{"id":194498,"date":"2024-10-19T12:20:32","date_gmt":"2024-10-19T12:20:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1827-2016\/"},"modified":"2024-10-25T04:51:33","modified_gmt":"2024-10-25T04:51:33","slug":"ieee-1827-2016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1827-2016\/","title":{"rendered":"IEEE 1827 2016"},"content":{"rendered":"

New IEEE Standard – Active. Electrical and control design of water conveyance facilities associated with hydroelectric projects including associated penstocks, valves, and gates are described in this guide. Guidance to plan and prepare designs is included. Installation, peration, or maintenance guideline and methodologies are not included. Design of new facilities and rehabilitation or replacement of existing facilities is covered. Comprehensive considerations for design, monitoring, control, protection, and operation of water conveyance facilities associated with hydroelectric projects is provided. Guidance in electrical and instrumentation work unique to water conveyance systems is provided. Guidance for the safe control of water release systems, bypass systems, and failure modes are provided. Reliability measures such as redundancy and power source considerations are provided. Gate and valve types and associated operating mechanisms are introduced. Power and non-power water conduits including penstocks, tunnels, and canals are covered.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1827\u2122-2016 Front cover <\/td>\n<\/tr>\n
2<\/td>\nTitle page <\/td>\n<\/tr>\n
4<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
7<\/td>\nParticipants <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\nContents <\/td>\n<\/tr>\n
11<\/td>\n1.\u2002Overview
1.1\u2002Scope
1.2\u2002Purpose
1.3\u2002Use of this guide <\/td>\n<\/tr>\n
12<\/td>\n1.4\u2002Governing regulations
2.\u2002Normative references <\/td>\n<\/tr>\n
13<\/td>\n3.\u2002Definitions <\/td>\n<\/tr>\n
14<\/td>\n4.\u2002General considerations
4.1\u2002Public safety <\/td>\n<\/tr>\n
15<\/td>\n4.2\u2002Environmental considerations <\/td>\n<\/tr>\n
16<\/td>\n4.3\u2002Cables and conductors <\/td>\n<\/tr>\n
17<\/td>\n4.4\u2002Testing and commissioning <\/td>\n<\/tr>\n
18<\/td>\n5.\u2002Site electrical layout and access
6.\u2002Overview of gates and valves
6.1\u2002Gate and valve types <\/td>\n<\/tr>\n
19<\/td>\n6.2\u2002Gate operating mechanism <\/td>\n<\/tr>\n
21<\/td>\n7.\u2002Electric supply and distribution
7.1\u2002Backup power <\/td>\n<\/tr>\n
22<\/td>\n7.2\u2002Surge protection
7.3\u2002Grounding
8.\u2002Control, monitoring, and gate protection
8.1\u2002General design considerations <\/td>\n<\/tr>\n
23<\/td>\n8.2\u2002Response to failures <\/td>\n<\/tr>\n
24<\/td>\n8.3\u2002Flood control and flow regulation gates
8.4\u2002Power plant de-watering and emergency close gates <\/td>\n<\/tr>\n
25<\/td>\n8.5\u2002Control <\/td>\n<\/tr>\n
30<\/td>\n8.6\u2002Gate and gate operating mechanism protection <\/td>\n<\/tr>\n
31<\/td>\n8.7\u2002Bypass <\/td>\n<\/tr>\n
32<\/td>\n8.8\u2002Alarms
8.9\u2002Public warning systems and barriers <\/td>\n<\/tr>\n
33<\/td>\n8.10\u2002Monitoring <\/td>\n<\/tr>\n
36<\/td>\n8.11\u2002Safety and security considerations <\/td>\n<\/tr>\n
37<\/td>\n9.\u2002Other facilities and equipment
9.1\u2002Communication networks <\/td>\n<\/tr>\n
38<\/td>\n9.2\u2002Security and access controls <\/td>\n<\/tr>\n
40<\/td>\nAnnex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n
42<\/td>\nAnnex\u00a0B (informative) Gate types <\/td>\n<\/tr>\n
44<\/td>\nAnnex\u00a0C (informative) Automatic water release systems
C.1\u2002Number of auto-controlled gates
C.2\u2002Defense against spurious operation
C.3\u2002Separation of automatic water release from other systems
C.4\u2002Automatic water release triggers <\/td>\n<\/tr>\n
45<\/td>\nC.5\u2002Gate operating sequence
C.6\u2002Open and close control
C.7\u2002Gate fail to operate
C.8\u2002Gate movement alarm
C.9\u2002Initial opening rate <\/td>\n<\/tr>\n
46<\/td>\nC.10\u2002Automatic water release on\/off
C.11\u2002Local\/remote control transfer
C.12\u2002Contention between remote manual and automatic control <\/td>\n<\/tr>\n
47<\/td>\nAnnex\u00a0D (informative) Typical alarms <\/td>\n<\/tr>\n
49<\/td>\nAnnex\u00a0E (informative) Reservoir level monitoring systems
E.1\u2002Staff gauges
E.2\u2002Reservoir level transducers <\/td>\n<\/tr>\n
50<\/td>\nE.3\u2002Stilling wells
E.4\u2002Measurement accuracy
E.5\u2002Reservoir range <\/td>\n<\/tr>\n
51<\/td>\nE.6\u2002Installation
E.7\u2002Maintenance <\/td>\n<\/tr>\n
52<\/td>\nAnnex\u00a0F (informative) Conduit rupture detection system <\/td>\n<\/tr>\n
53<\/td>\nF.1\u2002Comparison of schemes
F.2\u2002Measurement inaccuracy and misoperation <\/td>\n<\/tr>\n
54<\/td>\nF.3\u2002Action upon detection of leak or rupture
F.4\u2002Tripping scheme
F.5\u2002Flow sensors <\/td>\n<\/tr>\n
55<\/td>\nF.6\u2002Ultrasonic flow transducers
F.7\u2002Pressure-time flow measurement <\/td>\n<\/tr>\n
56<\/td>\nAnnex\u00a0G (informative) Water quality monitoring and control <\/td>\n<\/tr>\n
57<\/td>\nAnnex\u00a0H (informative) Fish passage equipment
H.1\u2002Design considerations
H.2\u2002Operational considerations <\/td>\n<\/tr>\n
58<\/td>\nAnnex\u00a0I (informative) Trash cleaning and monitoring
I.1\u2002Trash cleaning equipment <\/td>\n<\/tr>\n
59<\/td>\nI.2\u2002Trash cleaning monitoring systems <\/td>\n<\/tr>\n
60<\/td>\nAnnex\u00a0J (informative) Lighting
J.1\u2002Egress lighting
J.2\u2002Exterior lighting
J.3\u2002Lighting controls <\/td>\n<\/tr>\n
61<\/td>\nAnnex\u00a0K (informative) Video monitoring systems <\/td>\n<\/tr>\n
62<\/td>\nBack cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Electrical and Control Design of Hydroelectric Water Conveyance Facilities<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2017<\/td>\n62<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":194500,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-194498","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/194498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/194500"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=194498"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=194498"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=194498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}