{"id":194497,"date":"2024-10-19T12:20:32","date_gmt":"2024-10-19T12:20:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-120-2017\/"},"modified":"2024-10-25T04:51:33","modified_gmt":"2024-10-25T04:51:33","slug":"ieee-c57-120-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-120-2017\/","title":{"rendered":"IEEE C57.120 2017"},"content":{"rendered":"
Revision Standard – Active. The economic loss evaluation of liquid-filled distribution and power transformers, dry-type distribution and power transformers, and reactors is covered in this guide.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.120\u2122-2017 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2.\u2002Definitions, acronyms, and abbreviations 2.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3.\u2002Loss evaluation parameters 3.1\u2002General 3.2\u2002Total owning cost (TOC) <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 3.3\u2002Cost of no-load losses (A) 3.4\u2002Cost of load losses (B) 3.5\u2002Cost of auxiliary losses (B1, B2) <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.6\u2002Equipment parameters <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 3.7\u2002Cost parameters <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 3.8\u2002Load parameters <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 3.9\u2002Example <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 4.\u2002Transformer loss evaluation for industrial and commercial entities and transmission only electric utilities 4.1\u2002Introduction <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 4.2\u2002Example <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 4.3\u2002Alternate methods for determining system investment (SC) for non-vertically integrated utilities and industrial users <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex A (informative) Formulas, tables, and figures A.1\u2002Basic economic formulas <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | A.2\u2002Minimum acceptable return (MAR) <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | A.3\u2002Levelized fixed-charge rate (FCR) <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex B (informative) Description of transformer power losses B.1\u2002Transformers B.2\u2002Total power losses <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Annex C (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Loss Evaluation of Distribution and Power Transformers and Reactors<\/b><\/p>\n |