{"id":390967,"date":"2024-10-20T03:57:09","date_gmt":"2024-10-20T03:57:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-2035-20302019a12022\/"},"modified":"2024-10-26T07:18:25","modified_gmt":"2024-10-26T07:18:25","slug":"bsi-pas-2035-20302019a12022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-2035-20302019a12022\/","title":{"rendered":"BSI PAS 2035\/2030:2019+A1:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 0 Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4 Guidance about retrofit building physics 4.1 Introduction 4.2 Building pathology 4.3 Thermal models and calculations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5 Guidance about approaches to retrofit 5.1 Retrofit performance considerations, standards and constraints 5.2 Medium-term improvement plans <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3 Retrofit at scale 5.4 Fabric first <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.5 Concentrate on the interfaces 5.6 Retrofit advice <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6 Requirements for retrofit coordination and risk management 6.1 Retrofit Coordinator 6.2 Establishing intended outcomes <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7 Requirements for retrofit risk assessments 7.1 Risk assessment process 7.2 Consequences of the outcome of the risk assessment 7.3 Repeating the risk assessment <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8 Requirements for whole-dwelling assessments 8.1 The purpose of the assessment 8.2 The Retrofit Assessor <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.4 Assessment: Path B 8.5 Assessment: Path C <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.6 Reporting the assessment and handing over assessment data <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 9 Requirements for retrofit designs 9.1 Design: Path A <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 9.2 Design: Path B <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 9.3 Design: Path C <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 10 Requirements for installation of retrofit designs <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 11 Requirements for testing and commissioning 11.1 Requirements for testing 11.2 Requirements for commissioning 11.3 Test certificates and commissioning records <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 12 Requirements for handover 12.1 Specification of handover requirements 12.2 Handover recipients <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 13 Requirements for retrofit advice 13.1 \uea01Delivery of Retrofit Advice\uea02 13.2 Retrofit advice: Path A <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 13.3 Retrofit advice: Paths B and C <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 14 Requirements for monitoring and evaluation 14.1 The purpose of monitoring and evaluation 14.2 Retrofit Evaluator 14.3 Levels of monitoring and evaluation 14.4 Basic monitoring and evaluation <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 14.5 Intermediate monitoring and evaluation 14.6 Advanced monitoring and evaluation <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 15 Claims of compliance 15.1 General 15.2 Basis of claim 15.3 Permitted forms of disclosure <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 16 References <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 2 Normative references <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 4 Retrofit project management <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 5 The retrofit design <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 6 Installation process <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 7 Installation process management <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 8 Service provision <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 9 Claims of compliance <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 10 Documents essential to the application of the Annexes of this PAS <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | Annex A (normative) Measure-specific Annex selection and co-installation requirements <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Annex B (normative) BFM energy efficiency measure <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | Annex C (normative) BSM energy efficiency measures <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | Annex D (normative) BSE energy efficiency measures <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | Annex G (informative) Example installation project information collation form <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Retrofitting dwellings for improved energy efficiency. Specification and guidance<\/b><\/p>\n |