr>\n
495<\/td>\nSECTION TB FIELD TESTING OF GAS-PROCESSING SYSTEMS <\/td>\n<\/tr>\n
496<\/td>\nMANDATORY APPENDIX I PREPARATION OF TECHNICAL INQUIRIES TO THE COMMITTEE ON NUCLEAR AIR AND GAS TREATMENT <\/td>\n<\/tr>\n
497<\/td>\nNONMANDATORY APPENDIX A FORMAT GUIDE FOR TECHNICAL INQUIRIES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME AG-1 Code on Nuclear Air and Gas Treatment<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2017<\/td>\n499<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":182894,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-182888","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/182888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/182894"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=182888"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=182888"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=182888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}