{"id":194827,"date":"2024-10-19T12:21:45","date_gmt":"2024-10-19T12:21:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-515-2017\/"},"modified":"2024-10-25T04:52:45","modified_gmt":"2024-10-25T04:52:45","slug":"ieee-515-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-515-2017\/","title":{"rendered":"IEEE 515 2017"},"content":{"rendered":"
Revision Standard – Active. Specific testing requirements for qualifying electrical resistance trace heating for use in industrial applications in ordinary locations, as well as a basis for electrical and theremal design, are included in this standard.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 515\u2122-2017 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.\u2002Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.\u2002General product testing 4.1\u2002Type test\u2014general purpose tests <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.2\u2002Type test\u2014determination of maximum sheath temperature <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 4.3\u2002Routine tests 5.\u2002Marking and installation instructions 5.1\u2002Product markings for trace heating devices <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.2\u2002Markings for field-assembled components 5.3\u2002Installation instructions 6.\u2002Design 6.1\u2002Process considerations <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.2\u2002Site considerations 6.3\u2002Thermal insulation and heat-loss considerations <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.4\u2002Maximum temperature determination <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.5\u2002Design information <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 6.6\u2002Power system <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 6.7\u2002Special considerations <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 6.8\u2002Controlling and monitoring considerations <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 6.9\u2002Safety shower design requirements <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 7.\u2002Installation 7.1\u2002Personnel 7.2\u2002Receiving and storage of materials <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 7.3\u2002Scheduling of installation 7.4\u2002General installation recommendations <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 7.5\u2002Controls and sensors 7.6\u2002Testing after installation 7.7\u2002Thermal insulation\u2014recommendations <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 7.8\u2002Functional check and field documentation\u2014recommendations <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 8.\u2002Maintenance 8.1\u2002General maintenance recommendations 8.2\u2002Visual inspection 8.3\u2002Periodic operational check <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 8.4\u2002Record keeping <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Annex\u00a0A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex\u00a0B (informative) Pipe heat-loss considerations B.1\u2002Heat-loss formula <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | B.2\u2002Example heat loss calculations <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Annex\u00a0C (informative) Vessel heat-loss considerations C.1\u2002Insulation heat loss (Qins) C.2\u2002Slab surface areas (Qslab) <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | C.3\u2002Support heat loss (Qsupt) <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | C.4\u2002Manhole heat loss (Qmanhole) C.5\u2002Convection coefficient equations <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Annex\u00a0D (informative) Heat-up and cool-down considerations D.1\u2002Heat-up <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | D.2\u2002Cool-down <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | Annex\u00a0E (informative) Method to determine equivalent thicknesses of insulating cements <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Annex\u00a0F (informative) Design basic data\u2014example (see 6.5) <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | Annex\u00a0G (informative) Trace heater installation record\u2014example (see 7.2.2) <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Annex\u00a0H (informative) Trace heater commissioning record\u2014example (see 7.8) <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Annex\u00a0I (informative) Maintenance log record\u2014example (see 8.4.3) <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Trace Heating for Industrial Applications<\/b><\/p>\n |