{"id":447245,"date":"2024-10-20T08:50:58","date_gmt":"2024-10-20T08:50:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-8528-62023-tc\/"},"modified":"2024-10-26T16:29:32","modified_gmt":"2024-10-26T16:29:32","slug":"bs-iso-8528-62023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-8528-62023-tc\/","title":{"rendered":"BS ISO 8528-6:2023 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\n30482697 <\/td>\n<\/tr>\n
77<\/td>\nA-30450619 <\/td>\n<\/tr>\n
78<\/td>\nNational foreword <\/td>\n<\/tr>\n
83<\/td>\nForeword <\/td>\n<\/tr>\n
85<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
86<\/td>\n3 Terms, definitions and abbreviations
3.1 Terms and definitions <\/td>\n<\/tr>\n
91<\/td>\n3.2 Abbreviated terms
4 Other regulations and additional requirements <\/td>\n<\/tr>\n
92<\/td>\n5 General test requirements
5.1 General <\/td>\n<\/tr>\n
93<\/td>\n5.2 Measurement equipment accuracy <\/td>\n<\/tr>\n
94<\/td>\n6 Functional test
6.1 General
6.1.1 General
6.1.2 Physical functional test
6.1.3 Functional test by simulation
6.2 General inspection <\/td>\n<\/tr>\n
95<\/td>\n6.3 Measurements
6.4 Functional test report <\/td>\n<\/tr>\n
96<\/td>\n7 Type test
7.1 General
7.2 Testing conditions <\/td>\n<\/tr>\n
97<\/td>\n7.3 Characterisation of performance class
7.3.1 Steady state verification at constant power <\/td>\n<\/tr>\n
98<\/td>\n7.3.2 Verification of power-sharing capability
7.3.3 Step load test <\/td>\n<\/tr>\n
100<\/td>\n7.3.4 Start and stop time characteristics <\/td>\n<\/tr>\n
101<\/td>\n7.4 Reactive power capability
7.4.1 General
7.4.2 Verification of reactive power capability <\/td>\n<\/tr>\n
104<\/td>\n7.4.3 Test method for verification of reactive power capability control methods <\/td>\n<\/tr>\n
108<\/td>\n7.5 Verification of grid synchronization limits
7.5.1 General
7.5.2 Testing method for verification of grid synchronisation limits <\/td>\n<\/tr>\n
109<\/td>\n7.6 Test method for verification of FRT capability
7.6.1 General
7.6.2 Aim of the test
7.6.3 Documents to be provided before test <\/td>\n<\/tr>\n
110<\/td>\n7.6.4 Test method <\/td>\n<\/tr>\n
111<\/td>\n7.6.5 Acceptance criteria
7.7 Test method for verification of active power response to frequency variation
7.7.1 General
7.7.2 Aim of the test <\/td>\n<\/tr>\n
112<\/td>\n7.7.3 Documents to be provided before test
7.7.4 Test method <\/td>\n<\/tr>\n
113<\/td>\n7.7.5 Acceptance criteria
7.8 Test method for verification of generating set protections
7.8.1 General
7.8.2 Verification of generating set disconnection time from the grid <\/td>\n<\/tr>\n
114<\/td>\n7.8.3 Verification of protection limits <\/td>\n<\/tr>\n
115<\/td>\n8 Simulation-method-based assessment
8.1 General <\/td>\n<\/tr>\n
116<\/td>\n8.2 Specification of model blocks
8.2.1 General
8.2.2 Engine and engine controller or governor block <\/td>\n<\/tr>\n
117<\/td>\n8.2.3 AC generator block
8.2.4 Generating set controller block
8.2.5 Excitation controller (AVR) block
8.2.6 Exciter block
8.2.7 Protective devices block <\/td>\n<\/tr>\n
118<\/td>\n8.2.8 Measurement transformer (if applicable)
8.3 Simulation for ISO performance class in standalone island operation
8.3.1 General
8.3.2 Model validation for standalone island mode <\/td>\n<\/tr>\n
120<\/td>\n8.4 Simulation for generating sets used in grid connected applications
8.4.1 General
8.4.2 Requirements and methodologies for model validation <\/td>\n<\/tr>\n
121<\/td>\n8.4.3 Model validation for different grid requirements <\/td>\n<\/tr>\n
125<\/td>\n8.5 Assessment for generating set family
8.5.1 Methodology
8.5.2 Assessment for ISO performance class for family
8.5.3 Assessment for type test for family in grid parallel application <\/td>\n<\/tr>\n
126<\/td>\n9 Acceptance test
9.1 General
9.2 Responsibility
9.3 Preparation
9.3.1 Provision of auxiliary personnel, test equipment and operating materials <\/td>\n<\/tr>\n
127<\/td>\n9.3.2 Acceptance test preparation at the installation site
9.3.3 Acceptance test preparation at the manufacturer’s site or facility
9.3.4 Preliminary safety checks on generating set prior to testing
9.4 Further details <\/td>\n<\/tr>\n
128<\/td>\n9.5 Extent of acceptance test
9.5.1 General
9.5.2 Checks (C) <\/td>\n<\/tr>\n
129<\/td>\n9.5.3 Measurements (M) <\/td>\n<\/tr>\n
130<\/td>\n9.6 Accuracy of measurement equipment and acceptance test procedure
9.6.1 Measurement equipment accuracy
9.6.2 Warm-up time <\/td>\n<\/tr>\n
131<\/td>\n9.6.3 Generating set load test duration
9.6.4 Performing acceptance tests at the manufacturer\u2019s works
9.6.5 Installation site acceptance test <\/td>\n<\/tr>\n
132<\/td>\n9.7 Acceptance test report
9.7.1 General
9.7.2 General data <\/td>\n<\/tr>\n
134<\/td>\n9.7.3 Additional measured data for acceptance test <\/td>\n<\/tr>\n
135<\/td>\nAnnex A (informative) Test method using OVRT\/UVRT test equipment <\/td>\n<\/tr>\n
142<\/td>\nAnnex B (informative) Test method for frequency ride through requirements <\/td>\n<\/tr>\n
147<\/td>\nAnnex C (informative) Example load step test report <\/td>\n<\/tr>\n
149<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Reciprocating internal combustion engine driven alternating current generating sets – Test methods<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n151<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":447255,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[532,2641],"product_tag":[],"class_list":{"0":"post-447245","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-29-160-40","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/447245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/447255"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=447245"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=447245"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=447245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}