{"id":202506,"date":"2024-10-19T12:57:10","date_gmt":"2024-10-19T12:57:10","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-506-2-2013-ra2018\/"},"modified":"2024-10-25T05:35:02","modified_gmt":"2024-10-25T05:35:02","slug":"aci-506-2-2013-ra2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-506-2-2013-ra2018\/","title":{"rendered":"ACI 506.2 2013 RA2018"},"content":{"rendered":"

This specification contains the construction requirements for the application of shotcrete. Both wet- and dry-mixture shotcrete are addressed, as well as fiber-reinforced shotcrete. The minimum standard for materials, properties, testing, and application are covered. The materials, processes, quality control measures, and inspections described in this specification should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI certifications or equivalent. Keywords: dry-mixture shotcrete; fiber-reinforced shotcrete; nozzleman; qualification; quality control; quality assurance; shooting; wet-mixture shotcrete.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nTITLE PAGE <\/td>\n<\/tr>\n
4<\/td>\nPART 1\u2014GENERAL
1.1\u2014Scope
1.2\u2014Definitions
1.3\u2014Referenced standards <\/td>\n<\/tr>\n
5<\/td>\n1.4\u2014Submittals <\/td>\n<\/tr>\n
6<\/td>\n1.5\u2014Preconstruction testing by Contractor
1.6\u2014Testing during construction <\/td>\n<\/tr>\n
7<\/td>\n1.7\u2014Acceptance of Work
PART 2\u2014PRODUCTS
2.1\u2014Materials <\/td>\n<\/tr>\n
8<\/td>\n2.2\u2014Packaged shotcrete materials
2.3\u2014Fiber-reinforced shotcrete
2.4\u2014Shotcrete properties
2.5\u2014Proportioning
2.6\u2014Batching, mixing, and delivery
PART 3\u2014EXECUTION
3.1\u2014Preparation of surface to receive shotcrete
3.2\u2014Joints <\/td>\n<\/tr>\n
9<\/td>\n3.3\u2014Alignment control
3.4\u2014Application <\/td>\n<\/tr>\n
10<\/td>\n3.5\u2014Finish
3.6\u2014Curing
3.7\u2014Protection
3.8\u2014Tolerances
3.9\u2014Repair of shotcrete
(nonmandatory portion follows)
NOTES TO SPECIFIER
General notes <\/td>\n<\/tr>\n
11<\/td>\nFOREWORD TO CHECKLISTS <\/td>\n<\/tr>\n
14<\/td>\nCHECKLIST REFERENCES <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ACI SPEC-506.2-13 Specification for Shotcrete (Reapproved 2018)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ACI<\/b><\/a><\/td>\n2013<\/td>\n16<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":202510,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2650],"product_tag":[],"class_list":{"0":"post-202506","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aci","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/202506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/202510"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=202506"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=202506"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=202506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}