{"id":182934,"date":"2024-10-19T11:26:59","date_gmt":"2024-10-19T11:26:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-2-2016\/"},"modified":"2024-10-25T03:48:11","modified_gmt":"2024-10-25T03:48:11","slug":"asme-b30-2-2016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-2-2016\/","title":{"rendered":"ASME B30.2 2016"},"content":{"rendered":"

B30.2 applies to the construction, installation, operation, inspection, and maintenance of hand-operated and power-driven overhead and gantry cranes that have a top-running single-girder or multiple-girder bridge, with one or more top-running trolley hoists used for vertical lifting and lowering of freely suspended, unguided loads consisting of equipment and materials. The requirements included in this Volume also apply to cranes having the same fundamental characteristics such as cantilever gantry cranes, semi-gantry cranes, and wall cranes. Requirements for a crane used for a special purpose such as, but not limited to, non-vertical lifting service, lifting a guided load, or lifting personnel are not included in this Volume.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n
10<\/td>\nB30 STANDARD INTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n
11<\/td>\nSECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n
13<\/td>\nSUMMARY OF CHANGES <\/td>\n<\/tr>\n
16<\/td>\nChapter 2-0 Scope, Definitions, References, and Personnel Competence
SECTION 2-0.1: SCOPE OF B30.2
SECTION 2-0.2: DEFINITIONS <\/td>\n<\/tr>\n
17<\/td>\nFigures
Fig. 2-0.2-1 Cantilever Gantry Crane
Fig. 2-0.2-2 Gantry Crane <\/td>\n<\/tr>\n
18<\/td>\nFig. 2-0.2-3 Overhead Crane
Fig. 2-0.2-4 Semigantry Crane
Fig. 2-0.2-5 Wall Crane <\/td>\n<\/tr>\n
20<\/td>\nSECTION 2-0.3: REFERENCES <\/td>\n<\/tr>\n
21<\/td>\nSECTION 2-0.4: PERSONNEL COMPETENCE <\/td>\n<\/tr>\n
22<\/td>\nChapter 2-1 General Construction and Installation
SECTION 2-1.1: MARKINGS
2-1.1.1 Rated Load Markings — Crane
2-1.1.2 Rated Load Markings — Hoists
2-1.1.3 Manufacturer\u0152s Identification Markings
2-1.1.4 Multiple Hoist Identification Markings
2-1.1.5 Warnings
2-1.1.6 Controls <\/td>\n<\/tr>\n
23<\/td>\nSECTION 2-1.2: CLEARANCES
2-1.2.1 Clearance From Obstruction
2-1.2.2 Clearance Between Parallel Cranes
SECTION 2-1.3: GENERAL CONSTRUCTION — RUNWAYS AND SUPPORTING STRUCTURE
2-1.3.1 Foundations and Anchorages
2-1.3.2 Crane Runways
SECTION 2-1.4: CRANE CONSTRUCTION
2-1.4.1 Welded Construction
2-1.4.2 Structural Components
2-1.4.3 Modifications <\/td>\n<\/tr>\n
24<\/td>\nSECTION 2-1.5: CABS — NORMAL OR SKELETON IF PROVIDED
2-1.5.1 Cab Location
2-1.5.2 Cab Construction
2-1.5.3 Access to Crane
2-1.5.4 Toolbox
2-1.5.5 Fire Extinguisher
2-1.5.6 Lighting
SECTION 2-1.6: LUBRICATION
SECTION 2-1.7: SERVICE PLATFORMS FOOTWALKS
2-1.7.1 Construction of Service Platforms <\/td>\n<\/tr>\n
25<\/td>\n2-1.7.2 Ladders and Stairways
2-1.7.3 Egress
SECTION 2-1.8: STOPS AND BUMPERS
2-1.8.1 Trolley Stops
2-1.8.2 Bridge Bumpers
2-1.8.3 Trolley Bumpers <\/td>\n<\/tr>\n
26<\/td>\nSECTION 2-1.9: RAIL SWEEPS
2-1.9.1 Bridge Rail Sweeps
2-1.9.2 Trolley Rail Sweeps
SECTION 2-1.10: GUARDS FOR MOVING PARTS
SECTION 2-1.11: TRUCK FRAME DROP
SECTION 2-1.12: BRAKES AND BRAKING MEANS
2-1.12.1 Hoist Holding Brakes <\/td>\n<\/tr>\n
27<\/td>\n2-1.12.2 Hoist Control Braking Means
2-1.12.3 Trolley Brakes and Braking Means
2-1.12.4 Bridge Brakes and Braking Means
2-1.12.5 Trolley and Bridge Brake Provisions
SECTION 2-1.13: ELECTRICAL EQUIPMENT
2-1.13.1 General <\/td>\n<\/tr>\n
28<\/td>\n2-1.13.2 Equipment
2-1.13.3 Controllers
2-1.13.4 Resistors <\/td>\n<\/tr>\n
29<\/td>\nFig. 2-1.13.3-1 Recommended Arrangement of Controllers or Master Switches (Three-Motion Crane)
Fig. 2-1.13.3-2 Recommended Arrangement of Controllers or Master Switches (Four-Motion Crane) <\/td>\n<\/tr>\n
