{"id":440273,"date":"2024-10-20T08:13:59","date_gmt":"2024-10-20T08:13:59","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pas-20302023\/"},"modified":"2024-10-26T15:23:37","modified_gmt":"2024-10-26T15:23:37","slug":"bsi-pas-20302023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pas-20302023\/","title":{"rendered":"BSI PAS 2030:2023"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
5<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope <\/td>\n<\/tr>\n
10<\/td>\n2 Normative references
Standards publications <\/td>\n<\/tr>\n
12<\/td>\nOther publications <\/td>\n<\/tr>\n
13<\/td>\n3 Terms and definitions
3.1 client
3.2 commissioning
3.3 dwelling
3.4 EAS compliance
3.5 EEM product
3.6 EEM proprietary system
3.7 energy efficiency measure (EEM)
3.8 installation
3.9 installation location
3.10 installation method
3.11 installation method statement
3.12 Main Contractor <\/td>\n<\/tr>\n
14<\/td>\n3.13 operative
3.14 operative (experienced)
3.15 operative (new entrant)
3.16 personal certificate of competence
3.17 pre-installation building inspection
3.18 Recognition of Prior Experience
\nand Learning (RPEL)
3.19 Register of Regulated Qualifications (RRQ)
3.20 retrofit assessment
3.21 Retrofit Assessor <\/td>\n<\/tr>\n
15<\/td>\n3.22 Retrofit Coordinator
3.23 retrofit design
3.24 Retrofit Designer
3.25 Retrofit Installer
3.26 supervision
3.27 vocational competence
3.28 vocational competence (acquiring)
3.29 vocational competence ratio
3.30 vocational qualification
3.31 vocational qualification currency <\/td>\n<\/tr>\n
16<\/td>\n4 Retrofit project management <\/td>\n<\/tr>\n
17<\/td>\n5 The retrofit design
5.1 Retrofit Installer responsibility to be in possession of a retrofit design
5.2 Validation of the retrofit design <\/td>\n<\/tr>\n
19<\/td>\n6 Installation process
6.1 Installation method statement
6.2 Installation equipment and tools <\/td>\n<\/tr>\n
20<\/td>\n6.3 Checking, handling and storage of materials and supplies
6.4 Provision of installation instructions to operatives
6.5 People <\/td>\n<\/tr>\n
21<\/td>\n6.6 Subcontract Installers
6.7 Testing
6.8 Commissioning <\/td>\n<\/tr>\n
22<\/td>\n6.9 Handover
6.10 Installation control
6.11 Installation documents and
\nrecord keeping <\/td>\n<\/tr>\n
23<\/td>\n7 Installation process management
7.1 Operation and process oversight
7.2 Pre-installation building inspection <\/td>\n<\/tr>\n
24<\/td>\n7.4 Installation change
7.5 Process continuity plan <\/td>\n<\/tr>\n
25<\/td>\n7.6 Process control
7.7 Internal audit and corrective action
7.8 Installation process records
7.9 Business and financial probity <\/td>\n<\/tr>\n
26<\/td>\n8 Service provision
8.1 Complaints procedure
8.2 Complaints records
8.3 Interaction with clients <\/td>\n<\/tr>\n
27<\/td>\n9 Claims of compliance
9.1 Applicability of claims
9.2 Requirement to claim
9.3 Basis of claim <\/td>\n<\/tr>\n
28<\/td>\n10 Documents essential to the application of the Annexes of this PAS
10.1 Use of the identified documents
10.2 Publicly Available Specification and British Standards <\/td>\n<\/tr>\n
29<\/td>\n10.3 Institution of Gas Engineer and Managers \u2013 Standards <\/td>\n<\/tr>\n
30<\/td>\n10.4 Energy Networks Association Engineering Recommendations
10.5 UKLPG
10.6 Ministry of Housing, Communities and Local Government
10.7 Other insulation installation guidance references <\/td>\n<\/tr>\n
31<\/td>\nAnnex A (informative)
\nMeasure-specific annex selection and co-installation requirements
A.1 Introduction
A.2 Efficiency measures and types arranged by measure category <\/td>\n<\/tr>\n
33<\/td>\nA.3 Explanation of PAS 2030 measure-specific annex referencing system
A.4 Interactions between EEMs <\/td>\n<\/tr>\n
35<\/td>\nA.5 Avoidance of thermal bridging and infiltration <\/td>\n<\/tr>\n
36<\/td>\nAnnex B (normative)
\nBFM energy efficiency measures
B.1 Measure BFM.1 \u2013 Cavity wall insulation including that installed in party walls <\/td>\n<\/tr>\n
39<\/td>\nB.2 Measure BFM.2 \u2013 Draught proofing <\/td>\n<\/tr>\n
41<\/td>\nB.3 Measure BFM.3 \u2013 Energy efficient glazing and doors including replacement Insulating Glass Units (IGU) <\/td>\n<\/tr>\n
43<\/td>\nB.4 Measure BFM.4 \u2013 External wall insulation <\/td>\n<\/tr>\n
