{"id":390967,"date":"2024-10-20T03:57:09","date_gmt":"2024-10-20T03:57:09","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-2035-20302019a12022\/"},"modified":"2024-10-26T07:18:25","modified_gmt":"2024-10-26T07:18:25","slug":"bsi-pas-2035-20302019a12022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-2035-20302019a12022\/","title":{"rendered":"BSI PAS 2035\/2030:2019+A1:2022"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\n0 Introduction <\/td>\n<\/tr>\n
10<\/td>\n1 Scope <\/td>\n<\/tr>\n
12<\/td>\n2 Normative references <\/td>\n<\/tr>\n
14<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
17<\/td>\n4 Guidance about retrofit building physics
4.1 Introduction
4.2 Building pathology
4.3 Thermal models and calculations <\/td>\n<\/tr>\n
19<\/td>\n5 Guidance about approaches to retrofit
5.1 Retrofit performance considerations, standards and constraints
5.2 Medium-term improvement plans <\/td>\n<\/tr>\n
20<\/td>\n5.3 Retrofit at scale
5.4 Fabric first <\/td>\n<\/tr>\n
21<\/td>\n5.5 Concentrate on the interfaces
5.6 Retrofit advice <\/td>\n<\/tr>\n
22<\/td>\n6 Requirements for retrofit coordination and risk management
6.1 Retrofit Coordinator
6.2 Establishing intended outcomes <\/td>\n<\/tr>\n
23<\/td>\n7 Requirements for retrofit risk assessments
7.1 Risk assessment process
7.2 Consequences of the outcome of the risk assessment
7.3 Repeating the risk assessment <\/td>\n<\/tr>\n
24<\/td>\n8 Requirements for whole-dwelling assessments
8.1 The purpose of the assessment
8.2 The Retrofit Assessor <\/td>\n<\/tr>\n
25<\/td>\n8.4 Assessment: Path B
8.5 Assessment: Path C <\/td>\n<\/tr>\n
26<\/td>\n8.6 Reporting the assessment and handing over assessment data <\/td>\n<\/tr>\n
27<\/td>\n9 Requirements for retrofit designs
9.1 Design: Path A <\/td>\n<\/tr>\n
30<\/td>\n9.2 Design: Path B <\/td>\n<\/tr>\n
31<\/td>\n9.3 Design: Path C <\/td>\n<\/tr>\n
33<\/td>\n10 Requirements for installation of retrofit designs <\/td>\n<\/tr>\n
34<\/td>\n11 Requirements for testing and commissioning
11.1 Requirements for testing
11.2 Requirements for commissioning
11.3 Test certificates and commissioning records <\/td>\n<\/tr>\n
35<\/td>\n12 Requirements for handover
12.1 Specification of handover requirements
12.2 Handover recipients <\/td>\n<\/tr>\n
36<\/td>\n13 Requirements for retrofit advice
13.1 \uea01Delivery of Retrofit Advice\uea02
13.2 Retrofit advice: Path A <\/td>\n<\/tr>\n
37<\/td>\n13.3 Retrofit advice: Paths B and C <\/td>\n<\/tr>\n
38<\/td>\n14 Requirements for monitoring and evaluation
14.1 The purpose of monitoring and evaluation
14.2 Retrofit Evaluator
14.3 Levels of monitoring and evaluation
14.4 Basic monitoring and evaluation <\/td>\n<\/tr>\n
39<\/td>\n14.5 Intermediate monitoring and evaluation
14.6 Advanced monitoring and evaluation <\/td>\n<\/tr>\n
40<\/td>\n15 Claims of compliance
15.1 General
15.2 Basis of claim
15.3 Permitted forms of disclosure <\/td>\n<\/tr>\n
41<\/td>\n16 References <\/td>\n<\/tr>\n
64<\/td>\nContents <\/td>\n<\/tr>\n
66<\/td>\nForeword <\/td>\n<\/tr>\n
68<\/td>\nIntroduction <\/td>\n<\/tr>\n
70<\/td>\n1 Scope <\/td>\n<\/tr>\n
71<\/td>\n2 Normative references <\/td>\n<\/tr>\n
73<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
76<\/td>\n4 Retrofit project management <\/td>\n<\/tr>\n
77<\/td>\n5 The retrofit design <\/td>\n<\/tr>\n
79<\/td>\n6 Installation process <\/td>\n<\/tr>\n
83<\/td>\n7 Installation process management <\/td>\n<\/tr>\n
86<\/td>\n8 Service provision <\/td>\n<\/tr>\n
87<\/td>\n9 Claims of compliance <\/td>\n<\/tr>\n
88<\/td>\n10 Documents essential to the application of the Annexes of this PAS <\/td>\n<\/tr>\n
91<\/td>\nAnnex A (normative) Measure-specific Annex selection and co-installation requirements <\/td>\n<\/tr>\n
96<\/td>\nAnnex B (normative) BFM energy efficiency measure <\/td>\n<\/tr>\n
140<\/td>\nAnnex C (normative) BSM energy efficiency measures <\/td>\n<\/tr>\n
167<\/td>\nAnnex D (normative) BSE energy efficiency measures <\/td>\n<\/tr>\n
178<\/td>\nAnnex G (informative) Example installation project information collation form <\/td>\n<\/tr>\n
189<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Retrofitting dwellings for improved energy efficiency. Specification and guidance<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n198<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":390981,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1273,2641],"product_tag":[],"class_list":{"0":"post-390967","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-140-10","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/390967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/390981"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=390967"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=390967"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=390967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}