{"id":186312,"date":"2024-10-19T11:41:51","date_gmt":"2024-10-19T11:41:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-guideline-1-3-2018\/"},"modified":"2024-10-25T04:06:01","modified_gmt":"2024-10-25T04:06:01","slug":"ashrae-guideline-1-3-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-guideline-1-3-2018\/","title":{"rendered":"ASHRAE Guideline 1.3 2018"},"content":{"rendered":"

Guideline 1.3 provides methodologiesand formats for developing training plans, conducting training programs, anddocumenting training results for the operation and maintenance of buildingHVAC&R systems during the Commissioning (Cx) Process. In addition to offering immediate access to the content, the PDF download of this standard presents selected graphics in color for enhanced readability.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nASHRAE Guideline 1.3-2018 <\/td>\n<\/tr>\n
3<\/td>\nCONTENTS <\/td>\n<\/tr>\n
4<\/td>\n1. PURPOSE
2. SCOPE
3. UTILIZATION
4. DEFINITIONS <\/td>\n<\/tr>\n
5<\/td>\n5. INTENT OF COMMISSIONING (CX) PROCESS TRAINING
6. PREDESIGN PHASE <\/td>\n<\/tr>\n
6<\/td>\n7. DESIGN PHASE <\/td>\n<\/tr>\n
8<\/td>\n8. CONSTRUCTION PHASE <\/td>\n<\/tr>\n
9<\/td>\n9. OCCUPANCY AND OPERATIONS PHASE <\/td>\n<\/tr>\n
10<\/td>\n10. ONGOING COMMISSIONING (OCX) PROCESS
11. EXISTING BUILDINGS\u2014OTHER THAN ONGOING COMMISSIONING
12. REFERENCES <\/td>\n<\/tr>\n
12<\/td>\nINFORMATIVE ANNEX A\u2014TRAINING FLOWCHART <\/td>\n<\/tr>\n
13<\/td>\nINFORMATIVE ANNEX B\u2014TRAINING DOCUMENTATION AND VERIFICATION MATRIX <\/td>\n<\/tr>\n
15<\/td>\nINFORMATIVE ANNEX C\u2014GENERAL TRAINING RESOURCES <\/td>\n<\/tr>\n
16<\/td>\nINFORMATIVE ANNEX D\u2014NEEDS ASSESSMENT STRUCTURE <\/td>\n<\/tr>\n
17<\/td>\nTable D-1 Predesign Phase Training Expectations Matrix <\/td>\n<\/tr>\n
18<\/td>\nTable D-2 Design Phase Training Expectations Matrix <\/td>\n<\/tr>\n
19<\/td>\nINFORMATIVE ANNEX E\u2014TRAINING IN THE OWNER’S PROJECT REQUIREMENTS (OPR) <\/td>\n<\/tr>\n
20<\/td>\nINFORMATIVE ANNEX F\u2014TRAINING PLAN <\/td>\n<\/tr>\n
22<\/td>\nINFORMATIVE ANNEX G\u2014BUDGETING FOR TRAINING <\/td>\n<\/tr>\n
23<\/td>\nINFORMATIVE ANNEX H\u2014TRAINING INSTRUCTOR QUALIFICATIONS <\/td>\n<\/tr>\n
24<\/td>\nINFORMATIVE ANNEX I\u2014GENERAL TRAINING SPECIFICATIONS <\/td>\n<\/tr>\n
28<\/td>\nINFORMATIVE ANNEX J\u2014TRAINING CHECKLISTS <\/td>\n<\/tr>\n
29<\/td>\nTable J-1 Training Types Checklist <\/td>\n<\/tr>\n
30<\/td>\nTable J-2 Logistics Checklist <\/td>\n<\/tr>\n
33<\/td>\nTable J-3 Verification Checklist <\/td>\n<\/tr>\n
34<\/td>\nINFORMATIVE ANNEX K\u2014TRAINING EFFECTIVENESS QUESTIONNAIRE <\/td>\n<\/tr>\n
35<\/td>\nINFORMATIVE ANNEX L\u2014TRAINING BEST PRACTICES <\/td>\n<\/tr>\n
38<\/td>\nINFORMATIVE ANNEX M\u2014TRAINING AGENDA <\/td>\n<\/tr>\n
41<\/td>\nINFORMATIVE ANNEX N\u2014CROSS REFERENCES TO TRAINING REQUIREMENTS IN ASHRAE COMMISSIONING DOCUMENTS
N1. Summary of References to Training In ASHRAE Guideline 0, The Commissioning Process <\/td>\n<\/tr>\n
44<\/td>\nN2. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 0.2, THE COMMISSIONING PROCESS FOR EXISTING BUILDING SYSTEMS AND ASSEMBLIES <\/td>\n<\/tr>\n
47<\/td>\nN3. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.1, HVAC&R TECHNICAL REQUIREMENTS FOR THE COMMISSIONING PROCESS <\/td>\n<\/tr>\n
49<\/td>\nN4. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.4, PROCEDURES FOR PREPARING FACILITY SYSTEMS MANUALS <\/td>\n<\/tr>\n
51<\/td>\nN5. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE GUIDELINE 1.5, THE COMMISSIONING PROCESS FOR SMOKE CONTROL SYSTEMS <\/td>\n<\/tr>\n
53<\/td>\nN6. SUMMARY OF REFERENCES TO TRAINING IN ASHRAE STANDARD 202, COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASHRAE Guideline 1.3-2018 – Building Operations and Maintenance Training for the HVAC&R Commissioning Process<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2018<\/td>\n56<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":186315,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-186312","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/186312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/186315"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=186312"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=186312"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=186312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}