{"id":276093,"date":"2024-10-19T18:34:47","date_gmt":"2024-10-19T18:34:47","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-1011-82018-tc\/"},"modified":"2024-10-25T15:00:43","modified_gmt":"2024-10-25T15:00:43","slug":"bs-en-1011-82018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-1011-82018-tc\/","title":{"rendered":"BS EN 1011-8:2018 – TC"},"content":{"rendered":"
This document specifies the requirements for fusion welding of unalloyed and low-alloy cast iron castings produced in accordance with: – EN 1561, Founding – Grey cast irons; – EN 1562, Founding – Malleable cast irons; – EN 1563, Founding – Spheroidal graphite cast irons. This document does not apply to the joint welding of cast iron castings to other materials.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
38<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 4 Abbreviations and symbols 5 Provision for quality assurance requirements 6 Storage, handling and identification of parent metal 7 Fusion welding processes <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 8 Welding consumables 8.1 General 8.2 Storage and handling 9 Equipment 9.1 General 9.2 Ancillary equipment <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 10 Fabrication 11 Weld preparation 11.1 Assembly for welding <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 11.2 Finishing welds and repair welds 12 Fabrication and inspection feasibility 13 Pre-heat temperature and interpass temperature 14 Tack welds 15 Temporary attachments 16 Run-on plates and run-off plates 17 Arc strikes 18 Weld run sequence 19 Heat input <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 20 Welding procedure specification (WPS) 21 Traceability 22 Elimination of distortion or inherent stresses 23 Inspection and testing 24 Quality requirements 25 Non-conformance and corrective actions 26 Distortion 27 Post weld heat treatment 28 Surface cleaning and treatment <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex A (normative)Quality requirements A.1 General A.2 Requirements for fusion welding A.2.1 Agreement A.2.2 Requirements <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | A.2.3 Inspection and testing <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Annex B (informative)Welding technology for cast iron castings B.1 General B.2 Preparation for welding B.3 Backing bar B.4 Heat and temperature distribution <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Welding. Recommendations for welding of metallic materials – Welding of cast irons<\/b><\/p>\n |