30<\/td>\nFig. 2-1.13.3-3 Recommended Arrangement of Controllers (Pendant Push-Button Station Arrangement)
Fig. 2-1.13.3-4 Recommended Arrangement of Controllers (Radio Crane Control Transmitter Lever Arrangement) <\/td>\n<\/tr>\n
31<\/td>\n2-1.13.5 Disconnecting Means
2-1.13.6 Hoist Limit Switches
2-1.13.7 Runway and Bridge Conductor Systems
2-1.13.8 Cranes With Lifting Magnets
2-1.13.9 Service Receptacle
SECTION 2-1.14: HOISTING EQUIPMENT
2-1.14.1 Sheaves
2-1.14.2 Drums <\/td>\n<\/tr>\n
32<\/td>\n2-1.14.3 Ropes
2-1.14.4 Equalizers
2-1.14.5 Hooks
2-1.14.6 Guards for Hoisting Ropes
SECTION 2-1.15: WARNING DEVICES OR MEANS FOR A CRANE WITH A POWER-TRAVELING MECHANISM
2-1.15.1 Cab- and Remote-Operated Cranes
2-1.15.2 Floor-Operated Cranes
2-1.15.3 Types of Devices
SECTION 2-1.16: MANUAL
2-1.16.1 General Information <\/td>\n<\/tr>\n
33<\/td>\n2-1.16.2 Safety Personnel
SECTION 2-1.17: TRANSLATION OF SAFETY-RELATED INFORMATION AND CONTROL DESIGNATIONS <\/td>\n<\/tr>\n
34<\/td>\nChapter 2-2 Inspection and Testing
SECTION 2-2.1: INSPECTION
2-2.1.1 General
2-2.1.2 Initial Inspection
2-2.1.3 Functional Test Inspection
2-2.1.4 Frequent Inspection
2-2.1.5 Periodic Inspection <\/td>\n<\/tr>\n
35<\/td>\n2-2.1.6 Inspection of Cranes Not in Regular Use
SECTION 2-2.2: ROPE INSPECTION
2-2.2.1 General
2-2.2.2 Frequent Rope Inspection
2-2.2.3 Periodic Rope Inspection <\/td>\n<\/tr>\n
36<\/td>\nSECTION 2-2.3: TESTING
2-2.3.1 Operational Tests
2-2.3.2 Load Test <\/td>\n<\/tr>\n
37<\/td>\nChapter 2-3 Operator Training and Operation
SECTION 2-3.1: CRANE OPERATOR TRAINING
2-3.1.1 Purpose of Crane Operator Training
2-3.1.2 Crane Operator Training: General
2-3.1.3 Sources of Training Material
SECTION 2-3.2: TRAINING FOR PERSONS OTHER THAN CRANE OPERATORS
2-3.2.1 Scope
SECTION 2-3.3: OPERATION
2-3.3.1 Scope of Crane Operation
2-3.3.2 General Requirements <\/td>\n<\/tr>\n
38<\/td>\n2-3.3.3 Responsibilities of Management Owners\/Users
2-3.3.4 Responsibilities of Crane Operators <\/td>\n<\/tr>\n
40<\/td>\n2-3.3.5 Responsibilities of Riggers
SECTION 2-3.4: PLANNED ENGINEERED LIFTS <\/td>\n<\/tr>\n
41<\/td>\nSECTION 2-3.5: HOIST LIMIT DEVICES SWITCHES
SECTION 2-3.6: SIGNALS
2-3.6.1 Standard Signals
2-3.6.2 Special Signals
SECTION 2-3.7: MISCELLANEOUS
2-3.7.1 Ladders
2-3.7.2 Cabs
2-3.7.3 Fire Extinguishers
SECTION 2-3.8: CRANE LOCKOUT\/TAGOUT
2-3.8.1 General <\/td>\n<\/tr>\n
42<\/td>\nFig. 2-3.6.1-1 Standard Hand Signals for Controlling Overhead and Gantry Cranes <\/td>\n<\/tr>\n
43<\/td>\nChapter 2-4 Maintenance Training and Maintenance
SECTION 2-4.1: MAINTENANCE TRAINING
2-4.1.1 Purpose of Maintenance Training
2-4.1.2 Crane Maintenance Training: General
2-4.1.3 Sources of Training
2-4.1.4 Responsibilities of Crane Maintenance Personnel
SECTION 2-4.2: CRANE MAINTENANCE
2-4.2.1 General Maintenance <\/td>\n<\/tr>\n
44<\/td>\n2-4.2.2 Preventive Maintenance
2-4.2.3 Maintenance Procedure
2-4.2.4 Adjustments, Repairs, and Replacements
2-4.2.5 Lubrication
SECTION 2-4.3: ROPE REPLACEMENT AND MAINTENANCE
2-4.3.1 Rope Replacement <\/td>\n<\/tr>\n
45<\/td>\n2-4.3.2 Rope Maintenance
SECTION 2-4.4: MAINTENANCE RECORDS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.2 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2016<\/td>\n46<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":182936,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-182934","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/182934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/182936"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=182934"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=182934"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=182934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}