{"id":424003,"date":"2024-10-20T06:49:35","date_gmt":"2024-10-20T06:49:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e2168-5\/"},"modified":"2024-10-26T12:49:08","modified_gmt":"2024-10-26T12:49:08","slug":"astm-e2168-5","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e2168-5\/","title":{"rendered":"ASTM-E2168"},"content":{"rendered":"<\/p>\n
1.1 This classification establishes a classification for allowance, contingency, and reserve sums used in construction, project, and program estimating.<\/p>\n
1.2 This classification applies to all construction work.<\/p>\n
1.3 This classification is not based on permanent physical elements of construction (as defined and classified in Classification E 1557. Rather, the classification items are cost components common to construction, project, and program estimates.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Scope Referenced Documents Terminology Significance and Use <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Basis of Classification TABLE 1 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Keywords X1. GUIDANCE NOTES X1.1 X1.2 X1.3 X1.4 X1.5 X1.6 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" E2168-06 Standard Classification for Allowance, Contingency and Reserve Sums in Building Construction Estimating<\/b><\/p>\n |