49<\/td>\nB.5 Measure BFM.5 \u2013 Flat roof insulation <\/td>\n<\/tr>\n
52<\/td>\nB.6 Measure BFM.6 \u2013 Floor insulation <\/td>\n<\/tr>\n
55<\/td>\nB.7 Measure BFM 7 \u2013 Hybrid wall insulation <\/td>\n<\/tr>\n
60<\/td>\nB.8 Measure BFM.8 \u2013 Internal wall insulation <\/td>\n<\/tr>\n
65<\/td>\nB.9 Measure BFM.9 \u2013 Loft insulation <\/td>\n<\/tr>\n
68<\/td>\nB.10 Measure BFM.10 \u2013 Pitched roof insulation <\/td>\n<\/tr>\n
71<\/td>\nB.11 BFM.11 \u2013 Solar blinds, shutters and shading devices (internal and external) <\/td>\n<\/tr>\n
74<\/td>\nB.12 BFM.12 \u2013 Room-in-roof insulation <\/td>\n<\/tr>\n
76<\/td>\nB.13 BFM.13: Insulation of existing park homes <\/td>\n<\/tr>\n
78<\/td>\nAnnex C (normative)
\nBSM energy efficiency measures
C.1 Measure BSM.1 \u2013 Condensing boilers, natural gas\u2011fired and liquefied petroleum gas-fired <\/td>\n<\/tr>\n
81<\/td>\nC.2 Measure BSM.2 \u2013 Oil-fired condensing boilers <\/td>\n<\/tr>\n
84<\/td>\nC.3 Measure BSM.3 \u2013 Flue-gas heat recovery devices <\/td>\n<\/tr>\n
86<\/td>\nC.4 Measure BSM.4: Heating system insulation
\n(ducting, pipes and cylinders) <\/td>\n<\/tr>\n
88<\/td>\nC.5 Measure BSM.5 \u2013 Heating, hot water system, air conditioning or ventilation controls and components <\/td>\n<\/tr>\n
91<\/td>\nC.6 Measure BSM.6 \u2013 Hot water systems <\/td>\n<\/tr>\n
94<\/td>\nC.7 Measure BSM.8 \u2013 Mechanical ventilation with heat recovery <\/td>\n<\/tr>\n
97<\/td>\nC.8 Measure BSM.8 \u2013 Under-floor heating <\/td>\n<\/tr>\n
100<\/td>\nC.9 Measure BSM.9 \u2013 Warm-air heating systems <\/td>\n<\/tr>\n
103<\/td>\nC.10 Measure BSM.10 Water efficient taps and showers <\/td>\n<\/tr>\n
105<\/td>\nAnnex D (normative)
\nBSE energy efficiency measures
D.1 Measure BSE.1 \u2013 Electric storage heaters
\n(including electric warm-air heating units that
\nincorporate heat storage) <\/td>\n<\/tr>\n
108<\/td>\nD.2 Measure BSE.2 Lighting fittings, lighting systems and lighting system controls <\/td>\n<\/tr>\n
110<\/td>\nAnnex E (informative)
\nPAS 2030:2017 to PAS 2030:2019 \u2013 Substantive changes <\/td>\n<\/tr>\n
113<\/td>\nAnnex F (informative)
\nRetrofit Installer guidance on the use and application
\nof PAS 2030
F.1 Overview
F.2 A staged approach to installation <\/td>\n<\/tr>\n
115<\/td>\nAnnex G (informative)
\nExample installation project information collation form
G.1 Use of this form
PAS 2030 Installation Process Record
G.2 Location of installation
G.3 Measure(s) to be installed <\/td>\n<\/tr>\n
116<\/td>\nG.4 Source of PAS 2035 compliant design (5.1)
G.5\u00a0Validation of design (5.2) <\/td>\n<\/tr>\n
117<\/td>\nG.6 Products and\/or system specified\/to be installed
G.7 Installation method statement <\/td>\n<\/tr>\n
118<\/td>\nG.8\u00a0Installation process <\/td>\n<\/tr>\n
121<\/td>\nG.9 Operation and process oversight
G.10\u00a0Pre-installation building inspection <\/td>\n<\/tr>\n
123<\/td>\nG.11 Provision for any intermediate inspection required (7.3)
G.12 Installation change (7.4)
G.13 Process continuity (7.5)
G.14 Process control records (7.6 & 7.8) <\/td>\n<\/tr>\n
124<\/td>\nG.15 Details of any problems encountered during installation, corrections agreed and remedial work undertaken
G.16 Client complaints (8) <\/td>\n<\/tr>\n
125<\/td>\nG.17 Commissioning \u2013 EEM performance testing carried out
G.18 Record of information left with client at handover
G.19\u00a0Installation sign-off <\/td>\n<\/tr>\n
126<\/td>\nBibliography
Standards publications
Other publications <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Installation of energy efficiency measures in existing dwellings. Specification<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n128<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":440281,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1273,2641],"product_tag":[],"class_list":{"0":"post-440273","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-140-10","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/440273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/440281"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=440273"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=440273"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=440273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}