{"id":335520,"date":"2024-10-19T23:25:26","date_gmt":"2024-10-19T23:25:26","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16602-10-042014\/"},"modified":"2024-10-25T22:23:07","modified_gmt":"2024-10-25T22:23:07","slug":"bs-en-16602-10-042014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16602-10-042014\/","title":{"rendered":"BS EN 16602-10-04:2014"},"content":{"rendered":"
This Standard defines the principles, process, implementation and requirements for critical-items control.<\/p>\n
Clause 4 is the informative part of this Standard whereas clause 5 and Annex A form the normative part.<\/p>\n
This standard may be tailored for the specific characteristics and constraints of a space project, in accordance with ECSS-S-ST-00.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
8<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms defined in other standards 3.2 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Overview of the critical-item control process 4.1 General 4.2 Critical-item control process 4.2.1 Critical items and critical-item control 4.2.2 Interfaces between critical-item control and risk management <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.2.3 Interfaces between critical-item control and product assurance 4.2.4 Interfaces between critical-item control and product engineering <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.2.5 Integration of CI control activities <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5 Requirements 5.1 Critical-item control process 5.1.1 General requirements <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.2 Implementation requirements 5.2.1 General 5.2.2 Step 1: Define CI control requirement 5.2.2.1 Task 1: Establish the CI definition for the project <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2.2.2 Task 2: Define the CI control process scope and objectives 5.2.2.3 Task 3: Plan the implementation of the CI control process for the project 5.2.3 Step 2: Identify and classify the critical items 5.2.3.1 Task 4: Identify critical items 5.2.3.2 Task 5: Classify critical items <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2.4 Step 3: Decide and act 5.2.4.1 Task 6: Prioritise critical items 5.2.4.2 Task 7: Propose CI control measures 5.2.4.3 Task 8: Decide on the CI control measures 5.2.4.4 Task 9: Implement agreed CI control measures <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2.5 Step 4: Communicate and close\ufffdout 5.2.5.1 Task 10: Monitor and communicate the results of the CI control process 5.2.5.2 Task 11: Close\ufffdout the CI control process for the project 5.3 Integration of CI control activities 5.3.1 Consolidation and gathering method <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3.2 Preliminary design review (PDR) 5.3.3 Critical design review (CDR) 5.3.4 Acceptance review (AR) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Space product assurance. Critical-item control<\/b><\/p>\n |