{"id":386131,"date":"2024-10-20T03:33:58","date_gmt":"2024-10-20T03:33:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-28360-12021\/"},"modified":"2024-10-26T06:30:03","modified_gmt":"2024-10-26T06:30:03","slug":"bs-iso-iec-28360-12021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-28360-12021\/","title":{"rendered":"BS ISO\/IEC 28360-1:2021"},"content":{"rendered":"
This document specifies methods of assessing the resistance of printed materials to liquid and solid agents, solvents, varnishes and acids.<\/p>\n
It applies to printing on all substrates by any of the traditional printing process (offset, screen, gravure, flexo) as well as the newer digital processes (inkjet, electrophotography).<\/p>\n
Aspects of food safety and consumer protection for food contact materials are not covered.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 2 Conformance 3 Normative references 4 Terms and definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5 Symbols and Abbreviated terms 5.1 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2 Symbols <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6 Method overview <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7 ETC requirements 7.1 Construction materials 7.2 Air tightness <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.3 Air mixing efficiency 8 Determination method 8.1 Test conditions 8.1.1 General 8.1.2 Operating temperature and relative humidity (RH) 8.1.3 Air exchange rate (n) 8.1.4 Air velocity 8.1.5 Sampled air flow 8.2 Handling of EUT and ETC 8.2.1 Selection and storage of EUT <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.2.2 Loading Factor 8.2.3 ETC purging 8.2.4 Background concentrations (Cbg and Cpbg) <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.2.5 EUT unpacking 8.2.6 Preparation of the EUT before testing 8.2.7 EUT installation <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 8.3 EUT Operation during Test 8.3.1 General 8.3.2 Pre-operating phase 8.3.3 Operating phase <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.3.4 Post-operating phase 8.3.5 Recording of EUT operation 8.4 VOC and carbonyl compounds 8.4.1 Sorbents 8.4.2 Sample collection 8.4.2.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.4.2.2 Sampling 8.4.2.3 Requirements after sampling 8.4.3 Emission rate calculation 8.4.3.1 General <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.4.3.2 Emissions in the pre-operating phase CEM 8.4.3.3 Emissions in the operating and post-operating phase <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.4.4 Total VOC emission rate 8.5 Ozone <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.5.1 Analyser and sampling line requirements 8.5.2 Monitoring 8.5.3 Emission rate calculation <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 8.6 Particulate matter <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8.6.1 Weighing and Filter conditioning 8.6.2 Sampling 8.6.3 Emission rate calculation <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.7 Fine and Ultrafine Particles (FP and UFP) <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 8.7.1 General Requirements for Aerosol Measuring Systems (AMS) 8.7.1.1 General 8.7.1.2 Particle size range <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8.7.1.3 Particle number concentration range 8.7.1.4 Time resolution 8.7.1.5 Working fluids for CPC 8.7.1.6 Connection of AMS to ETC 8.7.1.7 Quality Assurance <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 8.7.2 Measurement 8.7.3 Calculation 8.7.3.1 General 8.7.3.2 Calculation of Particle loss coefficient \u03b2 <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.7.3.3 Calculation of PER and TP <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 8.7.3.4 Calculation of PER and TP, final steps <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 9 Test report <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex A (normative) Print Patterns A.1 Monochrome print pattern, 5% coverage <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | A.2 Colour print pattern, 20% coverage <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex B (normative) Preparatory AMS Test Procedures B.1 Procedures for operational readiness of AMS B.1.1 Particle size concentration range measurements B.1.2 Particle number concentration range measurements <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | B.2 Procedures for operational readiness test of Fast AMS B.2.1 Set up of instrument B.2.2 Preparation for measurement <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | B.3 Procedures for operational readiness test of CPC B.3.1 Set up the instrument <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | B.3.2 Preparation for measurement <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex C (informative) Model for QEM C.1 Objectives C.2 Approach <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | C.3 General mass balance and concentration equations C.4 Background Concentration <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | C.5 Emission rate calculation C.5.1 Emission during pre-operating phase C.5.2 Emission during operating phase <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Annex D (informative) Model for CEM D.1 Objectives D.2 Approach <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | D.3 General mass balance and concentration equations D.4 Background concentrations D.5 Emission rate calculation D.5.1 Emission during pre-operating phase <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | D.5.2 Emission during operating and post-operating phase <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Annex E (Informative) DE-UZ 205 Options <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. Determination of chemical emission rates from electronic equipment – Using consumables<\/b><\/p>\n |